Powered By Kitlog Pro v2.0
Norris's RV Construction
RV10
10 Firewall Forward
Work Logs Found:
82
Category Work Time:
446 Hours
Date
Hours
Work Log Summary
Details
05-17-2022
2.50
Continue Engine tuning
05-04-2022
4.00
Installing spark plug wires
05-03-2022
3.00
Start running spark plug wires
03-14-2022
2.00
Finished installing all the quarter turn fastners
03-04-2022
1.50
Start Prep the top cowl for repainting
03-03-2022
6.00
Installl and adjust cowl
03-02-2022
7.00
Fitting out the engine cowl with quarter turns fas
02-21-2022
3.00
Install the second heat muff and tubes
02-08-2022
9.50
Filling, sanding, priming cowl. Initial set of fu
01-30-2022
1.50
Engine Alt Air switches
01-28-2022
9.00
Wireinfg Engine alt air and thebaggage lights
01-27-2022
2.50
Installedl the linear actuator and fiberglassed br
01-26-2022
3.00
Working on Engine Alt Air Door
01-25-2022
6.00
Built and fiberglassed in the alt engine air door.
01-24-2022
7.00
Designing an alternate air door
01-19-2022
6.00
Almost finished the baffling around the prop gov
01-18-2022
6.00
Installed ooil door latch and baffeling.
Details
01-17-2022
4.50
Made the oil door
01-17-2022
4.50
Completed the prop control connection to the gov
01-14-2022
2.00
Working on redoing the front end of the prop contr
01-14-2022
5.00
Reinstalled throttle and prop controles
01-13-2022
4.00
Filling and sanding cowling and air intakes
01-12-2022
7.00
Still working on the air intakes
01-11-2022
4.00
Continuing adjusting and fiberglassing air intakes
01-10-2022
3.00
worked on cowl air intak fiberglassing
01-04-2022
8.00
Got the air ducts lined up enough to glue
01-03-2022
7.50
Still working on the air inlets
12-31-2021
6.50
Continue wowrking on left air intake and baffling
12-30-2021
1.50
Working on L air intake
12-24-2021
8.00
Rightg air intake configured. Starting on the left
12-23-2021
8.00
Almost got the baffling around the right air inlet
12-22-2021
5.00
fiberglass top cowl pieces. Rivet baffling.
12-21-2021
5.00
Baffles and replaced the crossover fuel line
12-20-2021
7.50
Continue working on baffeling in the front opening
12-17-2021
6.50
Worked on fitting the air intake tubes
12-16-2021
5.50
Messing with baffeling and fitting the air scoops
12-15-2021
5.00
Installing rubber baffle material
12-13-2021
3.00
air induction
12-09-2021
7.00
Finished nose gear fairing. Startedcowl front fas
12-08-2021
9.00
cowl
Details
12-07-2021
7.00
All day fitting the nose strut surround
12-06-2021
9.00
Finished cowling and started on nose gear cowl par
12-03-2021
6.00
More work on the 1/4 turn fastners on the sides
12-03-2021
7.00
more cowl work
12-02-2021
6.50
Installing quarter turn fasteners on the cowl side
12-01-2021
7.50
Fitting the bottom cowl
11-30-2021
8.00
Fit the lower cowl and installed the quarter turn
11-29-2021
7.50
Wprked on fitting the upper cowl
11-22-2021
3.00
Got the prop. Unboxed it and installed
11-09-2021
2.00
Install and connect the Oil Temp Probe.
11-08-2021
9.00
Installed CHT and EGT probes and wireing
11-05-2021
3.00
Installed left exhaust. Installed insullated clam
11-02-2021
8.00
Details
11-01-2021
3.00
Finishing left fron baffles
10-27-2021
2.00
Finished attaching prop control bracket and cable
10-26-2021
8.00
Details
10-20-2021
8.00
Completed designing the master air control
10-19-2021
5.00
Designing holders, brackets,etc for 3nd heater box
10-14-2021
8.00
Details
10-13-2021
7.00
Insulated wires.Installed exhaust support.heating.
10-12-2021
4.00
Working on the R front baffle to make it fit bette
10-11-2021
3.00
Installed spark plug leads thru the baffling
09-10-2021
7.50
Insulating wires near engine. Installed engine tmp
09-09-2021
6.00
Got all but the left front baffling installed
09-08-2021
7.00
CVontinue making baffeling
09-07-2021
7.00
Details
09-03-2021
7.00
Installed MAP sensors and Fuel pressor sensor
09-02-2021
3.00
Worked on how the cowling should fit.
08-31-2021
2.00
Mounted the prop
08-31-2021
4.00
Details
08-30-2021
6.50
Installed oil pressure transducer. Ordered Fuel se
08-27-2021
7.50
Details
08-25-2021
3.50
Details
08-23-2021
7.50
Details
08-20-2021
8.00
Details
08-18-2021
5.50
Mounted BC Alternator. Worked onl EFII mounting
07-16-2021
5.00
Started installing engine but removed it.
Details
04-26-2021
5.00
Finished installing 1/4 turn fastners and side hin
08-12-2019
3.00
Get stainless steel bung welded into the exhaust
07-09-2019
7.00
Install the rear seatback and the Mid cabin decks
10-09-2018
3.50
Finish countersinking and reassemble
10-08-2018
3.00
Further prep on firewall. dimpling and countersink
SITE NAVIGATION
Contact Builder
RV10 Home
Category
# Logs
# Hours
All
649
3556
10 Avionics
51
293
10 DeIce
58
310
10 Empennage
58
239
10 Engine
8
39
10 Finish Kit
6
24
10 Firewall Forward
82
446
10 Fuselage
180
977
10 Inspection
3
8
10 Interior
22
128
10 Miscellaneous
23
116
10 Paint
35
175
10 Rear Fuselage
27
104
10 Wings
95
527
De Ice
1
170
RV14a Home
Copyright © 2001-2024 Matronics. All Rights Reserved.