LARRY'S WEB SITE
Work Logs Found: 94
Category Work Time: 310 Hours
 Date
Hours
Work Log Summary

Details

 05-12-2019
2.30
Final Ironing of the Fuselage
Details

 05-11-2019
2.60
Finished Taping the Fuselage
Details
     

 05-10-2019
3.80
Continue To Tape The Fuselage
Details
     

 05-07-2019
3.60
Installing Fabric Tape to the Fuselage
Details

 05-06-2019
3.30
Glued Down the Right Side Top Fabric
Details
     

 05-04-2019
3.20
Installing Fabric on the Turtleback
Details
     

 05-03-2019
3.10
Installed Elevator Cable Fairings
Details
     

 05-01-2019
2.30
Finishing Fabric Around Landing Lights
Details
     

 04-30-2019
2.80
Installed Access Ports on Bottom of Fuselage
Details
     

 04-29-2019
3.10
Taped the Edges of the Wing Stubs
Details

 04-28-2019
3.10
Rivet Stitch Right Wing Stub
Details
     

 04-26-2019
4.00
Right Side Wing Stub Covering
Details
     

 04-25-2019
3.50
Completed First Ironing of Right Side Fuselage
Details
     

 04-24-2019
3.50
Covering Right Side of the Fuselage
Details

 04-22-2019
3.50
Rivet Stitched Bottom of Left Wing Stub
Details
       

 04-21-2019
2.50
Completed Covering Left Wing Stub
Details
       

 04-19-2019
1.50
Fitting the Top Cover on the Left Wing Stub
Details
     

 04-18-2019
3.70
Covering the Left Wing Stub
Details
     

 04-17-2019
3.50
Ironed the Left Side Fabric
Details
       

 04-16-2019
3.00
Finished Gluing Up the Left Side Fuselage Covering
Details
     

 04-15-2019
2.50
Fiting the Fuselage Lift Side Fabric
Details
     

 04-11-2019
2.50
Ironed the Bottom Fabric on the Fuselage
Details
       

 04-05-2019
3.50
Continued Covering the Bottom of the Fuselage
Details
       

 04-03-2019
2.50
Started Covering the Bottom of the Fuselage
Details
     

 04-02-2019
3.00
Laid Out Fabric On Fuselage
Details
       

 06-29-2018
4.00
Install Access Ports on Bottom of Upper Left Wing
Details
     

 06-28-2018
3.80
Completed Rivet Stitching the Top of the Upper Lef
Details
       

 06-26-2018
2.00
Start of Rivet Stitching on Top of Upper Left Wing
Details

 06-24-2018
3.20
Fabric Taping of the Bottom of the Upper Left Wing
Details
     

 06-21-2018
3.00
300 Degree Ironing of the Upper Left Wing
Details
     

 06-19-2018
3.00
250 Degree Ironing of the Upper Left Wing
Details
     

 06-18-2018
4.00
Covering the Top of the Upper Left Wing
Details
       

 06-15-2018
1.50
Completed the Bottom Covering of the Upper Left Wi
Details

 06-14-2018
3.00
Covering the Bottom of the Upper Left Wing
Details

 06-11-2018
4.00
Completed Covering of the Upper Right Wing
Details
     

 06-08-2018
3.00
Fabric Tape on Bottom of Upper Right Wing
Details
     

 06-04-2018
3.50
Pop Rivet Stitching Top of the Upper Right Wing
Details
       

 06-03-2018
3.00
300 Degree Ironing of Upper Right Wing
Details
     

 05-31-2018
2.00
250 Degrees Ironing of the Upper Right Wing
Details

 05-30-2018
2.50
Covered the Top of the Upper Right Wing
Details
     

 05-29-2018
4.00
Prep of the Top of the Upper Right Wing
Details
       

 05-27-2018
5.00
Covered the Bottom of the Upper Right Wing
Details

 05-26-2018
3.00
Finished Center Wing Section Installed Access Hole
Details
     

 05-25-2018
4.00
Installation of Access Holes on Center Wing Sectio
Details
     

 05-24-2018
4.30
Rivet Stitched Bottom of Center Wing Section
Details
       

 05-21-2018
5.00
Top Covering Center Section of the Wing
Details
       

 05-20-2018
3.25
Covered Bottom of Center Wing Section
Details

 05-18-2018
3.20
Start Prep of Center Wing Section
Details
     

 05-17-2018
1.00
Finished Lower Left Wing Patch and Racked It
Details
     

 05-16-2018
3.00
Fix End Rib of Lower Left Wing
Details
       

 05-14-2018
3.50
Finished the Top of the Lower Left Wing
Details
     

 05-13-2018
2.00
Start Rivet Stitch Top Lower Left Wing
Details
     

 05-12-2018
2.00
Inspection Ports on Bottom Lower Left Wing
Details
     

 05-11-2018
4.00
Rivet Stitched Bottom of Lower Left Wing
Details
     

 05-08-2018
5.00
Installed the Top Fabric on the Lower Left Wing
Details
     

 05-07-2018
3.00
250 Degree Ironing of Bottom Fabric Lower Left Win
Details
     

 05-04-2018
3.00
Covered the Bottom of the Lower Left Wing
Details
     

 05-03-2018
2.30
Continued Work on Covering Lower Left Wing
Details
     

 05-02-2018
3.50
Finished Prep Work for Covering on Lower Left Wing
Details
       

 04-30-2018
3.60
Finished the Covering of the Lower Right Wing
Details
     

 04-29-2018
3.80
Pop Rivet Stitching of Bottom Lower Right Wing
Details
     

 04-28-2018
6.00
Completed the Top of the Lower Right Wing
Details
       

 04-26-2018
3.00
Pop Rivet Stitch on Top Lower Right Wing
Details
       

 04-24-2018
3.50
250 Degree Ironing of Top Lower Right Wing
Details
     

 04-20-2018
3.00
Covering the Top of the Lower Right Wing
Details
     

 04-19-2018
3.50
Continuing Covering of Lower Right Wing
Details
       

 04-18-2018
4.50
Covering the Bottom of the Lower Right Wing
Details
     

 04-16-2018
5.00
Prep of Lower Right Wing for Covering
Details
       

 04-06-2018
2.50
Horizontal Stabilizer Control Cable Penetrations
Details
       

 04-05-2018
2.50
Control Cable Paths Through the Horizontal Stabili
Details
     

 04-04-2018
2.50
Finished Covering the Top Left Aileron
Details
     

 04-03-2018
3.00
Covering the Top Left Aileron
Details
       

 04-02-2018
5.70
Finished Covering the Lower Left Aileron
Details
     

 03-30-2018
3.00
Covering of Lower Left Aileron
Details
       

 03-29-2018
2.00
Covering of the Lower Left Aileron
Details
     

 03-28-2018
3.00
Started Covering the Lower Left Aileron
Details
       

 03-27-2018
3.00
Finished the Top Right Aileron
Details
       

 03-26-2018
3.50
Covering of the Top Right Aileron
Details
     

 03-24-2018
4.00
Finished Covering the Lower Right Aileron
Details
       

 03-23-2018
3.30
Continuing Covering of Lower Right Aileron
Details
       

 03-22-2018
3.50
Finished Horizontal Stabilizer and Worked Lower Ri
Details
       

 03-19-2018
3.20
Start of Covering on Lower Right Aileron
Details
       

 03-18-2018
4.25
Continued Work on Horizontal Stabilizer
Details
     

 03-17-2018
4.75
Started Covering the Horizontal Stabilizer
Details
       

 03-07-2018
4.50
Completed Covering the Elevator
Details
     

 03-06-2018
4.50
Elevator Covering Continues
Details
       

 03-05-2018
4.00
Continued Covering Left Side of Elevator
Details

 03-04-2018
2.50
Finished Vertical Stabilizer and Continued Elevato
Details
       

 03-03-2018
5.00
Covering of Vertical Stab and Elevator
Details
       

 03-02-2018
2.00
Start of Covering of the Vertical Stabilizer
Details
       

 03-01-2018
2.50
Full Tension on Rudder Fabric and Pop Rivet Stitch
Details
     

 02-26-2018
3.00
Continued Work on the Right Side of the Rudder
Details
     

 02-25-2018
3.00
Covering of Right Side of the Rudder
Details
     

 02-23-2018
4.00
Covered the Left Side of the Rudder
Details
     