Powered By Kitlog Pro v2.0
Ron Web Site
RV-8
Elevators
Work Logs Found:
32
Category Work Time:
67 Hours
Date
Hours
Work Log Summary
Details
10-11-2018
8.90
Finishing the Elevators
Details
10-11-2018
0.00
10-11-2018
0.00
10-07-2018
1.50
Finishing the Elevators
Details
10-03-2018
7.40
Riveting the Elevators
Details
10-03-2018
0.00
10-03-2018
0.00
10-02-2018
1.00
Priming
Details
10-01-2018
2.10
Building the Trim Tab
Details
09-28-2018
4.40
Fabricating Riblets
Details
09-28-2018
0.00
Fabricating Riblets
09-09-2018
1.10
Riblet Fabrication
Details
09-01-2018
2.20
Riveting the Left Elevator
Details
09-01-2018
0.00
08-31-2018
5.40
Riveting the Left and Right Elevators
Details
08-31-2018
0.00
08-31-2018
0.00
08-30-2018
6.60
Trimming the Stiffeners, Riveting the Left Elevato
Details
08-30-2018
0.00
08-30-2018
0.00
08-30-2018
0.00
07-26-2018
5.70
Trimming the Elevator Stiffeners
Details
07-23-2018
2.30
Building the Trim Tab
Details
07-22-2018
1.30
Preparing the Right and Left Elevator
Details
07-19-2018
6.00
Preparing the Right and Left Elevator
Details
07-19-2018
0.00
07-19-2018
0.00
07-18-2018
2.30
Trimming the Elevator Stiffeners and Preparing the
Details
07-18-2018
0.00
07-15-2018
7.70
Trimming the Elevator Stiffeners and Preparing the
Details
07-15-2018
0.00
07-14-2018
1.30
Trimming the Elevator Stiffeners
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
429
1380
Avionics
1
8
Electrical
2
38
Elevators
32
67
Empennage
8
20
Fuselage
179
600
Horizontal Stabilize
24
45
Miscellaneous
1
8
Rudder
22
33
Tools
1
2
Vertical Stabilizer
8
13
Wings
151
546
Copyright © 2001-2024 Matronics. All Rights Reserved.