KitLog pro

Powered By Kitlog Pro v2.0

DOUGs Web Site
Work Logs Found: 63
Category Work Time: 101 Hours
 Date
Hours
Work Log Summary

Details

 04-04-2019
0.50
5 - fairing install complete
Details
       

 04-04-2019
0.50
4 - Empennage fairing rivnut installation
Details
       

 04-04-2019
0.50
3 - Empennage fairing installation
Details
       

 03-30-2019
1.00
1 - Installed tail cover
Details
       

 03-28-2019
0.50
3 - Misc tail work
Details
       

 02-19-2019
1.00
Installed static source tubing and water reservoir
Details
       

 07-05-2018
2.00
Finished riveting the inner arch skin
Details
       

 07-04-2018
1.00
Riveted top arch skin
Details
       

 07-04-2018
3.50
Arch Ready for Rivets!
Details
       

 07-03-2018
3.00
Top arch fluting and inner arch skin clecod
Details
     

 07-03-2018
0.50
lower arch supports installed
Details
       

 07-03-2018
1.00
Inner arch flanges
Details
       

 06-29-2018
1.00
Vacuumed out rivet removal debris
Details
       

 06-27-2018
6.00
Riveted tail cone top skins
Details
       

 06-26-2018
4.00
Installed & clecod top tail cone skin
Details
       

 06-18-2018
1.00
Reworked and riveted steps
Details
       

 06-17-2018
0.50
Installed wiring for magnetometer
Details
       

 06-15-2018
1.50
Mounted Vertical Stabilizer
Details
       

 05-28-2018
2.00
2 - Riveted rear Fuselage to Central Fuselage
Details
       

 05-26-2018
1.00
1 - Routed GPS antenna coax
Details
       

 05-25-2018
2.00
Routed and secure wire & cable tubing
Details
       

 05-24-2018
1.50
4 - transition piece, joining bracket and rear can
Details
       

 05-24-2018
1.50
3 - After Joining work
Details
       

 05-24-2018
1.50
2 - Closing the gap on the joints
Details
       

 05-24-2018
1.50
1 - Central/Rear fuselage joining
Details
       

 05-23-2018
2.00
3 - Installed and riveted right longeron
Details
       

 05-23-2018
1.00
2 - Bent and fit connector bracket
Details
       

 05-23-2018
2.00
1 - Connector bracket design & fabrication
Details
       

 05-22-2018
0.50
4 - Mounted Hstab for connector wiring plan
Details
       

 05-18-2018
1.00
2 - Installed soundproofing foam to luggage back
Details
       

 05-18-2018
1.00
1 - Assembled and installed foam to luggage floor
Details
       

 05-17-2018
0.80
6 - Rudder fitment
Details
       

 05-17-2018
0.70
5 - VStab fitment
Details
       

 05-17-2018
1.50
4 - Ran tubing conduit and wires
Details
       

 05-17-2018
0.50
3 - fit autpilot brackets and grommets
Details
       

 05-17-2018
0.50
2 - repaired front luggage shelf
Details
       

 05-16-2018
0.50
8 - wire and coax routing
Details
       

 05-16-2018
1.00
6 - Installing rudder cables
Details
       

 05-16-2018
0.50
5 - Fitting rudder cables and hardware
Details
       

 05-15-2018
1.50
1 - Installed left longeron with rivets
Details
       

 05-14-2018
2.50
3 - Riveted step supports
Details
       

 05-14-2018
4.50
2 - Riveted tail cone side skins
Details
       

 05-14-2018
3.00
1 - Installed top skins and riveted bottom of tail
Details
       

 05-13-2018
2.00
2 - Temporary install of top skins
Details
       

 05-13-2018
3.00
1 - Fitting Tail Skins
Details
       

 05-12-2018
2.50
2 - Test fitting rear skins
Details
       

 05-12-2018
2.50
1 - Primed and re-installed brackets
Details
       

 05-11-2018
0.50
5 - Test fit top RF longerons
Details
       

 05-11-2018
1.00
4 - RF Brackets test fit
Details
       

 05-11-2018
2.00
3 - Assembled Longerons to Tail Cone Ribs
Details
       

 05-11-2018
2.00
2 - Riveted tail cone floor assembly
Details
       

 05-11-2018
3.00
1 - Prepared tail cone for assembly
Details
       

 05-10-2018
1.00
3 - Riveted longerons
Details
       

 05-10-2018
0.50
2 - RF Longerons assembly continued
Details
       

 05-10-2018
1.50
1 - Rear fuselage longerons
Details
       

 05-04-2018
0.50
4 - Mounted Horizontal tail for wiring plan
Details
       

 05-01-2018
1.00
1 - Riveted stringer to luggage floor and install
Details
       

 04-24-2018
1.50
RRRibs and more ribs
Details
 

 04-24-2018
3.00
RRibs #3 & #2 completed
Details
       

 04-24-2018
2.00
Ribs #5 and #4 assembly
Details
       

 04-23-2018
1.00
Rib 9 Assembly completed
Details
       

 04-23-2018
4.00
Rib 9 Assembly
Details
       

 04-22-2018
1.50
Started rear fuselage
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.