Date
|
Hours
|
Work Log Summary
|
Details
|
03-23-2020
|
3.00
|
filling and sanding wing tips
|
Details
|
|
|
02-23-2020
|
5.00
|
ziptips connected, wiring loom tidied inside
|
Details
|
|
|
02-22-2020
|
7.00
|
Finalised roll servo, installed port Zip tip
|
Details
|
|
|
02-21-2020
|
3.00
|
wiring roll servo and CAN bus
|
Details
|
|
|
02-16-2020
|
7.00
|
Wing bolts finished, SB wiring and tips added
|
Details
|
|
|
02-15-2020
|
4.00
|
Flaps/Ailerons connected
|
Details
|
|
|
09-23-2018
|
20.00
|
wing finishing
|
Details
|
|
|
09-15-2018
|
6.00
|
Finished rivetting, filling and sanding started ag
|
Details
|
|
|
09-14-2018
|
2.00
|
skin rivetting
|
Details
|
|
|
09-13-2018
|
2.00
|
Wiring work...
|
Details
|
|
|
09-12-2018
|
4.00
|
SB wing prep
|
Details
|
|
|
09-12-2018
|
2.00
|
Rivetting port outer skin
|
Details
|
|
|
09-12-2018
|
3.00
|
pitot/AOA tubing arrived! More wiring.
|
Details
|
|
|
09-11-2018
|
2.00
|
SB Wing skin fettling before final priming
|
Details
|
|
|
09-10-2018
|
8.00
|
Starboard wing skin attached
|
Details
|
|
|
09-09-2018
|
6.00
|
Painted the lower half of the Starboard wing
|
Details
|
|
|
09-08-2018
|
8.00
|
Painting, fitted ailerons, and Delrin spacer mod
|
Details
|
|
|
09-08-2018
|
1.00
|
Aileron movenment checked
|
|
|
|
09-07-2018
|
3.00
|
More painting...
|
Details
|
|
|
09-06-2018
|
3.00
|
Wiring
|
Details
|
|
|
09-05-2018
|
9.00
|
paintining...
|
Details
|
|
|
09-03-2018
|
4.00
|
SB wingtip nutplates attached
|
Details
|
|
|
09-02-2018
|
9.00
|
starboard wing tip attached
|
Details
|
|
|
09-01-2018
|
9.00
|
wing tip port
|
Details
|
|
|
08-31-2018
|
4.00
|
Aileron alignment and the Delrin spacer
|
Details
|
|
|
08-30-2018
|
2.00
|
Roll bellcrank bushings
|
Details
|
|
|
08-28-2018
|
3.00
|
Garmin roll servo fitted
|
Details
|
|
|
08-26-2018
|
6.00
|
Port tank re-fitted, Pitot and regulator fitted
|
Details
|
|
|
08-25-2018
|
3.00
|
Torqued wing tank attachment bolts
|
Details
|
|
|
08-23-2018
|
3.00
|
More dimpling, and replaced the inner aileron bear
|
Details
|
|
|
08-22-2018
|
9.00
|
skin prep
|
Details
|
|
|
08-21-2018
|
4.00
|
Service ulletin for B Aileron bracket cracks
|
Details
|
|
|
08-20-2018
|
8.00
|
Flaps, conduit and tank testing!
|
Details
|
|
|
08-19-2018
|
6.00
|
Ailerons and flap fitted
|
Details
|
|
|
08-18-2018
|
4.00
|
Stall warner fitted
|
Details
|
|
|
08-18-2018
|
2.00
|
Gretz pitot mast installed
|
Details
|
|
|
08-18-2018
|
2.00
|
Aileron pushrod installed, .
|
Details
|
|
|
08-17-2018
|
3.00
|
Aileron pushrods
|
Details
|
|
|
08-16-2018
|
5.00
|
flap and aileron braces fixed to spar
|
Details
|
|
|
08-14-2018
|
6.00
|
flap braces and aileron bellcrank fabricated
|
Details
|
|
|
08-13-2018
|
8.00
|
Internal wing spraying
|
Details
|
|
|
08-11-2018
|
2.00
|
Tanks closed!
|
Details
|
|
|
08-11-2018
|
3.00
|
flop tubes installed
|
Details
|
|
|
08-10-2018
|
5.00
|
flop tubes and fuel senders
|
Details
|
|
|
08-08-2018
|
7.00
|
More tank prep
|
Details
|
|
|
08-07-2018
|
3.00
|
Tank preparation
|
Details
|
|
|
08-06-2018
|
4.00
|
|
Details
|
|