KitLog pro

Powered By Kitlog Pro v2.0

Mark Sanders RV-10
Work Logs Found: 128
Category Work Time: 478 Hours
 Date
Hours
Work Log Summary

Details

 08-14-2021
1.40
Service Bulletin Bottom Rudder Hinge Bkt - Replace
Details
       

 11-11-2018
0.50
Mount shoulder harness anchors

 11-11-2018
0.00
Finished!!
       

 11-02-2018
1.50
Rivet aft top skin
       

 10-27-2018
4.00
Build Static Port Bkt, Prime, Mount, Proseal Ports
Details
       

 10-07-2018
1.50
Set trim cables & braket pos. to achieve trim spec
     

 10-06-2018
3.50
Match drill rudder cable atch bkts to service plat
Details
     

 09-30-2018
2.00
Atch/Adj Rudder & remove. Attach elevator trim cab
Details
       

 09-29-2018
8.00
Prep/Asy trim mt. bkt; bellcrank installation, tri
Details
       

 09-25-2018
2.00
Elevator Stop Bkt. Trim to correct dimension per S
Details
       

 09-23-2018
1.50
Reinstall elevators, install pushrod asy to bellcr
     

 09-22-2018
8.00
Build Trim bellcrank bkts & anchor bkts; Fit servo
       

 09-15-2018
2.00
Drill spacers & HZ Stab & Tailcone & Atch Hdw
       

 09-03-2018
4.00
Make 4 1098 shims, drill VS attach bolt
Details
       

 09-02-2018
8.00
Fit up / mount elevators & adjust. Drill push rod,
       

 08-25-2018
5.00
Finish elevator trim tabs and safety wire
Details
       

 08-21-2018
1.50
Edge file, dimple, alumi-prep & prime top middle t

 08-20-2018
1.00
Debur tailcone top skin and holes

 08-19-2018
7.00
Rivet aft deck

 08-18-2018
3.00
Installing aft deck hardward & bolt/attache bellcr
       

 08-17-2018
1.00
Rivet side skins and longerons under aft deck

 08-15-2018
1.50
Complete tailcone riveting
     

 08-13-2018
1.20
Rivet bellcrsnk ribs to bottom skins
     

 08-06-2018
3.00
Rivet bottom tailcone skins
     

 08-05-2018
0.75
Rivet sideskins/frames/bulkheads
       

 07-16-2018
1.50
Rivet bellcrank rib angles / nutplates to Belcrank
       

 07-15-2018
3.00
Rivet cone skins & frsmes
     

 07-08-2018
5.00
Rivet left skin / stiffners

 07-07-2018
3.00
Rivet left skin / stiffners
     

 07-06-2018
2.50
Rivet right skin / stiffners
     

 07-05-2018
2.50
Rviet right skin / stiffners
     

 06-24-2018
1.00
Rivet right skin / stiffners
     

 06-23-2018
2.75
Rivet Rt skin / stiffners
     

 05-27-2018
2.00
Rivet bottom skin and stiffners
     

 05-26-2018
3.50
Rivet bottom skin and stiffners
     

 05-19-2018
4.00
Battery channel, bellcrank & Asy
       

 05-19-2018
4.00
Alumi-Prep, prime, countersink, rivet frames/bulkh
Details
       

 05-19-2018
0.00
Additional Pics Bulkheads
Details
       

 05-19-2018
0.00
Additional Pics Battery Tray & Bulkheads
       

 05-06-2018
5.50
Tap tie Down Bkt and continue disassembly/debur
Details
     

 04-29-2018
4.00
Begin disassembly of TC, Debur, dimple
       

 04-28-2018
1.50
Rt Elev. Trim Match Drill to Elev and Trim & rivet

 04-26-2018
3.00
Rivet Rudder TE, Proseal TE, Roll Elv Leading Edge
Details
       

 04-23-2018
0.75
Position/Drill Shoulder harness & cover plate & st

 04-22-2018
2.50
Drill aft deck and bkts per plans
     

 04-21-2018
4.00
Add top skins, match/final drill
     

 04-19-2018
6.50
Mfg Hz Stab Bkt, & Elevator Stop (to SB specificat
Details
     

 04-18-2018
10.00
Pre-Asy tailcone, mfg stop brace & spacer & match
Details
       

 04-05-2018
2.00
Cut, edge prep and cleco rudder stiffners, bellcra
     

 04-01-2018
8.00
Fit Rear Bulkhead Asy, Lower RR Skin and Mat Drill
Details
       

 03-31-2018
7.00
Make Stiffners, Longerons, Edge Prep and PreAsy
Details
       

 03-30-2018
9.00
Begin Tailcone
Details

 03-24-2018
10.50
Cut/Atch Elev. CtrBalances & Complete Trim Tabs
       

 03-23-2018
2.00
Trim Tab Hinge Asy & Mount
       

 02-18-2018
7.00
Rivet Counterbalances to Elevators and All Remainn
       

 02-17-2018
5.50
Finish Riveting Front Spar/Skins, Gussets and Inbo
Details
       

 02-04-2018
1.00
Rivet Rt Elev Skin to Front Spar

 02-03-2018
2.50
Rivet Rt/LT Internal Elevator Ribs together and to
       

 02-02-2018
2.50
Rivet Rt/Lt Elevator Skins to Ribs

 02-01-2018
0.75
Edge Finish Elevator Trim Tab

 01-28-2018
5.50
Back Rivet Rt Elevator rib halves to skin & rear s
       

 01-27-2018
7.00
Prime all parts, Rivet counterbalance skins, ribs,

 01-26-2018
2.50
Finish Rt Elev. and Counterbalance Skin Edges, Sim

 01-21-2018
5.00
Debur Rt Elev. comp, dimple front/rr spars, ribs,

 01-20-2018
4.00
DisAsy Rt Elev., Debur Rt Elev. Skins, M/C Cntrsnk
Details

 01-14-2018
3.00
Rivet Left Elevators Top Skin, Ribs, Gusset, Shear
       

 01-14-2018
2.50
Rivet Left Elev. Reinforcement Plate, Nutplate & t
       

 01-07-2018
6.00
Rivet Left Elevator Horn, Front Spar Reenf. Plates
       

 01-06-2018
3.00
Dimple Counter Balance, Edge FInish, Alumi=prep al
     

 01-04-2018
1.50
Debur, Edge Finish, Dimple Top Skim Left Elevator

 01-01-2018
6.00
Finish Left Elev. Rib Debur/Dimpling, Dimple Botto
Details
       

 12-31-2017
4.50
Disassemble Left Elev., Dimple F/R Spar, Ribs, Deb
Details
     

 12-28-2017
4.75
Finish Match Drilling Skins/Asy, Build Cover Plate
     

 12-27-2017
3.75
Match Dril Close out Tabs, Rudder Hiorns and Begin

 12-25-2017
10.75
Begin rudder Assembly, Bend Edges, Asy and final D
     

 12-22-2017
10.00
Fiish Rudder Except for Rolling Edges

 12-21-2017
9.75
Rudder Trailing Edge, Rrieit Rudder Stiffners and
       

 12-20-2017
2.50
Drill Ribs Halves, Cleco O/I Rib tips, Skin, Drill
       

 12-19-2017
6.50
Complete all HS Riveting to Skins and rear Spar
Details
     

 12-16-2017
4.00
Separate Elevator Ribs, Match Drill & Edge Prep/De
       

 12-16-2017
7.00
Final Asy and Rivet Spar Asy to Skins
       

 12-15-2017
4.75
Rivet Spar Ribs, Stringers & Asy to Spar and Skins
       

 12-03-2017
3.50
Rivet Nose Ribs to HS Skins
Details

 11-25-2017
7.75
Rivet HS Ribs, Stringers to HS Spar and 4 Nose Rib
Details
     

 11-24-2017
5.50
Dimple HS Skins, Alumi-Prep, Rivit HS Stringer / P
     

 11-20-2017
5.00
Mark, Debur, Partial Dimple HS Skins, Alumi-Prep H
     

 11-19-2017
11.00
Match drill HS Asy/Skins, Debur All, Countersink F
       

 11-18-2017
10.25
Rivit spar aps, assemble HS skeleton, match drill
Details
       

 11-16-2017
0.50
Finish HS 1004 Edges

 11-15-2017
1.25
Debur nose ribs, edge finish, angle

 11-12-2017
9.00
Alumiprep & Prime L Rudder Skin/Stiffners, Bend HS
Details

 11-11-2017
2.00
Rivit Front Spar, Doubler Spar Caps and brackets

 11-11-2017
4.00
Cut 4 new "Left" Stiffiners, Drill New "L" Rudder
Details

 11-06-2017
1.00
Alumi-prep & prime HS front spar, doubler, spar ca

 11-05-2017
1.00
Trim inspar ribs, debur, edge finish

 11-05-2017
8.50
Finish spar, drilling brackets, countersink, debur

 11-04-2017
5.50
Debur front spar, file, smooth edges, match drill

 11-02-2017
1.00
Mfg spar caps and stringer trim & file edges

 11-01-2017
0.00
Manuf L/R front spar brackets

 10-31-2017
1.00
Rivit hinge bkt asy after debur, Atch hinge bkt as

 10-31-2017
2.00
Prime, Rivit HS Spar/Doubler; Brackets and Inboard

 10-30-2017
0.50
Alum-Prep for Prime Rear Horiz Stab and Doubler

 10-28-2017
1.00
Rvt nut plate horn to bottom rib, Rvt. upper/middl

 10-28-2017
4.50
Rear HS Spar & Doubler debur & Match Drill
Details

 10-27-2017
5.75
Rudder horn nut plate, plate to rear spar, FInal A

 10-25-2017
4.00
Rivit stiffeners to skins, Top rib & shear clips
     

 10-24-2017
3.00
Rivit VS Rear Spar / Front Spar Components
Details
     

 10-23-2017
0.50
Rivit Rudder Stops/Bracket and Assemble Spar Asy
     

 10-22-2017
7.25
Roll Rudder Edge, Dimple Skins/Flanges, Edg Prep
     

 10-22-2017
2.25
Alumi-Prep & Prime (3 Coats) Rudder Skins & Skelet
Details
       

 10-21-2017
4.50
Final Drill 2nd Skin, Deburred skins and Edge Prep
Details

 10-20-2017
1.50
Disassemble Rudder, Countersink New Rudder Horn
Details
       

 10-19-2017
2.50
Alumi-Prep and Prime VS Components & Skin
       

 10-18-2017
1.00
Complete VS Edge Finishing / Scotchbright

 10-17-2017
1.50
Rework all VS Component Edges

 10-15-2017
3.50
Drill/Countesink Front Spar Doubler
Details
       

 10-15-2017
5.50
Deburr, Dmpl, CntrsnkSpar, Rib Flanges, Drill Rudd
     

 10-13-2017
1.50
Drill Rudder Trailing Edge, Counter Sink Trailing
Details

 10-13-2017
3.00
Countersink, Dimple Skin, Counter Sink Spar
Details
       

 10-12-2017
1.50
Deburr

 10-11-2017
1.50
Final drill & countersink VS spar doubler to spa
Details

 10-10-2017
1.50
Disassemble, Debur VS
Details

 10-09-2017
1.25
Cleco and Drill 1 skin excluding Trailing Edge
Details

 10-08-2017
5.00
Counterbalance, Top Rib and Skins to Rudder Skelet
Details
       

 10-07-2017
7.00
Rudder Horn, Striker Plate, Shear Clip Spar Asy
Details
       

 10-05-2017
2.00
Cleco and continue to Deburr Stiffners
Details
     

 10-03-2017
2.25
Cut Ribs and Stiffeners
Details
       

 10-01-2017
6.00
Build VS Skeleton & Wrap Skin Steps 1-5
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.