KitLog pro

Powered By Kitlog Pro v2.0

DARREN'S WEB SITE
Work Logs Found: 30
Category Work Time: 166 Hours
 Date
Hours
Work Log Summary

Details

 05-17-2020
7.00
Wheel pants, wrapping
Details

 05-15-2020
8.00

Details

 05-12-2020
8.00

Details

 05-11-2020
8.00

Details

 05-10-2020
7.00

Details

 05-09-2020
8.00

Details

 05-08-2020
6.00

Details

 04-06-2020
4.00
Priming touch up
Details
     

 03-27-2020
3.00
Alucrom bare metal. flap switch checking, canopy h
Details

 03-21-2020
3.00

Details

 03-15-2020
6.00

Details

 03-14-2020
8.00

Details

 03-04-2020
10.00
fuel stuff, fairings, rudder pedal stress loading
Details

 03-02-2020
4.00
Writing the POH
Details

 02-29-2020
7.00
Getting ready for last inspection..
Details

 02-27-2020
1.50
Fuel calibration
Details

 02-26-2020
8.00
panel finished off, wiring complete, fuel flow che
Details
     

 02-25-2020
4.00
installed port side switch gear
Details
     

 02-19-2020
7.00
wiring, plumbing, prop...
Details
       

 02-18-2020
1.00

Details

 01-29-2020
4.00
Moved the fuselage to the hangar!

 01-13-2020
5.00
More small jobs..
Details

 01-06-2020
4.00

Details

 12-20-2019
3.00
Garage re-organised, getting ready to paint some c
Details

 04-08-2019
4.00
Documenting the wiring scheme
Details

 03-25-2019
6.00
Wiring and headset plug installation
Details

 12-22-2018
8.00
building the garage extension so that the wings ca
Details

 08-05-2018
4.00

Details
       

 08-04-2018
5.00

Details

 08-03-2018
4.00
QB kit arrives!
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.