Powered By Kitlog Pro v2.0
Dr. Pete's Xenos Build
Sonex XenosB
Firewall Forward
Work Logs Found:
54
Category Work Time:
89 Hours
Date
Hours
Work Log Summary
Details
10-20-2019
1.00
Drill oil seperator support channel
Details
10-19-2019
2.50
Oil seperator mount
Details
10-13-2019
3.00
Mounting plate for oil seperator
Details
09-14-2019
3.50
Coolant plumbing, wiring
Details
09-08-2019
5.00
FWF wiring
Details
09-07-2019
3.50
Remake RDAC mount
Details
08-18-2019
3.00
Mount RDAC
Details
08-18-2019
1.25
Master contactor wiring
Details
08-17-2019
1.25
Mount regulator to firewall
Details
08-17-2019
2.00
Gathered FWFgrounds
Details
08-10-2019
1.00
Regulator mount
Details
08-04-2019
3.00
Small tasks
Details
07-27-2019
1.50
Cabling for battery to master contactor
Details
07-27-2019
0.75
Adjust turbo cooling lines
Details
07-21-2019
2.00
Turbo cooling sensor line
Details
07-20-2019
1.50
Route FWF wiring
Details
07-20-2019
0.75
Complete pump outlet tubing
Details
07-20-2019
1.50
Battery-engine ground
Details
06-26-2019
2.00
Mount filter to firewall
Details
06-22-2019
0.50
Rivet glareshield mount
Details
06-22-2019
2.00
Relocate oil filter
Details
06-20-2019
3.00
Fit top sparkplug wires through baffling
Details
06-15-2019
1.25
Secondary ignition wiring prep
Details
06-08-2019
0.75
Reroute turbo cooling lines
Details
05-12-2019
3.00
Lengthen FWF wiring
Details
05-11-2019
1.50
Make gounding assemblies
Details
05-11-2019
1.00
Identify and label FF wiring
Details
05-06-2019
1.00
Install grounding strip on battery subpanel
Details
04-13-2019
0.75
Install RDAC
Details
04-07-2019
1.50
Layout RDAC mount to subpanel
Details
04-07-2019
2.00
Add nutplates to RDAC mount.
Details
04-06-2019
2.00
RDAC panel layout
Details
03-30-2019
3.00
Cooling pump mount to firewall
Details
03-23-2019
1.50
Make cooling pump mount plate
Details
03-16-2019
2.50
Locate & attach turbo cooling pump
Details
03-10-2019
1.00
Modify filter/tank panel
Details
03-09-2019
1.50
Trim bottom cowling openings
Details
02-23-2019
1.00
Pump location planning
Details
02-09-2019
1.50
Route and secure secondary plug wires
Details
02-09-2019
1.00
Preliminary turbo radiator placement
Details
02-02-2019
0.50
Install new engine subpanel
Details
01-26-2019
0.75
Finish contactor/fuse subpanel
Details
01-26-2019
0.40
Complete coolant/oil subpanel
Details
01-24-2019
0.30
Remake Coolant/Filter panel
Details
01-24-2019
0.75
Nutplates to master contactor sub-panel
Details
01-12-2019
1.50
Remake Master Contactor Panel
Details
01-05-2019
1.00
Remake port-side accessory mount
Details
12-14-2018
1.50
Make up battery/master contactor cables
Details
09-16-2018
1.50
Install oil filter base
Details
08-17-2018
1.25
Bracket for power relays
Details
08-11-2018
2.00
Backing Plates for Secondary Ignition Coils
Details
07-29-2018
1.00
Engine Baffle
Details
07-18-2018
2.50
Prepare Battery Box for Installation
Details
07-18-2018
1.00
Install Battery Box
Details
SITE NAVIGATION
Contact Builder
Sonex XenosB Home
Category
# Logs
# Hours
All
610
1277
Avionics
17
43
Cockpit
25
43
Communications
6
8
Controls
52
86
Cowling
27
34
Empennage
96
198
Engine
75
149
Finish
6
9
Firewall Forward
54
89
Fuel System
12
12
Fuselage
13
10
Hangar
60
261
Instrument Panel
49
76
Landing Gear
42
48
Legal-FAA
5
6
Miscellaneous
4
20
Prop
5
2
Research
15
62
Shop Supplies
2
4
Tools
13
63
Wings
32
54
Copyright © 2001-2024 Matronics. All Rights Reserved.