Norris's RV Construction
Work Logs Found: 58
Category Work Time: 310 Hours
 Date
Hours
Work Log Summary

Details

 01-31-2022
9.00
All day working on the windshield deice

 03-22-2021
5.00
Deice test
Details

 03-19-2021
5.00
Get deice actuators ready for install in R tank
       

 03-19-2021
4.50
Fuel tank install of deice leading edge skin
       

 03-18-2021
6.00
Making the deice leadfing edge shapped

 03-16-2021
5.00
Cet the skin off over the R tank deice channel
     

 03-08-2021
5.00
Riveted the deice "trough" to the tank skin

 03-04-2021
2.00
Riveted the two halfs of the deice channel
Details
       

 03-03-2021
3.50
Made the channel to hold ther deice actuators

 02-26-2021
7.50
Deice install
Details
     

 02-19-2021
6.00
Testing the deice system with repaired tail contro
Details

 02-09-2021
3.00
Rewiring the tail with larger plugs

 01-12-2021
8.00
Finished Rewiring Deice CAN cables and testing

 01-11-2021
4.00
Started rewiring the Deice CAN cables for 18 Ga

 01-08-2021
9.00
Deice testing and rewire
Details

 01-07-2021
8.00
Full system test. Tail quit working in the morni

 01-05-2021
6.00
Install deice actuator status display
       

 01-01-2021
6.00
Installed deice unit on the L tank and tank on win
     

 12-31-2020
7.00
Prepping the fuel tank for the deice equipment

 12-30-2020
3.00
Started installing the fuel tank deice parts

 12-15-2020
2.00
Deice Electrical out to the wings

 12-08-2020
8.00
Fabricated and installed the trough bulkhead seals

 12-07-2020
5.00
Made a new trough that is 0.8" deep

 12-04-2020
9.00
Got the deice actuator trough fitted inside the ta
     

 12-02-2020
8.00
Installing trough on left fuel tank

 12-01-2020
5.00
Finished actuator fixtures. Started the trough.
     

 11-30-2020
7.00
Making wing tank deice parts
Details
       

 11-24-2020
7.00
Designing and testing different fuel tank fixtures

 11-23-2020
2.00
Make fuel tank deice fixture and test. Tested OK
     

 11-20-2020
5.00
Finished wiring and testing the new deice controls
       

 11-19-2020
6.00
See details
Details

 11-17-2020
7.50
Worked on forming tghe fuel tank outer skins

 11-16-2020
6.00
Second skin fixture
Details
       

 11-13-2020
6.00
Tested Deice. Worked OK. Finished L forward wing

 11-12-2020
8.00
Redid to tight brackets and installed actuators

 11-10-2020
8.00
Installed the actuator brackets in the L nose
     

 11-09-2020
7.00
Making controller door. Made target and attach br
     

 11-06-2020
7.00
Designing and making controller mounting brackets

 10-14-2020
6.00
Making a mock up of the fuel tank deice constructi

 05-19-2020
2.00
Worked on trying to connect VPN. Didn't work.

 03-06-2020
8.00
Deice controller install
Details
       

 11-23-2019
3.00
Finished riviting the horz stab back together

 11-22-2019
5.00
Riveting L horz stab back together

 11-21-2019
6.00
Preping L horz stab for riveting back together

 11-20-2019
5.00

Details
       

 11-15-2019
8.00
Finished prep for R Horz stab and installed. Prep
     

 11-14-2019
2.00
Preped parts for R Horz stab install

 11-13-2019
2.00
Drilled out half of horz stab to install deice
     

 09-26-2019
3.00
drilling pattern for brackets and target
       

 09-25-2019
2.00
started installing on vertical tail
       

 04-18-2018
2.00
Make and install 6ga cables in the horz stab

 03-30-2018
6.00
Design and mfg a bracket for the rear deice module

 03-29-2018
2.50
Mfg studs and installing same

 03-27-2018
2.00
Finish making three more stude

 03-23-2018
5.00
Completed and installed one deice atud
       

 03-22-2018
6.00
Making parts for deice connector studs

 03-21-2018
6.00
Continue making deice studs

 03-20-2018
3.00
Work on making wing studs