KitLog pro

Powered By Kitlog Pro v2.0

Quentin’s Vision EX 229
Work Logs Found: 89
Category Work Time: 460 Hours
 Date
Hours
Work Log Summary

Details

 11-24-2007
5.00
Filled and sanded
Details

 11-22-2007
2.00
foamed in fairing for tailwheel assembly
Details

 11-18-2007
2.00
made and installed phenolic hardpoints for LG moun
Details

 11-13-2007
2.00
installed fiberfax and stainless firewall

 11-05-2007
2.00
cut and fit stainless firewall
Details

 11-04-2007
4.50
aligned and drilled motormount bplt holes, fit and
Details

 11-02-2007
1.00
trimmed cowling flange and prepped side s od forwa
Details

 10-31-2007
1.50
trimmed and sanded upper motor mounts
Details

 10-30-2007
3.50
installed and glassed 4 bid on cowling flanges
Details

 10-21-2007
2.50
made sft's for cowling flange
Details

 10-20-2007
1.00
prepped formica for cowling flange sft
Details

 10-18-2007
2.50
2 bid tapes on inside corners of forward deck
Details

 10-17-2007
4.50
prepped and laid 8 bid for left upper motor mount
Details

 10-12-2007
2.00
trimmed and sanded out air bubbles on motor mount
Details

 10-11-2007
3.00
laid 8 bid for right upper motor mount support
Details

 10-08-2007
1.00
prepped 8 bid for 1 motor mount support
Details

 10-07-2007
1.50
floxed in plywood motor mount supports
Details

 10-06-2007
3.00
cut,fit, and floxed in lower motor mounts and clea
Details

 10-05-2007
2.50
bagged 6 bid on the tail spring to fuselage
Details
       

 10-03-2007
1.00
finished floxing in tail wheel spring, cut bid and
Details

 10-02-2007
2.00
drilled, fit and floxed in tail wheel spring
Details

 10-01-2007
1.50
cleaned up LG tunnel bagging and sanded
Details

 09-30-2007
4.50
prepped and bagged 3 bid on bottom of LG tunnel
Details

 09-27-2007
2.50
sanded out air bubbles and prepped 3 bid for LG tu
Details

 09-25-2007
3.00
sanded out air bubbles and repaired dings in LG tu
Details

 09-23-2007
3.00
Flipped over and cleaned an prepped to glass LG tu
Details

 09-18-2007
2.00
marked and drilled motor mount holes
Details

 09-17-2007
2.50
fit and laided 2 bid tapes on last part of forward
Details

 09-16-2007
2.00
fit and laided 2 bid tapes on first part of forwar
Details

 09-15-2007
1.00
2 bid tapes on center section of forward deck
Details

 09-14-2007
2.00
fit and microed in forward deck
Details

 09-13-2007
1.50
made and installed forward deck bulkhead
Details

 09-10-2007
1.00
added 2 bid to flanges for pedal board
Details

 09-09-2007
3.50
bagged forward deck piece
Details

 09-09-2007
1.00
added 2 more flanges for pedal board
Details

 08-22-2007
1.00
added 3 bid to pedal board flanges
Details

 08-18-2007
2.00
bagged forward deck bulkhead
Details

 08-12-2007
1.50
microed in flanges for pedal board
Details

 08-12-2007
1.50
cut material for forward deck
Details

 07-29-2007
4.00
installed 20 bid inside left tunnel brace for 20
Details

 07-28-2007
1.50
8 bid left outer tunnel braces
Details

 07-27-2007
2.50
8 bid left inner tunnel braces and prepped more
Details

 07-22-2007
1.50
sanded LG tunnel braces
Details

 07-20-2007
2.00
cut glass for landing gear supports
Details

 07-19-2007
2.00
installed 12 bid inside right front tunnel braces
Details

 07-15-2007
3.00
installed and made patterns for 8 bid inside right
Details

 07-11-2007
1.50
6 bid both right front tunnel braces

 07-10-2007
2.50
6 bid both right front tunnel braces
Details

 07-09-2007
1.00
sanded LG tunnel braces
Details

 06-22-2007
3.00
8 bid right inner rear tunnel braces and preped mo
Details

 06-09-2007
1.00
8 bid right outer rear tunnel braces
Details

 06-05-2007
1.50
floxed in landing gear tunnel braces
Details

 06-04-2007
2.00
cut and fit landing gear tunnel braces
Details

 06-01-2007
1.00
trimmed 3 bid
Details

 05-31-2007
1.50
laid-up 3 bid for langing gear tunnel braces
Details

 05-29-2007
1.00
cut glass for landing gear supports
Details

 05-27-2007
4.00
glass l. lower motor mount brace
Details

 05-26-2007
3.50
glass r. lower motor mount brace
Details

 05-25-2007
1.50
prepped to glass lower motor mounts
Details

 03-15-2007
3.00
jeweled firewall
Details

 03-13-2007
3.00
jeweled firewall
Details

 03-05-2007
3.00
welded motor mount
Details

 03-02-2007
3.00
welded motor mount
Details

 02-26-2007
3.00
fit and tacked motor mount
Details

 02-18-2007
3.00
sandblasted motor mount
Details

 02-07-2007
2.00
worked on motor mount
Details

 02-05-2007
2.00
worked on motor mount
Details

 02-04-2007
2.50
worked on motor mount
Details

 01-31-2007
2.00
worked on motor mount
Details

 01-29-2007
2.00
Machined on motormount
Details

 01-21-2007
2.50
made templates for glass for lower motor mounts
Details

 12-22-2006
2.50
prepared to glass starboard bottom motor mount
Details

 12-21-2006
2.00
cut,fit, and floxed in lower motor mounts
Details

 12-20-2006
1.00
floxed in phenolic for lower engine mounts
Details

 12-18-2006
1.00
drilled motor mount pilot hole cut and prepared ph
Details

 12-10-2006
2.00
laid out mounting hole on firewaal for engine moun
Details

 09-18-2006
2.50
embedded 2x2 phenolic block at station 157
Details

 02-01-2005
25.00
installed seat
Details

 01-01-2005
25.00
installed seat supports
Details

 11-01-2004
25.00
made and installed firewall
Details

 10-01-2004
25.00
made and installed rear bulkheads
Details

 03-01-2004
20.00
finished glassing inside
Details

 02-01-2004
20.00
glassed on the inside of fuselage
Details

 01-01-2004
20.00
set fuselage sheet in former and stared glassing i
Details

 12-01-2003
20.00
joined fuselage pieces
Details

 11-01-2003
20.00
built fuselage formers
Details

 05-01-2003
30.00
made fuselage pieces
Details

 04-01-2003
30.00
made fuselage pieces
Details

 03-01-2003
30.00
made fuselage pieces
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.