Work Logs Found: 59
Category Work Time: 192 Hours
 Date
Hours
Work Log Summary

Details

 12-13-2018
3.00
purchase order gascolator and misc fuel parts

 12-13-2018
4.00
Flap motor 2.0 rapid prototype mount & adapter

 12-12-2018
1.00
Wingtip clear lense clay mockup

 12-12-2018
2.00
Flap motor 2.0 wiring mockup

 12-10-2018
3.00
Wingtip lights prep for mold

 12-10-2018
4.00
6BID Mold layup - Wingtip lights

 12-05-2018
4.00
Shopping AN Fittings for fuel system

 12-03-2018
2.00
Pull tubing and bulkhead for adjustable cables

 11-30-2018
1.00
Shop flap motor 2.0

 11-29-2018
1.50
Pulling baggage door kit parts

 11-29-2018
2.00
Flap motor CFD testing

 11-28-2018
1.00
Shop LED strip lights for wingtips

 11-25-2018
1.00
Baggage door layup schedule

 11-25-2018
1.00
Adjustable pedal schematic

 11-15-2018
3.00
Esco strut cam finish machining

 11-14-2018
8.00
4 axis CNC program, setup, and machining Esco stru

 11-13-2018
2.00
Light bar CAD drawings

 11-13-2018
4.00
Flap Clevis drill and rivet, water jet control arm

 11-13-2018
6.00
Flap anchor design and machining

 11-12-2018
6.00
Flap clevis CAD design and machining

 11-11-2018
2.00
Flap servo connection hardware design

 11-09-2018
1.00
shop Led tape lights and rotary pot flap controls

 11-05-2018
4.00
Left horizontal root fairing clay mold and 4 BID

 11-02-2018
4.00
Right horizontal root fairing clay mold and 4BID

 10-31-2018
4.00
Rightwingtip part layup 4BID

 10-30-2018
5.00
CAM, CNC cut right wingtip pattern

 10-29-2018
3.00
Shop fuel systems, seat cushions, piston set order

 10-27-2018
0.50
Wingtip demold and deburr

 10-26-2018
4.00
Wingtip 4 BID layup

 10-23-2018
0.50
Shop Panel switches and switch covers

 10-22-2018
0.50
Shop Flap servo and controller

 10-22-2018
1.00
Concept panel and center console

 10-22-2018
1.00
Concept avionics layout, ebrakes, digital switch p

 10-20-2018
1.00
3D modeling centerconsole
Details

 10-18-2018
6.50
CNC cut new wingtip design

 10-17-2018
2.00
Sanding and micro wingtip molds

 10-17-2018
4.00
New wingtip design CAD and CAM

 10-16-2018
5.00
CNC machine wingtip bottom and bottom tip

 10-15-2018
6.00
CNC program and machine wingtip bottom

 10-13-2018
4.00
CNC 3d surface wingtip top

 10-12-2018
8.00
CNC Machine programming

 10-11-2018
4.00
Cnc machine cleaning and setup

 10-10-2018
8.00
Wingtip mold design and NC programming
       

 10-09-2018
3.00
Wingtip mold design and prep

 09-27-2018
4.00
nose tunnel flox and 3 BID

 09-27-2018
6.00
CFD testing winglet

 09-27-2018
1.00
3D scan baggage window legacy

 09-26-2018
2.00
Post-cure nose tunnel

 09-25-2018
4.00
Wingtip design solidworks

 09-25-2018
4.50
Nose tunnel 6 BID (second attempt)

 09-21-2018
3.00
Wingtips Soliworks

 09-20-2018
6.00
Nose tunnel extend 6 BID

 09-17-2018
4.00
Electric retract system design

 09-13-2018
3.00
Separation of unneeded items, cleaning

 09-13-2018
6.00
CNC machining spinner backplate

 09-12-2018
3.00
Hydraulic piston sourcing

 09-11-2018
2.00
Hydraulic pump mount 6 Bid and vacuum

 09-11-2018
1.00
hydralic fittings and pump

 09-11-2018
1.00
Fuel and hydralic parts search