Powered By Kitlog Pro v2.0
David and Jimmy's RV-10
RV10
Engine
Work Logs Found:
26
Category Work Time:
183 Hours
Date
Hours
Work Log Summary
Details
09-23-2019
6.00
Engine monitoring
09-04-2019
8.00
Vetterman exhaust
09-03-2019
8.00
Fuel system/oil system FWF
09-02-2019
8.00
Fabricated air box
08-28-2019
6.00
Fitting the Fabricated air box
08-27-2019
8.00
Fabricating engine airbox
08-18-2019
11.00
baffling and vertical airbox
08-16-2019
7.00
baffling
08-15-2019
8.00
baffling
07-14-2019
8.00
Baffling
07-06-2019
5.00
baffling
07-05-2019
8.00
Baffling
07-04-2019
6.00
front baffles
06-29-2019
5.00
Engine Baffling
12-15-2018
1.00
Prop
11-13-2018
7.00
Sanding and Wheel pants
10-09-2018
8.00
Engine and Fiberglass
10-08-2018
8.00
Engine and windscreen
10-06-2018
8.00
Backup alternator and windscreen
10-05-2018
6.00
B&C oil filter adapter, windscreen
09-28-2018
6.00
More baffling
09-27-2018
8.00
Baffling
09-26-2018
9.00
Baffling
09-14-2018
8.00
Accessories and plumbing
09-13-2018
8.00
Mounting the engine and stuff
09-07-2018
4.00
Oill cooler mount
SITE NAVIGATION
RV10 Home
Category
# Logs
# Hours
All
414
2661
Avionics
28
218
Empennage
64
381
Engine
26
183
Fuselage
162
1051
Miscellaneous
16
133
None
6
50
Wings
112
645
Copyright © 2001-2024 Matronics. All Rights Reserved.