KitLog pro

Powered By Kitlog Pro v2.0

Wades Web Site
Work Logs Found: 23
Category Work Time: 61 Hours
 Date
Hours
Work Log Summary

Details

 12-05-2018
2.00
Flox install cable connectors baggage bulkhead 2x

 12-04-2018
3.00
Prep, sand, flox install rear cable bulkhead

 12-04-2018
1.00
Flox install cable connectors 2x

 11-06-2018
4.50
4BID surround on nose gear tunnel

 09-11-2018
2.00
Center wing fuel lines - final mount and torque

 09-10-2018
5.00
Fuel lines and fittings wing connection

 09-10-2018
3.00
Fuel line fabrication

 09-05-2018
0.50
Sand upper gear fairings

 09-05-2018
2.50
Fuel selector valve with mount ready for install

 09-05-2018
1.00
finish sand & Reinstall wheel fairings

 09-04-2018
0.50
Sand wheel fairings

 08-31-2018
2.00
sand and micro wheel fairings

 08-31-2018
1.50
Micro upper right fairing

 08-31-2018
2.00
Bond upper right main gear fairing

 08-30-2018
3.00
Remove hinge from gear fairing, prep for fairing b
       

 08-30-2018
4.00
prep and install upper left fairing, bond right la
       

 08-30-2018
1.00
Inspection panel nutplates 4x

 08-29-2018
4.00
Landing gear fairing prep
       

 08-29-2018
2.00
Aileron servo fairing install

 08-28-2018
6.00
Landing gear install
       

 08-23-2018
5.00
CAD design tail dragger leg mounts and source part

 08-22-2018
2.00
Surface finish and trim wheel tunnel areas

 08-22-2018
3.50
Demolish/remove nose wheel tunnel










Copyright © 2001-2024 Matronics. All Rights Reserved.