Powered By Kitlog Pro v2.0
"THE OTHER WOMAN"
RV7A
Elevator
Work Logs Found:
42
Category Work Time:
67 Hours
Date
Hours
Work Log Summary
Details
07-09-2005
1.00
Installed forward elevator pushrod
Details
07-09-2005
2.50
Elevator install and rigging
Details
07-09-2005
0.20
Elevator fitting
Details
07-08-2005
0.20
Elevator mounting
Details
10-14-2004
2.50
Finishing Elevator
Details
10-13-2004
3.00
Finishing the Elevators
Details
10-13-2004
1.00
Finishing Elevators
Details
10-12-2004
3.00
Rolled Lt elevator leading edges
Details
10-10-2004
2.00
Hinge from top
10-09-2004
3.00
2 Elevator Trim tab
Details
10-07-2004
2.00
Lt Elevator Match Drilled
10-04-2004
2.00
Left Elevator Stiffners
Details
09-20-2004
2.00
Fitted hinge
09-20-2004
2.00
Built Trim tab
Details
09-19-2004
0.10
Trim servo install
Details
09-19-2004
0.50
Trim Servo install
Details
09-19-2004
0.40
Trim servo install
09-19-2004
1.00
More Elevator assembly
Details
09-19-2004
1.00
Lt Elevator Assembly
Details
09-19-2004
1.00
Installed Skeleton into Skin
Details
09-19-2004
1.00
Elevator Riveting
Details
09-19-2004
1.00
Continue riveting elevator Skeleton
Details
09-19-2004
1.00
Details
09-19-2004
1.00
Details
09-18-2004
2.00
Trim tab building
Details
09-18-2004
6.00
Cleaned and Primed Elevator parts
09-17-2004
2.00
Rivet
09-16-2004
3.00
Bent Elevator Trim Tabs
Details
09-15-2004
2.00
Deburred Lt elevator parts
Details
09-14-2004
3.00
Deburred/Dimpled RT Elevator parts
09-13-2004
0.10
More pictures of Bend
09-13-2004
1.00
Installed Horns
09-13-2004
1.90
Bend Elevator skins
Details
09-12-2004
2.00
Rivet LT Elevator
09-12-2004
0.50
Preparing Elevator Assembly
Details
09-12-2004
0.10
More Back Rivet pictures
09-12-2004
0.50
Elevator Assembly
Details
09-12-2004
1.00
Counterbalance drilling
Details
09-11-2004
1.50
Elevator Debur and Dimple
Details
09-11-2004
3.00
Cleaned and Primed Elevator stiffners
Details
09-10-2004
1.00
Elevator skin Dimple
Details
09-10-2004
2.00
Elevator
Details
SITE NAVIGATION
Contact Builder
RV7A Home
Category
# Logs
# Hours
All
824
1335
A/C Hardware & Supplies
5
3
Airshow time
2
Avionics
14
19
Baffles
18
38
Brakes
5
5
Cabin
76
136
Canopy
72
133
Conditional Inspecti
4
8
Cowling
19
47
DAR Inspection
1
4
Electrical
42
96
Elevator
42
67
Empennage
13
21
Engine Run
1
2
Finish Kit
5
6
Firewall Forward
69
97
Flying
2
3
Fuel System
4
9
Fuselage
122
195
Hardware
5
19
Horizontal Stabilizer
46
70
Inspections
4
4
Interior
1
2
Lights
4
6
Miscellaneous
12
8
Oil Cooler
2
3
Panel
40
58
Paperwork
4
4
Prop
4
7
Rudder
43
59
Service Bulletins
1
1
Shipping
2
1
Shop Supplies
11
19
Sub Panel
2
4
Systems
3
6
TC Inspection
3
3
Travels
4
Vertical Stabilizer
21
33
Visit
6
Weight and Balance
1
1
Wheels
13
16
Wings
76
122
Copyright © 2001-2024 Matronics. All Rights Reserved.