Powered By Kitlog Pro v2.0
Bruces S-19 Build Log
S-19 Venterra
Assembly
Work Logs Found:
9
Category Work Time:
9 Hours
Date
Hours
Work Log Summary
Details
06-06-2019
1.00
Final taxi test
Details
10-09-2018
1.00
Installed elevator bungie
Details
10-04-2018
1.00
Static leak check
Details
09-24-2018
1.00
First Taxi
Details
09-21-2018
1.00
Weighed Aircraft
Details
09-03-2018
1.00
Built a aircraft jack
Details
08-23-2018
1.00
Control Surface Assy
Details
08-20-2018
1.00
Installed Wings
Details
08-14-2018
1.00
Moved Airplane to hanger
Details
SITE NAVIGATION
Contact Builder
S-19 Venterra Home
Category
# Logs
# Hours
All
460
1984
Aft Fuselage
20
138
Aileron
13
71
Assembly
9
9
Builder
1
Canopy
12
37
Center Fuselage
31
165
Controls
9
15
Cowling
16
16
Demo Flight
2
Distractions
2
Electrical
28
156
Empennage
3
2
Engine
7
8
Fiberglass Tip for V
9
68
Flaps
6
44
Flight Test
5
5
Forward Fuselage
27
139
Fuselage
6
11
FWF
33
57
Horiz Stabilator
29
131
Instruments
42
201
Interiour
6
35
Landing Gear
9
31
Paint
10
10
Project
1
Rudder
11
47
Seats
5
65
Shop
4
Tips
7
0
Tools
3
Trim Tab
1
8
Vertical Stablizer
13
75
Wings
80
440
Copyright © 2001-2024 Matronics. All Rights Reserved.