Powered By Kitlog Pro v2.0
Dave's RV-7A Builder's Log
RV-7A
Empennage
Work Logs Found:
56
Category Work Time:
184 Hours
Date
Hours
Work Log Summary
Details
09-10-2017
5.00
Empennage fairing
Details
01-01-2014
1.00
Fiberglass work
Details
12-31-2013
1.50
Fiberglass work
Details
12-28-2013
2.00
Fiberglass work
Details
11-17-2013
2.00
Fiberglass work
Details
09-16-2012
3.00
Attached empennage
Details
05-21-2011
4.00
Attached vertical stabilizer
Details
05-08-2011
4.00
Vertical stab fitting
Details
05-07-2011
1.00
Vertical stabilizer prep
Details
05-01-2011
4.50
Misc elevator construction
Details
04-23-2011
1.00
Elevator work
Details
04-16-2011
2.50
Drilled elevator horns
Details
01-17-2011
0.50
Initial fit of horizontal stabilator
Details
09-07-2005
1.50
Finished elevator trim
Details
08-31-2005
2.00
Finished elevators
Details
08-28-2005
3.00
Rolled elevator leading edges
Details
08-24-2005
2.00
Finished trim tab
Details
08-20-2005
6.50
Riveted left elevator
Details
08-17-2005
10.00
Prep work, riveted right elevator
Details
08-14-2005
5.00
Left elevator and trim tab
Details
08-06-2005
6.00
Left elevator prep
Details
08-03-2005
2.00
Right elevator prep
Details
07-31-2005
4.00
Elevator construction
Details
07-30-2005
5.50
Elevator prep
Details
07-17-2005
3.50
Elevator prep
Details
07-16-2005
3.00
Fabricated elevator stiffeners
Details
07-15-2005
1.50
Rudder finishing
Details
07-13-2005
2.50
Rudder trailing edge
Details
07-12-2005
1.50
Rudder assembly
Details
07-10-2005
6.50
Rudder assembly
Details
06-29-2005
3.00
Primed rudder, began riveting
Details
06-28-2005
1.00
Finished rudder prep work
Details
06-26-2005
0.50
Dimpled rudder rib holes
Details
06-25-2005
5.50
Rudder preparation
Details
06-22-2005
2.50
Rudder substructure
Details
06-19-2005
2.00
Back riveted rudder skins
Details
06-18-2005
8.00
Rudder components
Details
06-16-2005
1.00
Finished vertical stabilizer
Details
06-15-2005
2.00
Riveted skin on VS
Details
06-12-2005
7.00
Vertical spar assembly
Details
06-11-2005
3.50
Vertical stab prep work
Details
06-08-2005
3.00
Vertical spar prep work
Details
06-07-2005
1.00
HS finish work, VS plans study
Details
06-05-2005
7.00
Finished horizontal stab
Details
06-04-2005
7.00
Riveted front spar, left HS skin
Details
06-02-2005
1.00
Riveted hinge brackets to rear spar
Details
06-02-2005
1.00
Remove and replace rivets
Details
06-01-2005
3.50
Empennage priming, riveted rear spar
Details
05-14-2005
3.00
Finished fabricating right HS
Details
05-07-2005
6.00
Finished HS prep work
Details
05-05-2005
0.50
Dimpled substructure
05-04-2005
2.50
Horizontal stab prep work
Details
05-02-2005
0.50
Right horizontal stab preparation
Details
05-01-2005
3.50
Right horizontal stab assembly
Details
04-30-2005
7.00
Forward spar and eft HS assembly
Details
04-27-2005
3.50
Rear spar assembly
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
739
2688
Aircraft Supplies
1
9
Avionics
25
88
Canopy
46
160
Electrical
53
204
Empennage
56
184
Engine
9
27
Finish Kit
42
244
Finish Work
42
244
Firewall Forward
86
314
Flight Testing
3
8
Fuselage
169
541
Instrument Panel
7
24
Interior
3
14
Landing gear
6
16
Miscellaneous
12
56
Prop
2
6
Registration
1
3
Shop Prep
14
37
Systems
22
78
Wings
140
431
Copyright © 2001-2024 Matronics. All Rights Reserved.