Powered By Kitlog Pro v2.0
Davids Pipistrel Build Website
Virus SW 912iS
Fuel System
Work Logs Found:
18
Category Work Time:
50 Hours
Date
Hours
Work Log Summary
Details
04-21-2019
0.50
Affixed fuel lines to bottom of fuselage
12-29-2017
2.00
Re-installed left wing to aux tank fuel lines
Details
12-29-2017
2.00
Installed right wing to aux tank fuel lines
Details
11-19-2017
2.00
Installed left fuel lines from wing to aux tank
Details
11-18-2017
3.00
Installed fuel lines and pass-thru plate on right
Details
09-10-2017
2.00
Tested fuel system for leaks
Details
05-06-2017
3.00
Install fuel pump wiring
Details
01-07-2017
8.00
Installed fuel lines
Details
11-05-2016
0.50
Installed fuel gascolator
Details
08-27-2016
6.00
Replace fuel selector valve and lines with updated
Details
03-18-2016
1.50
Attached fuel vent line and attached pass thru cov
Details
03-17-2016
1.50
Attached fuel supply line from wing
Details
03-12-2016
1.00
Layed out fuel line connections to the wing
Details
07-12-2015
10.00
Finished routing and installing fuel lines
Details
06-21-2015
1.00
Installed fuel pump and fuel boost pump in baggage
Details
06-07-2015
4.50
Mounted Secondary Fuel tanks
Details
05-26-2015
1.00
Installed fuel tank selector and fuel line
Details
05-23-2015
1.00
Cut hole in firewall and attached source and retur
SITE NAVIGATION
Contact Builder
Virus SW 912iS Home
Category
# Logs
# Hours
All
420
1261
Ailerons
14
50
Avionics
41
96
Baffling And Cooling
7
16
Baggage Area
3
7
Brake System
9
35
Busses
29
132
Canopy
13
30
Center Fuselage
2
10
Doors
25
58
Empennage
1
1
Engine
16
66
Flight Controls
34
110
Forward Fuselage
15
64
Fuel Lines
18
50
Fuel System
18
50
Fuel Tanks
3
5
Gear Fairings
2
2
Horizontal Stabilizer
5
14
Main Gear
8
18
Miscellaneous
41
92
Nosewheel
6
24
Parachute
16
38
Parts Preparation
24
56
Prop
5
4
Rear Fuselage
1
2
Rudder
3
10
Tools
2
8
Vertical Stabilizer
1
4
Windshield
13
30
Wing Tips
6
11
Wings
4
18
Wings to Fuselage
6
18
Wiring
29
132
Copyright © 2001-2024 Matronics. All Rights Reserved.