KitLog pro

Powered By Kitlog Pro v2.0

Adam's CH750 Cruzer
Work Logs Found: 23
Category Work Time: 58 Hours
 Date
Hours
Work Log Summary

Details

 01-25-2020
3.00
Working on elevator cable pulleys
Details
       

 01-12-2020
4.50
Riveting gusset plates and installing trim servo
Details
       

 12-31-2019
3.00
Riveting tail gusset plate
Details
       

 12-30-2019
2.50
Finished drilling mounting holes for horizontal st
Details
       

 12-24-2019
1.00
Clecoed on horizontal stabilizer gusset plates
Details
       

 12-22-2019
3.00
Riveted elevator, started to drill horizontal stab
Details
       

 12-15-2019
5.00
Finished drilling out elevator, worked on leveling
Details
       

 11-24-2019
3.00
Fit and drilled new elevator hinge
Details
       

 11-16-2019
2.50
Continued fitting elevator and attaching trim tab.
Details
       

 10-12-2019
2.00
Started building new elevator.
Details
       

 08-11-2019
1.00
Finished attempting to fix elevator twist.
Details
       

 07-14-2019
2.00
Attempt to fix elevator twist
Details
       

 06-30-2019
0.50
Finished opening up the twisted side of elevator.
Details
     

 06-22-2019
0.50
Removed two ribs to diagnose elevator twist
Details
     

 06-16-2019
1.00
Trimmed horizontal stabilizer caps and test fit el
Details
       

 06-09-2019
5.50
Finished elevator
Details
       

 02-09-2019
1.00
Elevator
Details
       

 01-19-2019
2.00
Tim tab motor
Details
       

 01-06-2019
4.00
Elevator assembly, hinge fitting.
Details
       

 12-16-2018
4.50
Substantial completion of horizontal stabilizer
Details
       

 12-09-2018
2.00
Started horizontal stabilizer skin and tip ribs
Details
       

 12-09-2018
3.00
Assembling horizontal stabilizer skeleton
Details
       

 12-02-2018
1.00
Started on the horizontal stabilizer
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.