KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
Work Logs Found: 9
Category Work Time: 9 Hours
 Date
Hours
Work Log Summary

Details

 06-06-2019
1.00
Final taxi test
Details
       

 10-09-2018
1.00
Installed elevator bungie
Details
     

 10-04-2018
1.00
Static leak check
Details
       

 09-24-2018
1.00
First Taxi
Details
       

 09-21-2018
1.00
Weighed Aircraft
Details
       

 09-03-2018
1.00
Built a aircraft jack
Details
       

 08-23-2018
1.00
Control Surface Assy
Details
       

 08-20-2018
1.00
Installed Wings
Details
       

 08-14-2018
1.00
Moved Airplane to hanger
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.