Powered By Kitlog Pro v2.0
Brendons Kit Log
RV-10
Landing Gear
Work Logs Found:
5
Category Work Time:
19 Hours
Date
Hours
Work Log Summary
Details
09-12-2018
2.00
Install brakes
Details
09-08-2018
4.00
Prepare for landing gear install
Details
09-08-2018
3.00
Landing gear install
Details
08-25-2018
2.00
Set nose wheel breakout force
Details
07-02-2018
8.00
Wheel, Brake Install
Details
SITE NAVIGATION
RV-10 Home
Category
# Logs
# Hours
All
488
1672
Aileron
8
34
Doors
16
83
Electrical
16
66
Elevator
24
64
Empennage
15
56
Engine
17
72
Finishing
37
109
Firewall
4
11
Flaps
12
42
Fuel Tanks
17
92
Fuselage
130
461
HS
18
54
Inspection
1
Interior
15
64
Landing Gear
5
19
Miscellaneous
1
Moving
3
8
Panel
5
16
Practice
5
8
Prop
6
12
Rudder
13
34
Tailcone
32
78
Tools
1
VS
11
26
Windows
9
41
Wing - LEFT
28
87
Wing - RIGHT
22
69
Wings
17
66
Copyright © 2001-2024 Matronics. All Rights Reserved.