Powered By Kitlog Pro v2.0
N144GP Lancair Super ES
Lancair Super ES
Speed Brakes
Work Logs Found:
22
Category Work Time:
25 Hours
Date
Hours
Work Log Summary
Details
08-11-2018
2.50
SB install switch, test, finalize
Details
08-06-2018
1.00
SB J1 control cable wiring
Details
08-06-2018
2.00
SB install 3A breaker; run ground wire
Details
08-06-2018
0.75
SB couldn't access ground lug properly; butt splic
08-06-2018
1.00
SB bundle up wires; reinstall some of interior
Details
08-06-2018
0.75
SB drill holes in panel for switch and LED
Details
08-02-2018
2.25
SB; work on wiring
Details
08-02-2018
1.00
SB; did final install of SB units in wing pockets
Details
07-30-2018
0.50
SB; mount ALC unit
07-30-2018
1.00
SB; make CPC connections at both wing pockets
07-30-2018
1.50
SB; J1 CPC connector at ALC
Details
07-30-2018
1.50
SB; CPC connectors under front seat at ALC
Details
07-30-2018
0.00
SB cable routing on R side
Details
07-30-2018
0.00
SB cable routing L side
Details
07-29-2018
2.25
speed brakes - pull L and R wing wires
Details
07-29-2018
0.50
flox pad for ALC unit in- SB
Details
07-21-2018
1.25
move fuel line adel clamps
Details
07-21-2018
1.25
locate and drill drain holes
07-21-2018
1.25
flox in 8-32 screws for ALC mounting pad
Details
07-21-2018
1.25
ALC mounting location
Details
07-16-2018
0.00
speed brake install planning
07-16-2018
1.75
Beg planning/work on speed brakes
Details
SITE NAVIGATION
Contact Builder
Lightning (EAB-LSA) Home
Lancair Super ES Home
Category
# Logs
# Hours
All
1827
4433
Avionics
113
163
Bodywork - misc.
10
25
Electrical
23
36
Elevators
15
60
Empennage
27
28
Engine
33
86
Firewall forward
77
163
Flying - test flying
29
94
Fuselage
633
1070
Garmin 3X Touch pane
139
256
Garmin GMC 507 Autop
18
35
Gear and wheels
102
196
Horizontal Stab
75
148
Interior
7
18
Miscellaneous
128
298
Move
15
60
Paint
1
973
Prop
7
13
Research, prep shop,
1
1
Speed Brakes
22
25
Vert Stab - Rudder
136
166
Wings
163
393
Wiring
53
126
Copyright © 2001-2025 Matronics. All Rights Reserved.