KitLog pro

Powered By Kitlog Pro v2.0

Karl's RV14 Web Site
Work Logs Found: 33
Category Work Time: 128 Hours
 Date
Hours
Work Log Summary

Details

 10-16-2016
2.50
Heater tubes, sniffle line etc.
Details
       

 10-13-2016
4.00
Messing with heater ducts and throttle linkage.
Details
       

 10-11-2016
2.00
Worked on exhaust heater connections.
Details
       

 10-10-2016
5.00
Installed throttle, mixture and prop controls.
Details
       

 10-06-2016
2.00
Finished oil cooler door and worked on lower cowl
Details
       

 10-04-2016
2.50
Worked on oil door and front cowl openings.
Details
       

 10-03-2016
2.00
Worked on exhast.
Details
       

 10-02-2016
5.00
Worked on exhaust system installation.
Details
       

 09-30-2016
9.50
Hooked up engine instrumentation etc.
Details
       

 09-29-2016
3.00
Glassed nose entrance and lower cowl.
Details
       

 09-28-2016
3.00
Fiberglassed lower cowl nose bowls.
Details
       

 09-25-2016
1.50
Started oil door & drilled bottom cowl screws.
Details
       

 09-14-2016
1.50
Fiberglassed cowl ramps.
Details
       

 09-08-2016
5.00
Rivited cowl hinges on cowl.
Details
       

 08-19-2016
3.50
Worked on cowl side hinges.
Details
       

 08-18-2016
3.50
Cowl work.
Details
       

 08-17-2016
4.50
Worked on upper and lower cowl.
Details
       

 08-16-2016
8.00
Fitted top cowl.
Details
       

 08-15-2016
2.50
Cut cowl lines.
Details
       

 08-10-2016
2.00
Started top cowl.
Details
       

 08-09-2016
6.50
Installed prop & started on cowl.
Details
       

 08-08-2016
1.75
Installed baffle seals.
Details
       

 08-07-2016
1.50
Snorkel again!
Details
       

 08-06-2016
4.00
Worked on snorkel and alternator.
Details
       

 08-05-2016
4.25
Worked on snorkel and baffleing.
Details
       

 08-03-2016
6.50
Engine connections and started installing baffle.
Details
       

 08-02-2016
2.50
Hung engine on airframe!
Details
       

 07-31-2016
5.00
Front baffle work
Details
       

 06-17-2016
2.00
Worked on oil cooler installation.
Details
     

 06-13-2016
5.50
Worked on engine baffles.
Details
     

 06-12-2016
1.00
Worked on baffels.
Details
       

 06-10-2016
6.50
Started firewall and baffles.
Details
       

 03-30-2016
9.00
Put wheels together, installed nose wheel.
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.