KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
Work Logs Found: 46
Category Work Time: 116 Hours
 Date
Hours
Work Log Summary

Details

 07-21-2019
1.50
Trim & Sand Right Fuselage Side
Details
       

 06-28-2019
7.00
Glassing the left fuselage side
Details
       

 06-15-2019
1.00
Preparing Left Fuselage Side
Details
       

 06-14-2019
2.00
Trimmed and Sanded Right Fuselage Side
Details
       

 05-17-2019
9.00
Glass the right fuselage side
Details
       

 04-28-2019
1.50
The Cozy Rotisserie
Details
       

 04-27-2019
1.00
Round the top right side of fuselage
Details
       

 04-06-2019
2.00
Rounded Top Left Fuselage Side
Details
       

 03-30-2019
1.50
Carve out Fuel Sight Gauge Locations
Details
       

 03-24-2019
2.50
Fabricate Fuselage Curvature Templates
Details
       

 03-23-2019
2.00
Canard Cutout
Details
       

 03-11-2019
0.50
Trim NACA Scoop & Sand
Details
       

 03-10-2019
1.00
Removed peel ply and started sanding bottom
Details
       

 02-23-2019
10.00
Glass Fuselage Bottom
Details
       

 02-17-2019
2.00
Leveled Fuselage & Cut Cloth
Details
       

 02-10-2019
2.00
Prepare Fuselage Bottom for Glassing
Details
       

 01-19-2019
3.00
Install the glide slope antenna
Details
       

 01-12-2019
3.00
Step Insert
Details
       

 01-06-2019
2.00
Fuselage to Nose Interface
Details
       

 01-01-2019
1.50
Temporarily Install the Landing Brake
Details
       

 12-31-2018
2.00
Sand a depression around the landing brake
Details
       

 12-29-2018
3.00
NACA Scoop & Fuselage Bottom
Details
       

 12-28-2018
2.00
Shaping bottom left exterior of the fuselage
Details
       

 12-26-2018
2.00
Shaping the bottom of the fuselage
Details
       

 12-24-2018
2.00
Sanding the bottom left side of the fuselage
Details
       

 12-08-2018
2.50
Begin to contour the fuselage bottom corners
Details
       

 12-01-2018
3.50
Taper the aft sides
Details
       

 11-17-2018
2.00
Trim and Sand NACA Scoop
Details
       

 11-10-2018
2.00
Glass NACA scoop
Details
       

 11-04-2018
2.50
Glass inside of scoop (aft section)
Details
       

 11-03-2018
1.50
Install Aluminum Inserts
Details
       

 10-28-2018
1.50
Rout foam for aluminum inserts
Details
       

 10-14-2018
1.50
Shaping the fuselage bottom aft
Details
       

 10-07-2018
1.00
Joggle for front landing gear bulkhead cover
Details
       

 10-06-2018
1.00
Sanding the NACA Scoop
Details
       

 09-10-2018
1.50
Adding material to fuselage bottom
Details
       

 08-07-2018
4.50
Began shaping the NACA scoop foam
Details
       

 08-04-2018
2.00
Flox PVC foam between bulkheads
Details
       

 07-29-2018
3.50
Installed 2" blocks & fabricated alum inserts
Details
       

 07-22-2018
1.50
Cut 2" thick blocks to size
Details
       

 07-14-2018
2.50
Install more foam and wood to form the NACA scoop
Details
       

 07-07-2018
2.00
NACA Scoop Part D
Details
       

 07-02-2018
4.50
Expoxy scoop foam and birch plywood in place
Details
       

 06-26-2018
2.00
Make birch reinforcements for rear bulkheads
Details
       

 06-24-2018
2.00
Shape foam for NACA Scoop
Details
       

 06-17-2018
3.50
Started Chapter 7 Fuselage Exterior
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.