Powered By Kitlog Pro v2.0
RICHARD'S WEB SITE
CH 650B
Fuselage
Work Logs Found:
64
Category Work Time:
339 Hours
Date
Hours
Work Log Summary
Details
12-08-2019
4.75
Center counsole
Details
11-30-2019
2.00
Rudder Fairing
Details
11-24-2019
3.25
Corvair Engine Mount
Details
10-15-2019
7.50
Rudder cables
Details
09-20-2019
4.50
Rudder Cable
Details
09-15-2019
2.00
Vertical stabilizer
Details
09-02-2019
12.75
Elevator cables
Details
08-26-2019
6.50
Horizontal Stabilizer
Details
08-24-2019
5.50
Horizontal Stabilizer mount
Details
08-19-2019
9.50
Top, rear skin
Details
08-13-2019
2.00
Cable fairleads
Details
08-09-2019
7.00
Flap drive
Details
08-08-2019
8.25
Rivet seat
Details
08-04-2019
6.75
Control Yoke and Seat belt mounts
Details
08-04-2019
1.50
Center Console
Details
07-06-2019
9.50
Control yoke mount
Details
07-04-2019
3.50
Torque Tube mount
Details
06-28-2019
5.00
Flap Motor Mount
Details
06-25-2019
1.50
Seat Back
Details
06-23-2019
8.25
Seat Pan
Details
06-21-2019
2.25
Main Landing Gear
Details
06-21-2019
2.00
Landing gear fairings
Details
06-19-2019
1.50
Main Landing gear
Details
06-18-2019
5.75
Left landing gear mount
Details
06-16-2019
8.25
Left landing gear Mount
Details
06-07-2019
3.75
Left landing gear mount
Details
06-06-2019
3.75
Landing gear mount
Details
05-30-2019
10.00
Right side landing gear mount
Details
05-19-2019
2.00
Landing gear
Details
05-14-2019
3.00
Fuselage sides
Details
05-12-2019
3.50
Wheel Spindles
Details
05-01-2019
2.00
Fuselage sides- Gear Mounts
Details
04-29-2019
4.00
Fuselage Sides
Details
02-03-2019
5.00
Bottom Longerons
Details
02-02-2019
2.00
Tires
Details
01-24-2019
4.25
Rivet side skins
Details
12-30-2018
8.25
Center Spar
Details
12-19-2018
14.00
Baggage Floor and supports
Details
12-16-2018
8.25
Center Skin Brace
Details
12-11-2018
2.25
Front forward skin - LH side
Details
12-10-2018
5.00
Fuselage forward skin - RH side
Details
12-09-2018
5.75
Wing rear channel bracket and Baggage support
Details
12-04-2018
3.00
Verified straightness
Details
12-03-2018
5.00
Engine mount steel supports
Details
12-02-2018
4.00
Forward top longerons
Details
12-01-2018
8.25
Fuselage - Firewall
Details
11-26-2018
6.50
Fuselage off the bench
Details
11-23-2018
8.25
Fuselage front floor
Details
11-18-2018
9.00
Rudder pedals
Details
11-17-2018
8.50
Fuselage front floor
Details
11-10-2018
4.25
Fuselage front floor
Details
11-04-2018
6.75
Forward Fuselage
Details
10-27-2018
6.00
Firewall Assembly
Details
10-26-2018
6.50
Tailwheel
Details
10-25-2018
4.50
Fuselage sides
Details
10-22-2018
2.50
Tailwheel bracket
Details
10-21-2018
1.75
Fuselage sides
Details
10-20-2018
1.75
Fuselage sides
Details
09-08-2018
3.75
Lower Rudder Hinge
Details
09-06-2018
2.75
Fuselage Bottom Hatch
Details
09-04-2018
5.75
Bottom skin riveting
Details
09-02-2018
4.75
Fuselage bottom skin bracing
Details
08-26-2018
3.50
Bulkheads and nylon parts
Details
08-22-2018
14.00
Fuselage Kit parts
Details
SITE NAVIGATION
Contact Builder
CH 650B Home
Category
# Logs
# Hours
All
149
674
Electrical System
1
4
Empennage
9
45
Engine
17
53
Fuselage
64
339
Miscellaneous
2
10
Shop Supplies
2
5
Tools
2
10
Wings
52
208
Copyright © 2001-2024 Matronics. All Rights Reserved.