Work Logs Found:
71
Category Work Time:
109 Hours
Date
Hours
Work Log Summary
Details
12-31-2019
0.50
2 Leak tested static and pitot lines
Details
12-31-2019
2.00
1 Installed Pitot and Static lines
Details
12-28-2019
2.00
Installed radio rack
Details
12-24-2019
2.00
Assembled Radio rack
Details
12-23-2019
2.00
NAV122, dimmers and a panel stand
Details
12-21-2019
1.50
Installed circuit breakers and ELT switch
Details
12-14-2019
1.00
Instrument lighting, switch caps and static source
Details
12-08-2019
0.50
4 Installed Garmin G3X Touch
Details
12-08-2019
1.00
3 Installed toggle switches
Details
12-08-2019
1.00
2 Altimeter lighting and toggle switches
Details
12-08-2019
0.50
1 flap switch installation
Details
12-07-2019
1.50
switch guards and instruments
Details
12-01-2019
1.00
Started panel assembly
Details
11-30-2019
0.50
Clear coated panel
Details
11-29-2019
1.50
1 Applied Decals to Panel
Details
11-23-2019
1.50
Primed and painted Avionics panel
Details
06-18-2019
1.00
Panel & Dash Modifications
Details
06-15-2019
1.00
Assembled Com radio rack
Details
06-13-2019
1.00
Panel and Dash Modifications
Details
06-12-2019
0.50
Radio rack and bracket fitting
Details
06-08-2019
1.50
Fabricated radio stack brackets
Details
05-26-2019
0.50
Test Fitting Panel
Details
05-23-2019
1.50
Ordered Dry Transfer Labels
Details
05-17-2019
0.50
Received Panel Today
Details
05-10-2019
2.00
Panel sent out to for Fab
Details
05-09-2019
1.00
Replaced indicator lights with larger size
Details
05-08-2019
2.00
Added Marker Beacon Switches
Details
05-07-2019
3.00
Tweaked Panel Layout
Details
05-03-2019
3.00
Finalized Panel Layout
Details
05-01-2019
7.00
Instrument Panel Design
Details
03-28-2019
0.50
2 - installed baggage dome light
Details
03-28-2019
1.00
1 - wired cockpit spot lights
Details
03-20-2019
1.00
2 - installed airframe connectors for tail
Details
03-20-2019
0.50
1 - finished GMU 11 connector wiring
Details
03-19-2019
1.30
2 - Tail connector rivnuts
Details
03-19-2019
0.50
1 - Magnetometer connector
Details
03-15-2019
2.00
Fabricated bracket and mounted magnetometer
Details
03-14-2019
0.70
2 - HStab pass-through wire connectors
Details
03-14-2019
1.00
1 - Trim tab, wire grommet & magnetometer
Details
03-12-2019
1.50
Rewired and installed trim servo
Details
03-11-2019
1.00
Completed wiring of vertical stab & rudder
Details
03-07-2019
3.00
Rudder / Vert Stab connector for tail light
Details
03-06-2019
1.00
Soldered 4-pin connector jack to tail light
Details
03-04-2019
1.00
2 - installed a plug connector for the servo cable
Details
03-04-2019
1.00
1 - installed connector jack on elevator trim serv
Details
03-03-2019
0.50
Riveted empennage connector bracket
Details
02-17-2019
1.00
1 - Replaced static source rivets
Details
12-31-2018
1.00
Static ports installation
Details
12-22-2018
1.00
Proposed G3X Interconnect Diagram
Details
10-22-2018
1.00
Ebay Instruments
Details
10-17-2018
1.50
Installed comm antenna and mounting plates
Details
10-15-2018
0.40
2 - Installed Comm & Nav coax connectors
Details
10-15-2018
0.60
1 - Comm antenna mount prep
Details
10-13-2018
1.00
Installed VOR antenna BNC flange connector
Details
10-12-2018
0.50
BNC connector crimping - practice
Details
10-04-2018
1.00
2 - Transponder and ADS-B "IN" antennas
Details
10-04-2018
1.00
1 - Marker Beacon antenna installation
Details
08-26-2018
2.00
New panel layout with custom Flap Controls
Details
08-25-2018
3.00
1 - Latest Panel Layout
Details
07-27-2018
4.00
Fit prototype panel and avionics to dash
Details
07-02-2018
2.50
Installed Cabin Lights
Details
06-29-2018
2.00
NEW PANEL LAYOUT
Details
06-27-2018
2.00
Latest panel layout rendering
Details
06-23-2018
10.00
Avionics Panel Layout
Details
06-21-2018
6.00
Avionics Panel Layout
Details
06-18-2018
3.00
Avionics panel layout in CAD
Details
05-13-2018
1.00
1 - Ordered ELT, Pitch Servo, GPS & ADS-B Antennas
Details
05-11-2018
0.00
Avionics Panel #16
04-25-2018
0.00
Panel #13A
Details
04-24-2018
0.20
New UHF Antenna
Details
04-21-2018
0.00
My latest panel idea
Details
SITE NAVIGATION
Contact Builder
Sling 2 Home
Category
# Logs
# Hours
All
484
705
Avionics
71
109
Canopy
1
0
Central Fuselage
86
138
Controls
30
35
Elevator
16
31
Engine
12
10
Firewall Forward
33
39
Horiz Stabilizer
10
18
Miscellaneous
5
0
Rear Fuselage
63
101
Rudder
9
14
Shop & Tools
9
5
Undercarriage
16
16
Vertical Stabilizer
11
17
Wings
112
172