Brendons Kit Log
RV-10
Doors
Work Logs Found:
16
Category Work Time:
83 Hours
Date
Hours
Work Log Summary
Details
04-15-2018
4.00
Fit door seals
Details
03-25-2018
4.00
Build up door - cabin top gap
Details
03-24-2018
4.00
Door Seal Install
Details
03-17-2018
4.00
Prep and Prime Doors
Details
03-10-2018
4.00
Close in door hinge pockets
Details
03-03-2018
8.00
Installed Door Struts
03-02-2018
6.00
Left Door Finish Latch, Strut, Window
Details
02-28-2018
8.00
Left Door Latch, Pins, Blocks
02-25-2018
4.00
Right Door Center Latch, Strut Bracket
02-24-2018
8.00
Finish Right Door Latch
02-18-2018
6.00
Left Door Trim, Hinge Install, Start on Latch
Details
02-17-2018
6.00
Right Door Trim, Install on Hinges
Details
02-13-2018
2.00
Bonded left door
Details
02-11-2018
5.00
Right door bonding
Details
02-10-2018
6.00
Left door work
Details
02-09-2018
4.00
Started Right Door
Details
SITE NAVIGATION
RV-10 Home
Category
# Logs
# Hours
All
488
1672
Aileron
8
34
Doors
16
83
Electrical
16
66
Elevator
24
64
Empennage
15
56
Engine
17
72
Finishing
37
109
Firewall
4
11
Flaps
12
42
Fuel Tanks
17
92
Fuselage
130
461
HS
18
54
Inspection
1
Interior
15
64
Landing Gear
5
19
Miscellaneous
1
Moving
3
8
Panel
5
16
Practice
5
8
Prop
6
12
Rudder
13
34
Tailcone
32
78
Tools
1
VS
11
26
Windows
9
41
Wing - LEFT
28
87
Wing - RIGHT
22
69
Wings
17
66
Copyright © 2001-2024 Matronics. All Rights Reserved.