CH 750 Cruzer
Empennage
Work Logs Found:
7
Category Work Time:
26 Hours
Date
Hours
Work Log Summary
Details
03-04-2019
1.50
Installed spacer on stab
Details
02-15-2019
4.00
Finished the patch
Details
02-06-2019
5.00
Riveted Stab Doubler, Ran engine
Details
02-03-2019
3.50
Drilled out stab rivets
Details
01-30-2019
4.00
Started hinge and stabilizer patch
Details
08-22-2018
5.50
Tail feathers, started engine
Details
06-19-2015
2.00
Zenith Factory
SITE NAVIGATION
Contact Builder
CH 750 Cruzer Home
Category
# Logs
# Hours
All
323
1149
Aircraft
1
5
Avionics
5
16
Avionics
16
61
Avionics
38
126
Brakes
38
126
Controls
20
72
Cowl
16
61
Doors
11
38
Empennage
7
26
Engine
29
112
Fuel
9
32
Fuselage
50
184
Miscellaneous
3
8
W&B
38
126
Windows
4
14
Wings
11
45
Wiring
27
97