Powered By Kitlog Pro v2.0
RV-7 Some assembly required
RV-7
Finishing
Work Logs Found:
103
Category Work Time:
211 Hours
Date
Hours
Work Log Summary
Details
10-10-2018
0.00
Classic Aero Seats
Details
09-23-2018
3.00
Canopy bumpers
Details
08-29-2018
1.00
Cabin frame and F-732A channel
Details
08-27-2018
2.00
Baggage floor cargo mat
Details
08-17-2018
2.00
Riveted seat panels II
Details
08-13-2018
2.00
Seat panels
Details
08-06-2018
1.50
Primed the shortened console
Details
05-31-2018
0.10
Grips for the stick
Details
03-14-2018
2.00
Primed and painted the console
Details
02-10-2018
3.00
Remaining canopy rivets
Details
02-10-2018
3.00
New tunnel cover
Details
02-08-2018
3.00
New C-710 pushrod
Details
12-16-2017
1.00
Drilled the armrest padding
Details
12-06-2017
0.50
Prosealed glare shield vents
Details
11-26-2017
2.00
Riveted the latch handle angles
Details
11-11-2017
1.50
Finished the latch bearing and cover
Details
11-06-2017
0.50
Continued the latch bearing
Details
11-05-2017
1.50
Continued the latch bearing
Details
11-04-2017
1.50
Started new latch bearing
Details
10-23-2017
1.00
Installed the latch handle and lock
Details
10-21-2017
2.00
Painted the latch hardware
Details
10-18-2017
1.50
Painted the lock guide hardware
Details
10-17-2017
2.00
Shaped the lock guide hardware
Details
10-16-2017
1.00
Riveted side skirts
Details
10-15-2017
3.00
Used the latch install template for lock install
Details
10-14-2017
2.00
Sikaflexed the side skirts
Details
10-14-2017
2.00
Made cover for the latch bearing
Details
10-13-2017
1.00
Started working on the canopy latch
Details
10-11-2017
1.50
Finished the new latch bearing cover
Details
09-30-2017
2.50
Cut opening for canopy lift tab
Details
09-29-2017
1.00
Marked up slot for canopy lifting tab
09-19-2017
2.00
Primed the canopy side skirts
Details
09-17-2017
3.00
Finished the canopy skirts
Details
09-03-2017
2.00
Powder coated the grills
Details
08-27-2017
3.50
Fitted and drilled the canopy side skirts
Details
08-23-2017
1.00
Made dies for grill forming
Details
08-20-2017
4.00
Making the glare shield inlay
Details
08-18-2017
1.00
Glare shield padding
Details
08-15-2017
1.50
Made a delrin strip for the 2nd canopy latch
Details
08-14-2017
1.00
Adjusted the latch.
Details
08-13-2017
1.00
Test sanding sikaflex
Details
08-13-2017
4.00
Installed canopy latch lug and guides
Details
08-12-2017
2.00
Refining the sikaflex beads
Details
08-12-2017
2.00
Creating glare shield template
Details
08-11-2017
4.00
Sikaflexed in place
Details
08-11-2017
1.00
Prepping for Sikaflex
Details
08-10-2017
3.00
Final prep before Sikaflex day
Details
08-09-2017
3.00
Masked and tested canopy clamping
Details
08-08-2017
2.00
Painted the canopy frame
Details
08-07-2017
2.00
Finished the canopy install angles
08-06-2017
3.00
Started canopy install angles
Details
08-06-2017
1.00
Prepping the canopy frame
Details
08-05-2017
2.00
Glare shield smoothing
Details
08-04-2017
1.00
Finishing the canopy gaps
Details
08-03-2017
2.00
Further smoothing the canopy gaps
Details
08-02-2017
2.50
Smoothing canopy gaps
Details
08-01-2017
2.50
Filling canopy gaps
Details
07-31-2017
1.50
Strut anchors II
Details
07-29-2017
6.00
Canopy braces riveted
Details
07-28-2017
6.00
Started riveting canopy skin
Details
07-27-2017
2.50
Made openings for vent fans
Details
07-20-2017
2.00
Vent fan mounting
Details
07-18-2017
1.50
Vent openings
Details
07-17-2017
1.00
Vent openings
Details
07-16-2017
3.00
Painted canopy frame
Details
07-12-2017
2.00
Deburr and dimple canopy skin
Details
07-11-2017
2.00
More canopy spacers
Details
07-09-2017
3.00
Primed the canopy parts
Details
07-08-2017
4.00
Drilled the canopy braces to the skin
Details
07-07-2017
2.00
Drilling the canopy braces
Details
07-03-2017
1.00
Started canopy braces
Details
06-24-2017
2.00
Final shaping the canopy skin
Details
06-14-2017
2.00
Deburred the canopy frame
Details
06-13-2017
1.50
Drilled the canopy skin
Details
06-11-2017
1.50
Left canopy spacers
Details
06-10-2017
4.00
Right canopy spacers
Details
05-28-2017
1.50
Finished riveting the canopy frame
Details
05-28-2017
1.50
Filling the canopy gaps step 2
Details
05-28-2017
4.50
Filling the canopy gaps step 1
Details
05-27-2017
2.00
Started figuring out side skirts
Details
05-26-2017
2.50
Canopy frame final drilling and riveting
Details
05-17-2017
1.50
Trimming the canopy skin
Details
05-16-2017
2.00
New canopy skin
Details
05-16-2017
2.00
More trimming canopy
Details
05-15-2017
1.50
Minor canopy adjustment
Details
05-14-2017
2.00
Trimming aft window
Details
05-14-2017
3.00
Further trimming of canopy
Details
05-13-2017
2.00
The big cut
Details
05-13-2017
0.50
Post cut pictures
Details
05-13-2017
4.00
Canopy trimming
Details
05-11-2017
3.00
Lady gotta new hat
Details
05-08-2017
1.00
Strut hardware
Details
04-29-2017
3.00
Trimming canopy
Details
04-28-2017
1.00
Prepping the canopy for trimming
Details
04-23-2017
2.00
Strut hardware
Details
04-18-2017
1.50
Strut hardware
Details
04-16-2017
2.00
Replaced canopy skin
Details
04-16-2017
2.00
Continued strut hardware
Details
04-15-2017
1.50
Started strut hardware
Details
04-14-2017
1.50
Pained the decks and canopy frame
Details
04-13-2017
3.00
Primed frame and canopy deck
Details
04-09-2017
1.00
Checked the positioning of the canopy frame
Details
04-05-2017
1.00
Dimpled the canopy braces
Details
SITE NAVIGATION
RV-7 Home
Category
# Logs
# Hours
All
984
2084
Avionics
27
40
Empennage
122
300
Engine
4
19
Finishing
103
211
Firewall Forward
20
28
Fuselage
392
782
Miscellaneous
10
13
None
1
Practice
4
6
Shop Supplies
8
14
Training
2
16
Wings
275
627
Workshop
8
14
Workshop and Supplie
8
14
Copyright © 2001-2024 Matronics. All Rights Reserved.