Darrel's Kitfox - SS7
DEW2
Fabric cover
Work Logs Found:
82
Category Work Time:
293 Hours
Date
Hours
Work Log Summary
Details
08-15-2019
1.10
A slow day
Details
08-08-2019
1.00
Not much to add
Details
08-07-2019
2.50
Sanded the left wing panel
Details
08-06-2019
2.10
Sanded top side of wing panel
Details
08-05-2019
1.50
Sprayed first cross coat of UV protection
Details
08-04-2019
3.20
Epoxied butt ribs, EkoBond top of wing panel, pain
Details
08-03-2019
2.20
Sanded/prepped the HT and rudder for UV paint
Details
08-02-2019
3.90
Closed off the leg fairings
Details
08-01-2019
4.00
Fixed the big opps!
Details
06-26-2019
2.20
Complete fabric install on gear legs
Details
06-24-2019
2.30
Paint booth and tape on gear legs
Details
06-15-2019
2.50
Covered the top side of the gear legs
Details
06-13-2019
2.50
Covered one side of each gear leg
Details
06-12-2019
2.50
Installed ribs in gear legs
Details
06-11-2019
5.90
Added reinforcement support to gear leg ribs
Details
06-10-2019
1.50
Fabricated the gear leg ribs
Details
06-09-2019
5.80
Began work on the undercarriage
Details
06-08-2019
2.20
Finished the left wing panel
Details
06-07-2019
4.20
Completed covering the left wing panel
Details
06-06-2019
6.00
Add finish tapes to left wing panel
Details
06-05-2019
5.80
Bottom rib and false rib taping
Details
06-04-2019
3.50
Added fabric tape to the bottom of left wing panel
Details
06-03-2019
5.60
Taped top of ribs
Details
06-02-2019
3.50
Rib stitched left wing
Details
06-01-2019
5.00
Rib stitch left wing
Details
05-31-2019
7.00
Ironed down pinked edges and taughtened fabric
Details
05-25-2019
1.20
Installed left wing tip
Details
05-24-2019
1.00
Detailed inboard and outboard ribs
Details
05-23-2019
4.00
Addtional work on bottom skin, left wing panel
Details
05-22-2019
3.90
Taughtened the fabric
Details
05-21-2019
3.00
Glued fabric on bottom left wing panel
Details
05-20-2019
4.50
Prepped left wing panel for covering
Details
05-19-2019
1.50
Right wing is complete
Details
05-18-2019
2.50
Glued the second tape in position
Details
05-15-2019
3.00
Installed leading edge tape
Details
05-14-2019
3.00
Finished glueing trailing edge
Details
05-13-2019
6.30
Installed inspection rings and trailing edge tape
Details
05-12-2019
2.00
Installed bottom false rib tape
Details
05-11-2019
8.00
Final install right wing tip and tape on false rib
Details
05-08-2019
4.30
More taping on the right wing
Details
05-07-2019
3.90
Started taping the right wing panel
Details
05-05-2019
2.50
Completed rib stitching - right wing
Details
05-04-2019
2.50
Spent a little time rib stitching the right wing
Details
05-03-2019
5.50
Prepped for rib stitching
Details
05-02-2019
5.50
Finished shrinking starboard wing panel
Details
05-01-2019
6.10
More prep work on the right wing
Details
04-30-2019
5.10
More detail work on the top of the right wing pane
Details
04-29-2019
7.50
Completed bottom of right wing
Details
04-28-2019
2.10
First shrink on bottom right wing
Details
04-27-2019
2.50
Started covering the first wing panel
Details
04-26-2019
7.50
Completed covering rudder
Details
04-25-2019
2.10
Added tape to rudder
Details
04-24-2019
2.90
Completed covering the rudder
Details
04-23-2019
3.50
Started covering the rudder
Details
04-22-2019
2.00
Completed the elevator
Details
04-21-2019
3.00
Completed final shrink on elevator and added 1 inc
Details
04-20-2019
8.00
Finished covering the elevator
Details
04-19-2019
2.90
Covered bottom of elevator
Details
04-18-2019
2.50
Completed HS and prepped the elevator
Details
04-17-2019
3.20
More taping on HS
Details
04-16-2019
3.10
Shrunk HS and started install of 1 inch finishing
Details
04-15-2019
2.10
FINISHED finish taping the fuselage!!
Details
04-14-2019
1.90
Added 1 inch finishing tape to VS
Details
04-13-2019
6.00
Covered the bottom of the HS
Details
04-12-2019
3.80
Covered the bottom of the HS
Details
04-11-2019
2.10
Added bias tape to the VS
Details
04-10-2019
4.00
Added reinforcement tape
Details
03-31-2019
6.50
Fuselage covering catch up report
Details
03-20-2019
1.00
Installed inspection and access rings
Details
03-18-2019
2.10
Cut and installed grommets
Details
03-17-2019
3.60
Tighten fuselage fabric to 250 F
Details
03-16-2019
4.50
Covered the vertical stabilizer
Details
03-15-2019
2.10
Shrunk the top right fabric panel
Details
03-14-2019
2.30
Installed the top right fuselage fabric panel
Details
03-13-2019
0.70
Added more epoxy to the bottom VS rib
Details
03-12-2019
2.80
Finished Top Left Panel
Details
03-02-2019
1.10
Installed the right side fabric panel
Details
03-01-2019
2.30
Prepped right side for fabric install
Details
02-28-2019
6.80
Covered left side of fuselage
Details
02-27-2019
6.50
Finished bottom and started left side panels
Details
02-26-2019
5.60
Fianl glue on bottom fabric
Details
02-25-2019
4.00
Rough installed fabric on fuselage bottom
Details
SITE NAVIGATION
Contact Builder
H-5 Home
DEW2 Home
Category
# Logs
# Hours
All
645
3091
Avionics
39
154
Basic Kit
3
14
Empennage
25
214
Engine
33
130
Engine
2
7
Fabric cover
82
293
Final assembly
9
48
Fuselage
119
701
Inspection
1
1
Kitfox Avionics
39
154
Kitfox tooling
6
14
Kitfox Undercarriage
11
45
Kitfox wings
64
389
Lighting
2
12
Miscellaneous
26
111
Modifications
11
21
Paint System
86
330
Tooling
2
0
Tooling
6
14
Tools
2
0
Undercarriage
11
45
Wings
2
5
Wings
64
389