Powered By Kitlog Pro v2.0
Wades Web Site
Barracuda
Fuselage
Work Logs Found:
23
Category Work Time:
61 Hours
Date
Hours
Work Log Summary
Details
12-05-2018
2.00
Flox install cable connectors baggage bulkhead 2x
12-04-2018
3.00
Prep, sand, flox install rear cable bulkhead
12-04-2018
1.00
Flox install cable connectors 2x
11-06-2018
4.50
4BID surround on nose gear tunnel
09-11-2018
2.00
Center wing fuel lines - final mount and torque
09-10-2018
5.00
Fuel lines and fittings wing connection
09-10-2018
3.00
Fuel line fabrication
09-05-2018
0.50
Sand upper gear fairings
09-05-2018
2.50
Fuel selector valve with mount ready for install
09-05-2018
1.00
finish sand & Reinstall wheel fairings
09-04-2018
0.50
Sand wheel fairings
08-31-2018
2.00
sand and micro wheel fairings
08-31-2018
1.50
Micro upper right fairing
08-31-2018
2.00
Bond upper right main gear fairing
08-30-2018
3.00
Remove hinge from gear fairing, prep for fairing b
08-30-2018
4.00
prep and install upper left fairing, bond right la
08-30-2018
1.00
Inspection panel nutplates 4x
08-29-2018
4.00
Landing gear fairing prep
08-29-2018
2.00
Aileron servo fairing install
08-28-2018
6.00
Landing gear install
08-23-2018
5.00
CAD design tail dragger leg mounts and source part
08-22-2018
2.00
Surface finish and trim wheel tunnel areas
08-22-2018
3.50
Demolish/remove nose wheel tunnel
SITE NAVIGATION
Contact Builder
Barracuda Home
Category
# Logs
# Hours
All
121
972
Avionics
2
4
Body & Paint
10
26
Engine
2
5
Fuselage
23
105
Interior
1
1
Miscellaneous
3
16
Parts
59
192
Systems
8
28
Tail Group
6
69
Tools
2
17
Wings
5
509
Mako Home
Copyright © 2001-2024 Matronics. All Rights Reserved.