KitLog pro

Powered By Kitlog Pro v2.0

Jeffs Web Site
Work Logs Found: 54
Category Work Time: 146 Hours
 Date
Hours
Work Log Summary

Details

 08-14-2018
4.00
completed nav/strob fairings
Details
       

 08-12-2018
1.00
trimmed left nav/strob fairing
Details

 08-10-2018
2.00
completed wingtip
Details
       

 08-09-2018
1.00
continued left wingtip
Details
       

 08-08-2018
3.00
left wing top skins
Details
       

 08-07-2018
3.00
started left wing lighting
Details
       

 08-07-2018
1.00
fit wingtip fiberglass
Details
       

 08-06-2018
1.50
Trim tip lighting fiberglass
Details
     

 08-06-2018
3.00
completed right wingtip
Details

 08-05-2018
2.00
wingtip construction begins
Details
       

 08-05-2018
3.00
upper wing skins
Details
       

 08-05-2018
3.00
fit landing light
Details
       

 08-05-2018
3.00
continued wing skin install
Details
       

 08-04-2018
0.50
Recieved and inventoried lighting kit
Details
       

 08-04-2018
1.00
landing light cutout
Details
       

 08-04-2018
1.00
fitting landing light lense
Details
       

 01-22-2018
3.00
Completed left flaperon construction
Details
       

 01-18-2018
4.00
continued construction of right flaperon
Details
       

 01-14-2018
1.00
Began right flaperon skeleton construction
Details
       

 01-13-2018
3.00
continued flaperon assembly
Details
       

 01-13-2018
2.00
assembled flaperon skeleton
Details
       

 01-12-2018
4.00
preped flaperon nose ribs
Details
       

 01-11-2018
2.00
installed middle right wing skin
Details
       

 01-11-2018
3.00
Flipped over wing and riveted leading edge
Details
       

 01-09-2018
2.00
installed out right wing skin
Details
     

 01-09-2018
4.00
Installed inner wing skin on right wing
Details
       

 01-08-2018
2.00
Riveted leading edge of left wing and installed hi
Details
       

 01-08-2018
3.00
Installed lower middle skin
Details
       

 01-08-2018
1.00
inspection cover
Details
       

 01-07-2018
3.00
installed bottom outer wing skin
Details
       

 01-06-2018
2.00
installed wiring and wing root connectors
Details
       

 01-06-2018
5.00
bottom wing skin installation
Details
       

 01-06-2018
2.00
assembled stall warning
Details
       

 01-05-2018
4.00
completed skeleton of right wing
Details
       

 01-05-2018
3.00
Added nose ribs and stub spar to left wing
Details
       

 01-05-2018
2.00
added main ribs to right spar
Details
       

 01-04-2018
2.00
rib attach
Details
       

 01-04-2018
6.00
preped right main ribs
Details

 01-04-2018
2.00
match drill ribs for hinge brackets and doublers
Details
       

 01-04-2018
1.00
installed rear spar
Details
       

 01-03-2018
8.00
Begain prep of main wing ribs
Details
       

 01-02-2018
4.00
completed prep of Right nose ribs
Details

 01-02-2018
2.00
added nutplates and doublers
Details
       

 01-01-2018
3.00
right nose rib prep
Details

 01-01-2018
3.00
continued rib prep
Details

 01-01-2018
5.00
began preping wing ribs
Details
       

 12-31-2017
4.00
prepaired rear spars
Details
       

 12-31-2017
2.00
completed rear spars
Details
       

 12-31-2017
3.00
assmbled hinge brackets
Details
       

 12-30-2017
3.00
prepred stub spar and hinge brackets
Details
       

 12-30-2017
3.00
attached attach angles
Details
       

 12-30-2017
1.00
assmbled stub spar
Details
       

 12-29-2017
3.00
Inventoried Wing kit
Details
       

 12-29-2017
3.00
begain prep of wing spar
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.