Powered By Kitlog Pro v2.0
Davids Pipistrel Build Website
Virus SW 912iS
Wiring
Work Logs Found:
29
Category Work Time:
132 Hours
Date
Hours
Work Log Summary
Details
04-27-2019
4.00
Zip tied wiring in instrument panel
02-09-2019
1.00
Tested everything on Power Panel
02-09-2019
2.00
Installed power panel
01-26-2019
6.00
Routed wires in bottom of instrument panel and wir
01-12-2019
1.00
Drilled holes in base of Instrument panel for wire
12-16-2018
1.00
Wired up landing light current limiter harness
12-01-2018
2.00
Connected Landing Light to power panel
Details
11-10-2018
3.00
Routed, connected general wiring harness connector
Details
10-27-2018
1.50
Added sheathing to trim position indication wires
Details
10-21-2018
4.00
Added connectors to general power harness
Details
10-20-2018
3.00
Added X83 radio connector to harness, connected
Details
10-14-2018
6.00
Threaded new hardesses through fuselage wire tube
Details
10-07-2018
4.00
Fixed Dynon power wires in supplied harness
Details
09-08-2018
18.00
Designed and manufactured COM wire harness
Details
09-01-2018
16.00
Designed and built general power wire harness
Details
08-25-2018
2.00
Attached connector and cap to Aileron Servo
Details
08-25-2018
2.00
Added cap to Elevator Servo wire harness
Details
08-20-2018
4.00
Manufactured Elevator Servo wire harness
Details
11-05-2017
16.00
Completed power panel wiring
Details
09-23-2017
4.00
Finished D1000 main wire harness
Details
09-20-2017
1.00
Made one Headphone Jack wire harness
Details
09-09-2017
1.50
Installed power connectors on Dynon cables
Details
07-22-2017
3.50
Wire tied hoses and wires in engine compartment
07-16-2017
1.50
Installed wiring for landing light
Details
04-22-2017
16.00
Planning, labeling and installing circuit breakers
Details
08-28-2016
2.00
Replaced main electrical board with updated board
Details
09-02-2015
1.00
Installed Rotax electronics to Pipistrel firewall
08-30-2015
1.00
Attached the main 12volt distribution board
Details
08-28-2015
4.00
Wired the main 12 volt bus with key box
Details
SITE NAVIGATION
Contact Builder
Virus SW 912iS Home
Category
# Logs
# Hours
All
420
1261
Ailerons
14
50
Avionics
41
96
Baffling And Cooling
7
16
Baggage Area
3
7
Brake System
9
35
Busses
29
132
Canopy
13
30
Center Fuselage
2
10
Doors
25
58
Empennage
1
1
Engine
16
66
Flight Controls
34
110
Forward Fuselage
15
64
Fuel Lines
18
50
Fuel System
18
50
Fuel Tanks
3
5
Gear Fairings
2
2
Horizontal Stabilizer
5
14
Main Gear
8
18
Miscellaneous
41
92
Nosewheel
6
24
Parachute
16
38
Parts Preparation
24
56
Prop
5
4
Rear Fuselage
1
2
Rudder
3
10
Tools
2
8
Vertical Stabilizer
1
4
Windshield
13
30
Wing Tips
6
11
Wings
4
18
Wings to Fuselage
6
18
Wiring
29
132
Copyright © 2001-2024 Matronics. All Rights Reserved.