KitLog pro

Powered By Kitlog Pro v2.0

DARREN'S WEB SITE
Work Logs Found: 29
Category Work Time: 104 Hours
 Date
Hours
Work Log Summary

Details

 08-03-2019
8.00

Details
       

 08-02-2019
5.00
more sanding
Details

 07-31-2019
6.00
undercarriage fairings
Details

 07-30-2019
4.00
more wheel pant fairing prep
Details

 07-29-2019
5.00
Fairings wheel pants
Details

 07-26-2019
4.00
Wheel pants sanding, sikaflex sealer to canopy fra
Details
       

 07-24-2019
3.00
wheel pant fairings
Details

 07-23-2019
2.00
sanding the wheel pant fairings...

 07-20-2019
7.00
Oil door and wheel fairings
Details

 10-05-2018
3.00
Undercarriage bolts finished
Details
     

 10-04-2018
3.00
Constructed the centre undercarriage cover plate
Details
     

 10-03-2018
4.00
Bolting the outer undercarriage weldments and rive
Details

 10-02-2018
2.00
Undercarriage bolts issues
Details

 10-01-2018
3.00
Channel preparation
Details
       

 09-30-2018
8.00
drilling undercarriage
Details

 09-27-2018
3.00

Details
     

 07-22-2018
1.00
Tweaked the brake lines
Details
       

 07-21-2018
1.00
Brake line fabrication
Details
       

 07-20-2018
1.00
Fairings first fix
Details
     

 06-12-2018
1.00
Fixed nutplates to wheelpants
Details
     

 06-09-2018
6.00
Inner mud guard fabricated from fibreglass
Details
       

 06-08-2018
2.00
connecting lip between pant ends filled
Details

 06-06-2018
4.00
Contouring fron of wheel pants
Details

 06-05-2018
2.00
Tinnerman washers and anchor nuts to the left whee
Details

 06-04-2018
4.00
Tinnerman washers and anchor nuts tor secure SB wh
Details

 06-03-2018
4.00
sanding joint between wheel pant halves
Details
     

 06-02-2018
3.00
Joining front and rear of wheel pants
Details
     

 05-31-2018
1.50
sanding wheel pants
Details

 05-30-2018
3.00
Wheel pants prep
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.