Powered By Kitlog Pro v2.0
Chris' Web Site
Fokker D.VII
Empennage
Work Logs Found:
31
Category Work Time:
166 Hours
Date
Hours
Work Log Summary
Details
04-06-2021
3.00
Tail Safety Wire
Details
03-19-2021
4.00
Final Tail Assembly
Details
06-15-2020
4.00
Cross Patee Insignia
Details
06-12-2020
4.00
Cross Patee Insignia
Details
06-10-2020
4.00
Empennage Paint
Details
06-09-2020
4.00
Empennage Paint
Details
06-08-2020
5.00
Empennage Paint
Details
06-06-2020
4.00
Empennage Paint
Details
06-05-2020
2.00
Empennage Paint & Radio
Details
06-03-2020
4.00
Empennage Paint
Details
06-02-2020
6.00
Empennage Paint & DC Converter
Details
05-30-2020
6.00
Empennage Perimeter Tapes
Details
05-29-2020
6.00
Empennage Perimeter Tapes
Details
05-28-2020
4.50
Empennage Perimeter Tapes
Details
05-27-2020
7.00
Empennage Perimeter Tapes
Details
05-25-2020
5.00
Empennage Covered & Reinforced
Details
05-24-2020
5.00
Elevator, Horizontal and Vertical Stabilizer
Details
05-22-2020
7.00
Covering the Elevator
Details
05-21-2020
6.00
Covering The Horizontal Stabilizer
Details
05-20-2020
6.00
Rudder Covered & Horizontal Stabilizer
Details
05-11-2020
3.00
Improved Vertical Stabilizer Bracket
Details
03-04-2018
4.00
Elevator Finished
Details
03-03-2018
4.50
Elevator
Details
02-24-2018
5.00
Tailwheel & Elevator
Details
02-10-2018
4.50
Rudder & Vert Stab
Details
01-28-2018
4.50
Rudder & Vert Stab
Details
01-27-2018
4.50
Horizontal Stabilizer Struts
Details
10-14-2017
5.00
Horizontal Stabilizer
Details
10-08-2017
5.50
Horizontal Stabilizer
Details
09-30-2017
4.50
Horizontal Stabilizer
Details
02-11-2017
24.00
Assemble Rudder Frame
Details
SITE NAVIGATION
Contact Builder
Fokker D.VII Home
Category
# Logs
# Hours
All
578
2401
Avionics
25
112
Cockpit Interior
39
172
Empennage
31
166
Engine
64
232
Fuselage
166
720
Landing Gear
34
148
Miscellaneous
19
20
None
6
4
Propulsion
11
20
Tools
6
9
Wings
177
798
Copyright © 2001-2024 Matronics. All Rights Reserved.