KitLog pro

Powered By Kitlog Pro v2.0

Mark Sanders RV-10
Work Logs Found: 189
Category Work Time: 566 Hours
 Date
Hours
Work Log Summary

Details

 10-31-2021
4.25
Build stiffners, match drill, finish edges, debur

 10-30-2021
3.00
Work on baggage door seal & close out channel
Details
     

 10-30-2021
1.15
Prep/drill baggage floor angles & floors per plans
     

 10-30-2021
1.20
Build baggage floor stiffners and edge finish
     

 10-29-2021
2.25
Make 2nd seat hinge; cleco floors per plans
     

 10-27-2021
1.75
Cleco/drill rear seat floors; make 1 seat hinge ha
     

 10-25-2021
1.20
Rivet baggage ribs to bulkhead + snap bushings

 10-18-2021
1.25
Rivet mid side skin to longerons

 10-16-2021
2.25
Rivet mid bottom skins, baggage ribs & baggage doo
Details

 10-09-2021
1.75
Install SS cabin heat boxes w/ sealant
Details
       

 10-04-2021
1.75
Rivet skins to 1006A,B,C per plans

 10-01-2021
2.00
Rivet skins to 1006. Bottom only.
Details

 09-26-2021
2.25
Rivet then Rejoin Fuse/Empennage
Details

 09-26-2021
1.25
Dimple/rivet, add nut plates per plan

 09-23-2021
1.25
Dimple and rivet per drawings

 09-21-2021
1.15
Dimple mid fuse / tailcone skins (top/bottom) & 10

 09-20-2021
1.40
Debur all components drilled

 09-18-2021
0.75
Remove TC from fus and debur 106B

 09-17-2021
1.40
MC ctrsink 1070 L/R side skins and longerons

 09-16-2021
2.00
M/C ctr sink 6 holes, match drill skins/1006
       

 09-13-2021
1.25
Attach/drill shims, top/side/and baggage flr angle

 09-12-2021
2.50
Drill ribs/flanges/L&R longerons; make shims
       

 09-11-2021
2.25
Join Mid-fuse and Empennage
Details
       

 08-18-2021
1.00
Rivet fwd fuse top skin to subpanel/subasy
Details

 08-15-2021
3.00
Rivet Fwd Fuse Top Skin to sub panel/subasy
Details
       

 02-03-2021
1.50
Rivet subpanel, subassys and control cable bkt

 02-02-2021
1.00
Step access panel/final asy &rivet subpanel
Details
       

 01-31-2021
7.00
Dimple fuse top skins/firewall; Ctrsink channnels
Details
       

 01-30-2021
8.00
Step access panels; ctrsink doublers/file skin edg
Details
       

 01-29-2021
3.25
Final/match drill top frnt skin; cut out step acce
Details

 01-23-2021
2.90
Flute 1003D&E, fit top skin to panel asy

 01-22-2021
3.50
Complete frnt fwd side skin rivets & fwd fuse ribs

 01-21-2021
0.50
Final torque all landing gear mount bolts to spec

 01-20-2021
2.75
Rmv co-pilot gear mount and remount
Details

 01-18-2021
1.50
Fit co-pilot ldg gear mount, torque pilot ldg gear

 01-17-2021
5.50
Finish riveting floor pans, cut 4 spacers, loose a

 01-16-2021
4.00
Rivet pilot and co-pilot floor pans

 01-15-2021
2.00
Finish fitting pilot pilot floor pan

 01-13-2021
2.50
Fabircate pilot floor pan

 01-10-2021
4.00
Fabricate Rt. front floor pan

 01-09-2021
3.00
Sub/inst panel, lwr flange subasy & match drill an

 01-03-2021
3.50
Floor pans, mid cabin decks and instr. panel assy.
Details

 01-01-2021
6.50
Rivet mid cabin decks, install soundex, fit left f
Details

 12-22-2020
2.25
Rivet front skin L/R Top channel to skins

 12-21-2020
2.75
Rivet left front side skin except top row

 12-18-2020
3.50
Rivet left fron side skin with Reid

 12-13-2020
1.50
Recountersink Rt Mid side skin understructure.
Details

 12-12-2020
5.50
Rivet mid side skins on Rt side
Details
       

 12-09-2020
2.00
Cleco angle and spacer to rib and drill recess hol
Details
     

 12-06-2020
6.00
Panel Flange, Rib and Subassy
Details
     

 11-28-2020
2.75
Fabricate spacer, angle and break apart components
Details
     

 11-28-2020
2.50
Continue riveting rt mid side skin
Details
       

 11-27-2020
6.50
Step Installation
Details
       

 11-18-2020
4.00
Rivet belly rivets of Rt front side skin

 11-13-2020
6.00
Asy, edge finish, install rivet L/R vent doors
Details
       

 10-27-2020
5.00
Rivet Rt/Lt mid side skin bottoms & side skins

 10-24-2020
6.00
Rivet Rt mid side skin

 10-22-2020
4.00
Rivet Lt mid side skin

 10-21-2020
1.00
Rivet mid side skins to understructure

 10-18-2020
5.00
Continue riveting mid side skins & re-countersink
Details
       

 10-17-2020
4.50
Rivet double row rivets on mid, fwd side skins

 10-16-2020
0.50
Cleco mid and fwd side skins, clips, spacers to un

 10-14-2020
0.50
Rivet fwd fuselage longerons to longeron gusset

 10-12-2020
1.00
Back rivet baggage floor shims to side skins
       

 10-11-2020
3.00
Rivet foremost holes in upper/lower channels
Details
       

 10-04-2020
5.00
Rivet upr/lwr channels to firewall mounts, firewal
Details
       

 10-01-2020
1.00
Rivet seat back brace, baggage door seal area
       

 09-27-2020
4.25
Remove baggage door, edge finish, finish skin dimp
Details

 09-20-2020
7.50
Dimple per plans skins,1015A outboard seat ribs an
Details

 09-15-2020
2.50
Countersink F-1004K side plate L/R
       

 09-13-2020
2.50
Countersink lft longeron, 1042L/R, 1005C L/R. 1004
       

 08-30-2020
5.00
Countersink Mid-Cabin Decks
       

 08-29-2020
3.00
Edge finish components and countersink

 08-26-2020
1.00
Edge finish and debur

 08-22-2020
6.00
Debur & edge finish

 08-20-2020
1.00
Debbur edge finish components

 08-18-2020
1.00
Debur, edge finish front skeleton components

 08-17-2020
1.25
Debur and edge finish components front skeleton

 08-05-2020
2.25
Remove skins, drill rudder atch holes, check align
Details

 08-03-2020
2.50
Drill side skins and understructure

 08-02-2020
3.00
Drill side skins to understructure, fronts
       

 08-01-2020
2.50
Bend rh frnt skin, fit to understructure
       

 07-27-2020
3.25
Cleco skin to skeleton 3x, chk WD-1002-l to F-1041
       

 07-26-2020
1.40
Mark and bend clip, separate gusset, cleco compone

 07-23-2020
1.00
Roll / fit fuse side skin
       

 07-18-2020
1.25
Twist Upr/Lwr longeron fuse channel
       

 07-17-2020
6.25
Drill skins & understructure L&R, longerons, drill
Details

 07-14-2020
1.10
Per Plan
Details

 07-14-2020
0.75
Attach skins, spacers to substructure
       

 07-12-2020
5.25
Drill longerons & substructure, midcabin decks, cn
       

 07-01-2020
1.25
Roll L&R side skins & test fit
       

 06-26-2020
2.25
Create clamp block, angle, mark rool line & match
       

 06-18-2020
0.15
Twist longerons

 05-09-2020
3.50
Bend mid-fuselage longeron per template, drill, be

 05-01-2020
1.25
Drill nut plate holes, dimple, rivet nut plates x4
       

 04-19-2020
2.00
Mount, drill landing gear mt, fllor pans, ribs, sh

 04-18-2020
0.50
Cut shims x2

 04-17-2020
1.50
Rivet side plates, channels & 1043A-L/R

 04-07-2020
1.65
Rivet and bolt
Details

 04-06-2020
1.00
Nutplate and Mid-Seat Rail riveting
Details

 04-06-2020
3.00
Ctr sink 7x2 ctr sect, rivet blk hd, skins, sys bk
Details

 04-05-2020
1.75
Bottom skin rivet, m/c ctr snk nutplate holes, + M
Details

 04-04-2020
2.50
Rivet nutplates to seat floor assemblies
Details

 04-03-2020
1.00
Rivet L/R Seat Floor Angle/Strip to Seat Floor

 04-02-2020
1.75
Countersink Strips, Alumiprep, Debur, Prime

 03-30-2020
2.00


 03-28-2020
1.50
Rivet blkhds and bottom skins

 03-27-2020
4.00
Rivet bottom skins and fwd ctr section blkhd & sys

 03-26-2020
2.00
Rivet Aft Ctr Section Blkhd Asy & Bottom Skins

 03-20-2020
1.25
Bolt Fwd Ctr Section, Ribs, Rivet Webs; Mate F/RR
Details

 03-15-2020
1.00
Rivet Atch Angles, Fire Seal Firewall to Bottom Sk
       

 03-14-2020
9.00
Rivet Fwd Fuse Blkhds and Bottom Skin & Sys Bkts
       

 03-13-2020
1.00
Finish riveting bkts, ribs to bottom skin

 03-11-2020
3.50
Continue riveting bkts & ribs to bottom skin

 03-09-2020
0.50
Rivet floor ribs & brackets to bottom skin
       

 03-07-2020
3.50
Rivet ntplates multiple pts, seat rails, Atch Angl

 03-02-2020
2.75
Finish dimpling bottm skin, Alumi-prep, Prime

 02-29-2020
7.00
Seat Floors, SF Attach Strip & Angle

 02-24-2020
1.00
Dimple bottom skin & Roll Edge
     

 02-23-2020
6.25
Process Floor Ribs, brackets and bottom skin
Details
       

 02-22-2020
7.50
Ctr Snk Fwd Bulkhead Asy Btm Holes plus More
Details
       

 02-19-2020
1.50
Separate Skin/Bulkheads and debur / rr dimple skin

 02-17-2020
1.25
Debur, dimple, edge finish systems brackets

 02-16-2020
1.00
Dimple, Counter Sink Center Side Plates & Debur
Details
       

 02-08-2020
2.50
Final Drill Bottom Skins, Ctr Side Plates & Blk He
Details
       

 01-01-2020
2.25
Mate Fwd Ctr Section to Fwd Fuse & Bolt
Details
       

 12-31-2019
2.75
Drill and dimple floorpans and other components
Details
       

 12-30-2019
1.50
Final drill bottom fuse skin & components
Details
       

 12-29-2019
1.25
Match drill Control Column Mt, Drill components
Details

 12-28-2019
3.50
FWD Fuse Bulkhead SubAsy
       

 12-26-2019
10.75
Alumi-Prep, Prime, Rivit Seat Rail Spts, Nutplates
Details
       

 12-25-2019
2.25
Fabricate / Finish Control Column Mount
Details
       

 12-24-2019
3.00
Fwrd Seat Rail Supports, Bulkhead Side Channels
Details

 12-23-2019
6.50
Attach Angles & Seat Rail Supports
Details

 12-22-2019
6.50
Rivit nose gear tension, rib asy, firewall & Fuel
Details
       

 12-21-2019
8.25
Rivet Tunnel Access Cover Panels & Nose Gear Fitti
Details

 11-09-2019
2.00
Tunnel Access Cover
Details
     

 11-01-2019
6.50
Rivet bkts, M/C access tunnel rt/lt cover/re-enf.
Details
       

 10-31-2019
1.75
Layout, cut, edge finish, drill, fit up right tunn
Details
       

 10-30-2019
3.00
Layout, cut, edge finish, drill, fit left tunnel
Details
       

 10-28-2019
3.00
Finish fuselage baggage rib riveting & rib subasy
Details
       

 10-27-2019
5.00
Rivet recess box and firewall compoents
Details
     

 10-26-2019
6.00
Rivet firewall components to firewall
Details
       

 10-24-2019
2.00
Rivet lower channel diagonal
     

 10-20-2019
5.25
Alumi prep, prime, edge finish, & scat tube spt
Details
     

 10-19-2019
3.50
M/C Countersink firewall components
     

 10-17-2019
1.50
Rivet baggage ribs to rear bulkhead asy
       

 10-10-2019
2.50
Drill baggage rivets to dimple baggage ribs (misse
Details

 10-06-2019
3.50
Finish edge prep parts / stainless / recess box
Details
       

 10-05-2019
3.75
Rivet bottom skins, edge finish, debur firewall pa
     

 10-02-2019
2.00
Rivet bottom skins

 09-29-2019
6.50
Cleco, final drill firewall atach; Rivet bottom sk
       

 09-28-2019
2.50
Drill, dimple, rivet recess box
     

 09-28-2019
1.00
Drill / Replace nonconforming rivets in bottom ski

 09-25-2019
2.00
Rivet stiffners to skins
       

 09-15-2019
6.00
Rivet mid / center bottm skins to ribs / blkheads
     

 09-14-2019
2.50
Alumi-prep / prime mid / ctr bottom skins & cleco
       

 09-08-2019
3.75
Debur, Edge finish, Roll skin edge, Dimple skins
     

 08-29-2019
1.50
Rivet keeper rivets, debur skin, finish skin edges
       

 08-26-2019
1.00
Rivet step brackets x 2
       

 08-24-2019
4.25
Rivet, countersink, dimple, countersink, prime
Details
     

 08-23-2019
3.00
Dimple, alumi-prep, prime
Details

 08-22-2019
1.50
Rivet Ribs to Fuse bulkhead (3 ribs)
       

 08-21-2019
2.00
Rivet Fuse Ribs
Details
       

 08-20-2019
1.50
Rivet rib subasy, blkhd side chanls to rear spar
Details
     

 08-19-2019
1.15
Disassemble bottom skin from ribs and rivet
     

 08-17-2019
2.25
Flute ribs and alumi-prep
Details
     

 08-15-2019
3.15
Torque bolts, Asy / rivet heat duct Tee & Flap Bkt
     

 02-16-2019
5.25
File, debur radius corners on fuse ribs
Details

 01-26-2019
5.75
Pre-assemble, match drill center & mid skin to str
Details
       

 01-25-2019
1.00
Create Rear Seat Rib Subassy's & Assy Substructure
Details
     

 01-21-2019
1.00
Flute outboard seat ribs
       

 01-20-2019
4.50
Assemble, match drill, debur
     

 01-19-2019
3.75
Rivet Outboard Seat Assy & Intercostal Nutplates
       

 01-13-2019
3.00
Rivet F1004J center section upright bars & finish
Details
       

 01-12-2019
9.00
Prep, drill, assemble outboard seat rib subassembl
Details
       

 01-08-2019
0.50
Dimple screw & nutplate holes & countersink

 01-06-2019
1.50
Drill, Finish Edges R&L Inboard Seat Rib Subassy'
       

 01-04-2019
2.00
Finish riveting aft seat rail spt asy's; torque al
Details

 01-03-2019
4.00
Prime parts, deburr, Rivet rear spar bulkhead comp
Details

 12-27-2018
5.00
Rivet and bolt aft bulkhead and components and fab
Details

 12-26-2018
9.00
Finish prep aft center bulkhead asy, Begin aft ce
Details

 12-24-2018
0.50
Alumiprep and prime parts

 12-23-2018
7.75
Aft seat rail support subassy, mfg hat stiffners,
Details

 12-22-2018
2.50
Finish riveting, drill & insert snap bushings

 12-21-2018
3.50
Rivet mid-seat rail supports, nutplates, stiffener

 12-15-2018
8.00
Drill Ldg Gear mounts & prime / paint parts

 12-11-2018
1.50
Drill fwd center section; pilot lndg gear bkt hole

 12-09-2018
1.00
Cretae & match drill stiffener angles










Copyright © 2001-2024 Matronics. All Rights Reserved.