KitLog pro

Powered By Kitlog Pro v2.0

MIKE'S WEB SITE
Work Logs Found: 24
Category Work Time: 55 Hours
 Date
Hours
Work Log Summary

Details

 05-17-2018
1.75
bottom cowl
Details

 05-15-2018
1.45
Exhaust temperature sensor
Details

 05-08-2018
1.50
Assembling oil cooler frame
Details

 05-07-2018
1.50
Assembling oil cooler frame
Details

 05-01-2018
1.45
Drip Pans and Carbs
Details

 04-30-2018
1.45
Oil Drip Pans
Details

 04-26-2018
1.50
Radiator
Details

 04-24-2018
1.50
Radiator
Details

 04-23-2018
1.50
Attaching battery wires
Details

 04-20-2018
1.45
Fuel Drain Line
Details

 04-19-2018
1.45
Engine Wiring
Details

 04-18-2018
1.45
hoses
Details

 04-17-2018
1.45
Wiring and Hoses
Details

 04-11-2018
3.00
Engine/Fuselage
Details
     

 03-15-2018
3.75
Trevor and grayson
Details
       

 03-15-2018
3.75
riveting deburing and sanding
Details
       

 03-13-2018
3.75
Grayso, trevor and ryan
Details
       

 03-12-2018
3.75
Grayson and trevor
Details
       

 03-02-2018
1.50
Worked on engine
Details

 03-02-2018
3.75
Deburr author by isaac j
Details
     

 03-01-2018
3.75
engine mount author by isaac j
Details
       

 02-28-2018
3.75
battery author by isaac j
Details
       

 02-27-2018
3.75
Started spacer work on powerplant author by isaac
Details
       

 02-23-2018
1.25
worked on engine
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.