KitLog pro

Powered By Kitlog Pro v2.0

BOB'S WEB SITE
Work Logs Found: 97
Category Work Time: 183 Hours
 Date
Hours
Work Log Summary

Details

 08-10-2021
3.00
Did stuff I've done before
Details
       

 10-23-2020
2.00
Riveted oil door to top cowling
Details
       

 10-15-2020
2.00
Finished inlets and added heat shield
Details
       

 10-13-2020
2.00
Sanded inlets
Details
       

 10-12-2020
3.00
Bonded filtered air box and NACA vent to bottom co
Details
       

 10-11-2020
2.00
Prepped filtered air box
Details
       

 09-13-2020
1.50
Bonded NACA vent to top cowling
Details
       

 09-12-2020
1.50
Smoothing out the cowling vents
Details
     

 09-07-2020
0.50
Epoxied cooling vents to top cowling
Details
       

 09-06-2020
1.50
Cut cooling fins
Details
       

 09-02-2020
3.00
Cowling close out
Details

 09-01-2020
3.50
Completed riveting cowling hinges
Details
       

 08-31-2020
1.50
Started riveting hinges
Details
       

 08-30-2020
2.00
Fiberglassing work on cowling
Details
       

 08-29-2020
3.00
Drilled cowling side hinges
Details
       

 08-28-2020
2.00
Preparing to drill side hinges to top cowling
Details
     

 08-25-2020
2.00
Drilled side hinges to bottom cowling
Details
       

 08-23-2020
1.00
Drilled aft hinges in bottom cowling
Details
       

 08-22-2020
2.00
More cowling trimming and fitting
Details
       

 08-13-2020
5.00
Finished aft trimming of bottom cowling
Details
       

 08-03-2020
3.00
Drilled top cowling; started fitting bottom cowl
Details
       

 08-02-2020
3.00
Trimming the top cowl
Details
       

 08-01-2020
1.50
Spacers for spinner back plate
Details

 07-31-2020
4.00
Fit the top cowling
Details
       

 07-30-2020
1.00
Finished cowling cutouts
Details
     

 07-28-2020
6.00
Cowling trimming
Details
       

 06-30-2020
2.00
Completed Section 27
Details
       

 06-24-2020
2.00
Making fuel filter lines
Details
       

 06-23-2020
2.00
Began fuel filter assembly
Details
       

 06-22-2020
1.00
Assembled fuel filter assembly
Details
     

 06-20-2020
2.00
Began assembling fuel filter
Details
       

 05-24-2020
2.00
Prepped canopy frame and rollbar for painting
Details
       

 02-08-2020
1.00
Set breakout force on nosewheel
Details
     

 02-06-2020
1.50
Replaced nose gear leg
Details
       

 02-01-2020
2.00
Reinstalled flaperon controls
Details
       

 11-15-2019
1.40
Drilled remaining holes on flaperon control
Details
     

 11-09-2019
2.00
Drilled flaperon controls
Details
       

 11-06-2019
0.00
More on attaching wings
Details
       

 11-06-2019
3.00
Attached wings
Details
       

 10-20-2019
1.00
Prepped flaperon brackets
Details

 10-18-2019
2.00
Attached flaperons to wing
Details

 09-12-2019
2.00
Began prep of canopy
Details
       

 09-08-2019
2.00
Riveted side arms on canopy frame
Details
     

 09-07-2019
3.00
Fluted canopy frame brackets
Details
       

 08-31-2019
1.00
Mounted canopy frame
Details
     

 08-28-2019
2.00
Gas struts to canopy frame
Details
       

 08-21-2019
1.00
Started on canopy
Details
       

 08-18-2019
1.00
Final touches on fairing
Details
     

 08-14-2019
2.00
Finished (somewhat) nose gear fairing
Details
       

 08-13-2019
2.00
Drilled hinge to gear leg fairing
Details
     

 08-11-2019
2.00
Drilled gear leg fairing
Details
       

 08-02-2019
1.00
Started on gear leg fairing
Details
       

 07-31-2019
2.00
Finished nose wheel fairing
Details
       

 07-30-2019
1.00
Riveted nosewheel fairing brackets
Details
       

 07-28-2019
1.00
Riveted side brackets to nosewheel fairing
Details
       

 07-24-2019
4.00
Nosewheel fairing
Details
       

 07-03-2019
2.00
Finished right wheelpant
Details
       

 07-01-2019
2.00
Mounted right wheelpant
Details
       

 06-30-2019
1.00
Fit right wheelpant
Details
       

 06-21-2019
2.00
Started right wheelpant
Details
     

 06-20-2019
2.00
Completed left wheelpant
Details
       

 06-19-2019
2.00
Added epoxy to left wheelpant
Details
     

 06-15-2019
2.00
Fixed left wheelplant problem
Details
       

 06-09-2019
2.00
Identified left wheelpant problem
Details
       

 06-06-2019
2.00
Installed left wheelpant bracket
Details

 05-23-2019
1.00
Left axle work for wheelpant
Details
     

 05-22-2019
1.00
Landing gear cutout
Details
     

 05-19-2019
2.00
Sand forward half for mount fit
Details
     

 05-07-2019
1.00
Adjust left wheelpant cutout
Details
     

 04-23-2019
1.00
Trim wheelpant cutout
Details
       

 04-22-2019
1.50
Started on wheelpants
Details
       

 04-19-2019
1.00
Brake fluid added
Details
     

 04-16-2019
0.50
Nose gear fork to nose leg
Details
     

 04-03-2019
2.00
Bolted nose gear fork
Details
       

 03-24-2019
2.00
Brake lines
Details
       

 01-13-2019
2.00
Main gear installed
Details
       

 01-05-2019
2.00
Left side axle
Details
       

 01-02-2019
1.00
Finished left side gear leg
Details
       

 12-29-2018
4.00
Landing gear
Details
       

 12-16-2018
4.00
Finished main wheel assembly
Details

 12-11-2018
1.00
Main wheel and tire installation
Details
       

 12-01-2018
1.50
Tired
Details
       

 11-24-2018
1.50
Attached engine mount
Details
       

 11-23-2018
1.00
Flap motor
Details
       

 11-22-2018
2.00
Attached flap assembly control tubes
Details
       

 11-18-2018
0.50
Riveted control arms and primed tube
Details
       

 11-17-2018
1.00
Drilled rod end bearing males to control tubes
Details

 11-12-2018
1.00
Bolted control rods to flap control mechanism
Details
       

 11-10-2018
3.00
Tapped control rods
Details
       

 11-04-2018
3.00
Begin yoke installation
Details
       

 11-03-2018
2.00
Crontrol yoke bracket housing
Details
       

 10-30-2018
0.50
Started working on flap mechanism
Details
     

 10-28-2018
1.00
Installed pulleys
Details
       

 10-27-2018
1.50
Cable routing
Details
       

 10-20-2018
1.00
Added clamps to rudder cables
Details
       

 10-13-2018
1.50
Installed control column
Details
       

 10-05-2018
2.50
Prepped control rod and made support brackets
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.