KitLog pro

Powered By Kitlog Pro v2.0

Williams Web Site
Work Logs Found: 56
Category Work Time: 144 Hours
 Date
Hours
Work Log Summary

Details

 10-17-2018
1.00
Weigh in
Details

 10-03-2018
2.00
Signage
Details

 10-02-2018
2.00
Wheel base measurements
Details

 10-01-2018
4.00
installed all center constol sides
Details

 09-30-2018
2.00
Completed install of armrest/stick cover.
Details

 09-29-2018
2.00
Replaced missing rivits.
Details

 09-05-2018
3.00
Fitted windshield
Details

 09-03-2018
2.00
boot cowl
Details

 09-02-2018
2.00
boot cowl and glare shield
Details

 09-01-2018
2.00
boot cowl and top window
Details

 08-31-2018
2.00
preped dash anti glare sheild
Details

 08-29-2018
2.50
Glare shield
Details

 08-28-2018
2.00
glare sheild
Details

 08-27-2018
3.50
installed baggage carpet seat belts
Details

 08-26-2018
4.00
Route cables and hoses set carpet velcro
Details

 08-05-2018
2.00
Drained fuel.
Details

 08-04-2018
2.00
Taxi test
Details

 07-28-2018
2.00
Taxi test
Details

 07-27-2018
2.00
taxi test
Details

 07-24-2018
2.00
Replaced battery
Details

 07-21-2018
3.00
Taxi with cowl on
Details

 07-19-2018
2.00
Taxi test
Details

 07-18-2018
2.00
runst on steering rods
Details

 07-17-2018
2.00
bled brakes.
Details

 07-16-2018
3.00
parking brake problems
Details

 07-15-2018
2.00
Taxi test
Details

 07-13-2018
2.00
paint
Details

 07-05-2018
2.00
begarn reassembly
Details

 07-04-2018
2.00
Paint tubes and rods
Details

 07-03-2018
1.00
control rods
Details

 06-21-2018
8.00
Buff and shine
Details

 06-05-2018
2.00
gascolator leak
Details

 05-28-2018
2.00
center console
Details

 05-27-2018
3.00
Center console
Details

 05-23-2018
2.00
Install center console
Details

 05-05-2018
3.00
wiring
Details

 04-26-2018
3.00
Fuel pums
Details

 04-23-2018
2.00
lights
Details

 04-22-2018
3.00
lights
Details

 04-07-2018
3.00
fuel lines and electric
Details
     

 04-06-2018
3.00
Fuel and electric
Details

 04-05-2018
3.00
Hose and electric
Details

 04-04-2018
3.00
routed fuel line
Details

 03-30-2018
2.00
fuel lines
Details

 03-24-2018
4.50
fuel shut off valve repostioned
Details

 03-22-2018
3.00
Reroute fuel lines
Details

 03-21-2018
3.00
Header tank
Details

 03-15-2018
3.00
header tank install
Details

 03-11-2018
3.00
Drilled hole for return line
Details

 03-10-2018
2.00
Header tank install
Details

 03-09-2018
3.00
L bracket for header
Details

 03-08-2018
3.00
Fuel lines
Details

 03-07-2018
2.00
Plumb fuel lines
Details

 03-06-2018
3.00
Plumb fuel lines
Details

 03-05-2018
2.00
Fuel line
Details

 02-01-2018
3.00
Move to hanger
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.