KitLog pro

Powered By Kitlog Pro v2.0

DARREN'S WEB SITE
Work Logs Found: 47
Category Work Time: 232 Hours
 Date
Hours
Work Log Summary

Details

 03-23-2020
3.00
filling and sanding wing tips
Details

 02-23-2020
5.00
ziptips connected, wiring loom tidied inside
Details
     

 02-22-2020
7.00
Finalised roll servo, installed port Zip tip
Details

 02-21-2020
3.00
wiring roll servo and CAN bus
Details

 02-16-2020
7.00
Wing bolts finished, SB wiring and tips added
Details
       

 02-15-2020
4.00
Flaps/Ailerons connected
Details

 09-23-2018
20.00
wing finishing
Details
       

 09-15-2018
6.00
Finished rivetting, filling and sanding started ag
Details
     

 09-14-2018
2.00
skin rivetting
Details
     

 09-13-2018
2.00
Wiring work...
Details

 09-12-2018
4.00
SB wing prep
Details

 09-12-2018
2.00
Rivetting port outer skin
Details

 09-12-2018
3.00
pitot/AOA tubing arrived! More wiring.
Details
       

 09-11-2018
2.00
SB Wing skin fettling before final priming
Details

 09-10-2018
8.00
Starboard wing skin attached
Details

 09-09-2018
6.00
Painted the lower half of the Starboard wing
Details

 09-08-2018
8.00
Painting, fitted ailerons, and Delrin spacer mod
Details
       

 09-08-2018
1.00
Aileron movenment checked
       

 09-07-2018
3.00
More painting...
Details

 09-06-2018
3.00
Wiring
Details

 09-05-2018
9.00
paintining...
Details

 09-03-2018
4.00
SB wingtip nutplates attached
Details

 09-02-2018
9.00
starboard wing tip attached
Details

 09-01-2018
9.00
wing tip port
Details
       

 08-31-2018
4.00
Aileron alignment and the Delrin spacer
Details
       

 08-30-2018
2.00
Roll bellcrank bushings
Details

 08-28-2018
3.00
Garmin roll servo fitted
Details
     

 08-26-2018
6.00
Port tank re-fitted, Pitot and regulator fitted
Details
       

 08-25-2018
3.00
Torqued wing tank attachment bolts
Details
     

 08-23-2018
3.00
More dimpling, and replaced the inner aileron bear
Details

 08-22-2018
9.00
skin prep
Details

 08-21-2018
4.00
Service ulletin for B Aileron bracket cracks
Details
     

 08-20-2018
8.00
Flaps, conduit and tank testing!
Details
       

 08-19-2018
6.00
Ailerons and flap fitted
Details
       

 08-18-2018
4.00
Stall warner fitted
Details
       

 08-18-2018
2.00
Gretz pitot mast installed
Details
     

 08-18-2018
2.00
Aileron pushrod installed, .
Details
       

 08-17-2018
3.00
Aileron pushrods
Details

 08-16-2018
5.00
flap and aileron braces fixed to spar
Details
       

 08-14-2018
6.00
flap braces and aileron bellcrank fabricated
Details
       

 08-13-2018
8.00
Internal wing spraying
Details
       

 08-11-2018
2.00
Tanks closed!
Details

 08-11-2018
3.00
flop tubes installed
Details
       

 08-10-2018
5.00
flop tubes and fuel senders
Details
       

 08-08-2018
7.00
More tank prep
Details

 08-07-2018
3.00
Tank preparation
Details
     

 08-06-2018
4.00

Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.