KitLog pro

Powered By Kitlog Pro v2.0

Lancair Legacy FG-6
Work Logs Found: 9
Category Work Time: 20 Hours
 Date
Hours
Work Log Summary

Details

 02-26-2006
0.50
Engine control bracket (finished)
Details
       

 02-23-2006
2.00
Powder coat and engrave the engine controls bracke
Details

 02-15-2006
3.00
Prep for Install
Details
     

 02-07-2006
4.00
Center Console (part 2)
Details
       

 02-04-2006
6.00
Throttle, Prop, Mixture mounting
Details
       

 01-25-2006
0.75
More Center console work (part n)
Details
       

 01-24-2006
1.50
Fit and level center console
Details
       

 01-24-2006
1.50
Bottom seat supports fit
Details
       

 01-24-2006
1.00
Bonded in Seatbelt doubler
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.