Powered By Kitlog Pro v2.0
Davids Pipistrel Build Website
Virus SW 912iS
Parachute
Work Logs Found:
16
Category Work Time:
38 Hours
Date
Hours
Work Log Summary
Details
03-17-2018
5.00
Installed parachute strap covers
Details
03-11-2018
2.00
Installed parachute cover
Details
03-05-2018
0.50
Fitted parachute cover
Details
02-18-2018
1.00
Attached stickers to parachute cover and exhaust
Details
02-17-2018
2.00
Fit and glued in parachute cover
Details
02-17-2018
3.00
Attached parachute to retaining straps and rocket
Details
02-10-2018
1.00
Installed parachute and fuselage straps
Details
02-10-2018
2.00
Attached straps to top of fuselage, cut slots for
Details
02-04-2018
2.00
Installed parachute retaining straps
Details
02-03-2018
3.00
Installed parachute release handle
Details
01-28-2018
2.00
Re-installed rocket
Details
01-27-2018
5.00
Attached exhaust tube to fuselage
Details
01-21-2018
2.00
Drilled hole in fuselage for rocket exhaust tube
Details
01-20-2018
4.00
Fit exhaust tube on rocket
Details
01-14-2018
2.00
Trial fit rocket
Details
01-13-2018
2.00
Unpacked parachute
Details
SITE NAVIGATION
Contact Builder
Virus SW 912iS Home
Category
# Logs
# Hours
All
420
1261
Ailerons
14
50
Avionics
41
96
Baffling And Cooling
7
16
Baggage Area
3
7
Brake System
9
35
Busses
29
132
Canopy
13
30
Center Fuselage
2
10
Doors
25
58
Empennage
1
1
Engine
16
66
Flight Controls
34
110
Forward Fuselage
15
64
Fuel Lines
18
50
Fuel System
18
50
Fuel Tanks
3
5
Gear Fairings
2
2
Horizontal Stabilizer
5
14
Main Gear
8
18
Miscellaneous
41
92
Nosewheel
6
24
Parachute
16
38
Parts Preparation
24
56
Prop
5
4
Rear Fuselage
1
2
Rudder
3
10
Tools
2
8
Vertical Stabilizer
1
4
Windshield
13
30
Wing Tips
6
11
Wings
4
18
Wings to Fuselage
6
18
Wiring
29
132
Copyright © 2001-2024 Matronics. All Rights Reserved.