Date
|
Hours
|
Work Log Summary
|
Details
|
09-15-2018
|
0.50
|
Mounted Hinge brackets onto the stabilizer
|
Details
|
|
|
09-15-2018
|
1.00
|
Installed vortex generators, completed tail sectio
|
Details
|
|
|
09-15-2018
|
0.50
|
Installed pushrod for electric trim, tested system
|
Details
|
|
|
09-14-2018
|
1.00
|
Riveted control brackets, riveted access panel, ri
|
Details
|
|
|
09-14-2018
|
2.00
|
Fit elevator to stabilizer, trimmed as needed. Add
|
Details
|
|
|
09-14-2018
|
0.50
|
Drilled/riveted trailing edge of passenger side
|
Details
|
|
|
09-14-2018
|
0.75
|
Drilled/clecoed/riveted trailing edge on pilot sid
|
Details
|
|
|
09-11-2018
|
1.50
|
Trimmed leading edge material, riveted actuator, c
|
Details
|
|
|
09-11-2018
|
1.00
|
Streched top skin in place, trimmed trailing edge
|
Details
|
|
|
09-11-2018
|
1.00
|
Skin removed for trimming, skin trimmed
|
Details
|
|
|
09-11-2018
|
2.00
|
Made cutouts for electric trim actuator, reassembl
|
Details
|
|
|
09-10-2018
|
1.00
|
Installed tip ribs, and added L-brackets to the el
|
Details
|
|
|
09-10-2018
|
1.00
|
Installed rear ribs and nose ribs on elevator spar
|
Details
|
|
|
09-10-2018
|
2.00
|
Begun skin installation, top and bottom
|
Details
|
|
|
09-10-2018
|
1.00
|
Added rear elevator support, finished elevator ske
|
Details
|
|
|
08-29-2018
|
1.50
|
Rivited skin, Cutout hole for elevator cable on le
|
Details
|
|
|
08-29-2018
|
1.00
|
Fabricated hinge bracket and gusset, rivited brack
|
Details
|
|
|
08-28-2018
|
1.00
|
Made cutout for elevator cable, and mounted L-brac
|
Details
|
|
|
08-28-2018
|
2.50
|
Holes for brackets cut out, skins remounted and ri
|
Details
|
|
|
08-28-2018
|
1.50
|
Drilling and Clecoing Bottom stabilizer skin to sk
|
Details
|
|
|
08-28-2018
|
1.00
|
Drilled/Clecoed top skin in place
|
Details
|
|
|
08-27-2018
|
1.00
|
Fabricated/Mounted rear mounting bracket
|
Details
|
|
|
08-27-2018
|
1.00
|
Debured/Painted/Final Assembly of Skeleton
|
Details
|
|
|
08-27-2018
|
2.00
|
Added ribs to front and rear spar
|
Details
|
|
|
08-27-2018
|
2.00
|
Added doublers, joined front and rear spars
|
Details
|
|
|
08-27-2018
|
2.00
|
Added all brackets to front spar of horizontal sta
|
Details
|
|
|
08-20-2018
|
1.00
|
Drilling the doublers onto the front spar of the h
|
Details
|
|
|
08-20-2018
|
1.00
|
Drilled and clecoed rear ribs and front rib to spa
|
Details
|
|
|
07-27-2018
|
2.00
|
Nose skin installation
|
Details
|
|
|
07-27-2018
|
2.50
|
I installed the rudder skin on the rudder skeleton
|
Details
|
|
|
07-24-2018
|
1.25
|
I finished drilling and clecoing all the remaining
|
Details
|
|
|
07-24-2018
|
0.50
|
Beginning Rudder Construction
|
Details
|
|
|
07-24-2018
|
1.00
|
Began mounting ribs to the rudder main spar
|
Details
|
|