Powered By Kitlog Pro v2.0
Tim's MTO Gyro Build
MTO Sport 2017
3.300 Baggage
Work Logs Found:
2
Category Work Time:
2 Hours
Date
Hours
Work Log Summary
Details
01-19-2019
1.00
installed baggage parts
Details
01-18-2019
1.50
Completed baggage door
Details
SITE NAVIGATION
Contact Builder
MTO Sport 2017 Home
Category
# Logs
# Hours
All
76
141
0.000 Unpack and Inv
1
4
1.100 Frame Prep
2
2
1.1000 Pushrod Assy
2
2
1.1100 Pedals
1
2
1.1150 Main Harness
3
6
1.1200 Thr/Ch cables
2
6
1.1300 Seats & Belts
3
8
1.1375 Rear Throttle
2
2
1.1400 Fuel System
5
8
1.1500 Battery/Fuse
1
2
1.200 Rear Undercarr
1
2
1.300 Rear Wheels
1
1
1.400 Nosewheel
2
1
1.500 Mast Top
2
3
1.600 Control Shaft
2
4
1.700 Rudder Cont
3
4
1.900 Rotor Head
2
3
1.950 Pneu Trim Cyl
1
0
2.100 Engine clutch
3
4
2.200 Engine Assy
4
16
2.300 Drive Shaft
1
0
3.100 Front cover
3
8
3.300 Baggage
2
2
3.400 Cockpit
2
6
3.500 Throttle/brake
2
6
3.625 Propeller
1
1
3.650 Ground run
2
5
3.675 Cockpit final
4
10
3.700 Seat cushion
3
6
3.800 Windscreen
1
2
4.050 Strobes
1
0
4.100 Tail plane
1
2
4.200 Rear cover
2
4
4.400 Tube handle
1
2
4.500 Wheel farings
1
1
4.700 Placards
1
0
999 Final pre-flight
5
6
Copyright © 2001-2024 Matronics. All Rights Reserved.