Norris's RV Construction
Work Logs Found: 82
Category Work Time: 446 Hours
 Date
Hours
Work Log Summary

Details

 05-17-2022
2.50
Continue Engine tuning

 05-04-2022
4.00
Installing spark plug wires

 05-03-2022
3.00
Start running spark plug wires

 03-14-2022
2.00
Finished installing all the quarter turn fastners

 03-04-2022
1.50
Start Prep the top cowl for repainting

 03-03-2022
6.00
Installl and adjust cowl

 03-02-2022
7.00
Fitting out the engine cowl with quarter turns fas

 02-21-2022
3.00
Install the second heat muff and tubes

 02-08-2022
9.50
Filling, sanding, priming cowl. Initial set of fu

 01-30-2022
1.50
Engine Alt Air switches

 01-28-2022
9.00
Wireinfg Engine alt air and thebaggage lights

 01-27-2022
2.50
Installedl the linear actuator and fiberglassed br
     

 01-26-2022
3.00
Working on Engine Alt Air Door

 01-25-2022
6.00
Built and fiberglassed in the alt engine air door.

 01-24-2022
7.00
Designing an alternate air door

 01-19-2022
6.00
Almost finished the baffling around the prop gov
     

 01-18-2022
6.00
Installed ooil door latch and baffeling.
Details

 01-17-2022
4.50
Made the oil door
     

 01-17-2022
4.50
Completed the prop control connection to the gov
     

 01-14-2022
2.00
Working on redoing the front end of the prop contr

 01-14-2022
5.00
Reinstalled throttle and prop controles

 01-13-2022
4.00
Filling and sanding cowling and air intakes

 01-12-2022
7.00
Still working on the air intakes

 01-11-2022
4.00
Continuing adjusting and fiberglassing air intakes

 01-10-2022
3.00
worked on cowl air intak fiberglassing

 01-04-2022
8.00
Got the air ducts lined up enough to glue
       

 01-03-2022
7.50
Still working on the air inlets

 12-31-2021
6.50
Continue wowrking on left air intake and baffling

 12-30-2021
1.50
Working on L air intake

 12-24-2021
8.00
Rightg air intake configured. Starting on the left

 12-23-2021
8.00
Almost got the baffling around the right air inlet

 12-22-2021
5.00
fiberglass top cowl pieces. Rivet baffling.

 12-21-2021
5.00
Baffles and replaced the crossover fuel line

 12-20-2021
7.50
Continue working on baffeling in the front opening

 12-17-2021
6.50
Worked on fitting the air intake tubes

 12-16-2021
5.50
Messing with baffeling and fitting the air scoops

 12-15-2021
5.00
Installing rubber baffle material

 12-13-2021
3.00
air induction

 12-09-2021
7.00
Finished nose gear fairing. Startedcowl front fas

 12-08-2021
9.00
cowl
Details
       

 12-07-2021
7.00
All day fitting the nose strut surround

 12-06-2021
9.00
Finished cowling and started on nose gear cowl par
       

 12-03-2021
6.00
More work on the 1/4 turn fastners on the sides

 12-03-2021
7.00
more cowl work

 12-02-2021
6.50
Installing quarter turn fasteners on the cowl side

 12-01-2021
7.50
Fitting the bottom cowl

 11-30-2021
8.00
Fit the lower cowl and installed the quarter turn

 11-29-2021
7.50
Wprked on fitting the upper cowl
     

 11-22-2021
3.00
Got the prop. Unboxed it and installed
     

 11-09-2021
2.00
Install and connect the Oil Temp Probe.

 11-08-2021
9.00
Installed CHT and EGT probes and wireing
       

 11-05-2021
3.00
Installed left exhaust. Installed insullated clam

 11-02-2021
8.00

Details
     

 11-01-2021
3.00
Finishing left fron baffles

 10-27-2021
2.00
Finished attaching prop control bracket and cable

 10-26-2021
8.00

Details
     

 10-20-2021
8.00
Completed designing the master air control
     

 10-19-2021
5.00
Designing holders, brackets,etc for 3nd heater box

 10-14-2021
8.00

Details

 10-13-2021
7.00
Insulated wires.Installed exhaust support.heating.

 10-12-2021
4.00
Working on the R front baffle to make it fit bette

 10-11-2021
3.00
Installed spark plug leads thru the baffling

 09-10-2021
7.50
Insulating wires near engine. Installed engine tmp

 09-09-2021
6.00
Got all but the left front baffling installed
     

 09-08-2021
7.00
CVontinue making baffeling

 09-07-2021
7.00

Details

 09-03-2021
7.00
Installed MAP sensors and Fuel pressor sensor

 09-02-2021
3.00
Worked on how the cowling should fit.

 08-31-2021
2.00
Mounted the prop
     

 08-31-2021
4.00

Details

 08-30-2021
6.50
Installed oil pressure transducer. Ordered Fuel se

 08-27-2021
7.50

Details

 08-25-2021
3.50

Details

 08-23-2021
7.50

Details

 08-20-2021
8.00

Details

 08-18-2021
5.50
Mounted BC Alternator. Worked onl EFII mounting

 07-16-2021
5.00
Started installing engine but removed it.
Details
       

 04-26-2021
5.00
Finished installing 1/4 turn fastners and side hin
     

 08-12-2019
3.00
Get stainless steel bung welded into the exhaust
     

 07-09-2019
7.00
Install the rear seatback and the Mid cabin decks
     

 10-09-2018
3.50
Finish countersinking and reassemble

 10-08-2018
3.00
Further prep on firewall. dimpling and countersink