Powered By Kitlog Pro v2.0
Ronalds Web Site
RV-14A
Empennage
Work Logs Found:
23
Category Work Time:
74 Hours
Date
Hours
Work Log Summary
Details
02-02-2019
2.00
Rivet Top Skin
Details
02-02-2019
1.00
Right Side Rivet
01-24-2019
4.00
Side Skins
Details
01-23-2019
1.00
VS stabilizer drilling
Details
01-23-2019
4.00
Rear Deck
Details
01-22-2019
2.00
Static air installation
Details
01-21-2019
4.00
Rivet the aft fuselage sides
Details
01-20-2019
8.00
Sides riveting
Details
01-19-2019
6.00
Skid plate tail cone
Details
01-17-2019
6.00
Tail Cone Sides
Details
01-13-2019
3.00
Bottom Skin and Bulkhead Assembly
Details
01-13-2019
2.00
Bellcrank to Bulkheads
Details
01-13-2019
1.00
Battery Angles
Details
01-13-2019
2.00
1412, 1411 and 1410 Bulkhead
Details
01-11-2019
6.00
Prep parts for primer
01-04-2019
2.00
Dubur and separate parts
01-02-2019
3.00
Separate, debur and prep tail cone parts
Details
01-02-2019
3.00
Separate and debur tail cone parts
01-01-2019
1.50
Vertical Stablilizer Bulk head
Details
01-01-2019
3.00
Prepping tail cone parts
Details
01-01-2019
2.00
Fabrication of rudder stops
Details
10-31-2018
6.00
Inventory
Details
10-30-2018
2.00
Unpacking and Inventory
Details
SITE NAVIGATION
Contact Builder
RV-14A Home
Category
# Logs
# Hours
All
214
719
Ailerons
11
52
Avionics
3
8
Empennage
23
74
Empennage Elev
25
84
Empennage HS
16
50
Empennage Rudder
18
52
Empennage Vert Stab
9
26
Flaps
9
28
Fuel Tanks
29
87
Primer
8
27
Wing Electrical
3
5
Wing Ribs
9
28
Wing Spars
29
87
Wings
22
111
Copyright © 2001-2024 Matronics. All Rights Reserved.