KitLog pro

Powered By Kitlog Pro v2.0

Randy's 750 Cruzer Project
Work Logs Found: 18
Category Work Time: 53 Hours
 Date
Hours
Work Log Summary

Details

 09-18-2023
5.00
Installed fuel header tank and fuel lines
Details
       

 04-13-2019
1.50
Installed fuel tank & connected fuel lines
Details
       

 03-30-2019
4.50
Fitting of fuel tank into wing
Details
     

 03-24-2019
1.50
Fuel tank leak test
Details
     

 03-02-2019
7.00
Installed fuel sender & prepared for leak test
Details
       

 09-08-2018
1.00
Installed fuel sender wiring
Details
       

 09-03-2018
5.00
Installed top wing skin over fuel tank
Details
       

 08-18-2018
3.00
Installed Return fuel fittings and line
Details
       

 08-18-2018
3.00
Installed Feed fuel fittings and line
Details
       

 07-14-2018
1.50
Did some fitting of tank into wing

 07-08-2018
1.00
Drained fuel test
Details

 07-07-2018
3.00
Fuel tank leak test
Details
     

 07-04-2018
4.50
Installed fuel sender
Details
       

 07-01-2018
1.00
Cut and bent fuel sender float arm
Details
       

 06-30-2018
1.00
Prep'd fuel sender mounting ring
Details
     

 06-24-2018
5.00
Drilled hole in tank for fuel sender
     

 06-23-2018
3.00
Drilled hole in wing rib for fuel/vent return line
Details
     

 06-16-2018
1.50
Fuel system planning & tank fit testing










Copyright © 2001-2024 Matronics. All Rights Reserved.