Powered By Kitlog Pro v2.0
Rob's REBVAIR Project
REBVAIR
Wing
Work Logs Found:
9
Category Work Time:
57 Hours
Date
Hours
Work Log Summary
Details
05-02-2021
6.00
wing root fairings
Details
11-21-2020
4.00
tank sloshing
Details
10-25-2020
1.00
Fuel tank calibration and flow test
Details
08-09-2019
15.00
wing paint
Details
07-22-2019
15.00
left wing wiring and wing tip
Details
06-29-2019
6.00
wing paint
Details
06-02-2019
4.00
wing tip wiring
Details
05-16-2019
4.00
Wing wiring
Details
03-13-2019
2.00
Sight gauge fuel bung install
Details
SITE NAVIGATION
Contact Builder
REBVAIR Home
Category
# Logs
# Hours
All
283
1774
control surfaces
4
51
controls
22
137
Cowling
22
108
elevator install
4
17
Empennage
7
86
Engine
5
10
engine accessories
3
8
Firewall Forward
48
365
Fuselage
74
450
gear install
10
86
General
4
58
Instrument Panel
48
217
paint
1
5
Panel
1
2
Parachute
11
41
Prop
1
2
Wing
9
57
wing install
9
74
Copyright © 2001-2024 Matronics. All Rights Reserved.