Powered By Kitlog Pro v2.0
Williams Web Site
CH 750 Cruser
Miscellaneous
Work Logs Found:
56
Category Work Time:
144 Hours
Date
Hours
Work Log Summary
Details
10-17-2018
1.00
Weigh in
Details
10-03-2018
2.00
Signage
Details
10-02-2018
2.00
Wheel base measurements
Details
10-01-2018
4.00
installed all center constol sides
Details
09-30-2018
2.00
Completed install of armrest/stick cover.
Details
09-29-2018
2.00
Replaced missing rivits.
Details
09-05-2018
3.00
Fitted windshield
Details
09-03-2018
2.00
boot cowl
Details
09-02-2018
2.00
boot cowl and glare shield
Details
09-01-2018
2.00
boot cowl and top window
Details
08-31-2018
2.00
preped dash anti glare sheild
Details
08-29-2018
2.50
Glare shield
Details
08-28-2018
2.00
glare sheild
Details
08-27-2018
3.50
installed baggage carpet seat belts
Details
08-26-2018
4.00
Route cables and hoses set carpet velcro
Details
08-05-2018
2.00
Drained fuel.
Details
08-04-2018
2.00
Taxi test
Details
07-28-2018
2.00
Taxi test
Details
07-27-2018
2.00
taxi test
Details
07-24-2018
2.00
Replaced battery
Details
07-21-2018
3.00
Taxi with cowl on
Details
07-19-2018
2.00
Taxi test
Details
07-18-2018
2.00
runst on steering rods
Details
07-17-2018
2.00
bled brakes.
Details
07-16-2018
3.00
parking brake problems
Details
07-15-2018
2.00
Taxi test
Details
07-13-2018
2.00
paint
Details
07-05-2018
2.00
begarn reassembly
Details
07-04-2018
2.00
Paint tubes and rods
Details
07-03-2018
1.00
control rods
Details
06-21-2018
8.00
Buff and shine
Details
06-05-2018
2.00
gascolator leak
Details
05-28-2018
2.00
center console
Details
05-27-2018
3.00
Center console
Details
05-23-2018
2.00
Install center console
Details
05-05-2018
3.00
wiring
Details
04-26-2018
3.00
Fuel pums
Details
04-23-2018
2.00
lights
Details
04-22-2018
3.00
lights
Details
04-07-2018
3.00
fuel lines and electric
Details
04-06-2018
3.00
Fuel and electric
Details
04-05-2018
3.00
Hose and electric
Details
04-04-2018
3.00
routed fuel line
Details
03-30-2018
2.00
fuel lines
Details
03-24-2018
4.50
fuel shut off valve repostioned
Details
03-22-2018
3.00
Reroute fuel lines
Details
03-21-2018
3.00
Header tank
Details
03-15-2018
3.00
header tank install
Details
03-11-2018
3.00
Drilled hole for return line
Details
03-10-2018
2.00
Header tank install
Details
03-09-2018
3.00
L bracket for header
Details
03-08-2018
3.00
Fuel lines
Details
03-07-2018
2.00
Plumb fuel lines
Details
03-06-2018
3.00
Plumb fuel lines
Details
03-05-2018
2.00
Fuel line
Details
02-01-2018
3.00
Move to hanger
Details
SITE NAVIGATION
Contact Builder
CH 750 Cruser Home
Category
# Logs
# Hours
All
253
754
Avionics
43
100
Empennage
47
166
Engine
20
62
Fuselage
51
128
Miscellaneous
56
144
None
1
2
Tools
3
8
Wings
32
144
Copyright © 2001-2024 Matronics. All Rights Reserved.