KitLog pro

Powered By Kitlog Pro v2.0

Randy's 750 Cruzer Project
Work Logs Found: 91
Category Work Time: 297 Hours
 Date
Hours
Work Log Summary

Details

 07-04-2019
2.00
Mounted left nav lights
Details
     

 06-25-2019
1.25
Finished drilling wing tip and installed access co
Details
       

 06-23-2019
2.00
Fit and drill wing tip
Details
     

 06-23-2019
1.00
Completed install of trailing edge
     

 06-22-2019
2.00
Removed LL, tightened mounts, & re-installed
Details

 06-22-2019
4.50
Fit and install trailing edge
Details

 06-16-2019
2.00
Installed light assembly and secured wiring
Details
       

 06-15-2019
1.50
Installed LL lens in wing
     

 06-07-2019
2.00
Drilled lens and assembled lights
Details
       

 06-02-2019
2.00
Trimmed LL lens
Details

 05-27-2019
3.50
Trimmed LL lens and drilled mounting holes
Details

 05-25-2019
2.00
Trimmed wing tip pieces
Details
     

 05-05-2019
4.00
Drilled wing and light mounting bracket
Details
     

 05-04-2019
5.50
Cut hole in wing for landing lights
Details
       

 04-28-2019
2.50
Rough assembly of the landing lights
Details
       

 04-13-2019
2.00
Riveted top wing skin over fuel tank
     

 03-30-2019
1.50
Prepared the other fuel access plate
Details
       

 03-24-2019
1.50
Prepared one of the fuel access plates
Details
       

 02-23-2019
7.50
Riveted top wing skins
       

 02-16-2019
3.00
Routed & secured wire and lines to rear spar
Details
       

 02-16-2019
2.00
Hooked up pitot & static air lines
Details
       

 02-09-2019
3.50
Worked on hoses: pitot tube, return fuel
Details
       

 02-02-2019
6.00
Trailing edge, flaperon brackets, & pitot tube
Details
       

 01-27-2019
2.50
Spent time studying landing light & pitot install
Details

 01-26-2019
3.50
Complete deburring the skins and spar
     

 01-20-2019
2.00
Installed wing tie down
Details
     

 01-19-2019
5.00
Began deburring skins

 01-13-2019
2.50
Finished drilling wing root top skins
Details
     

 01-12-2019
6.00
Started drilling wing root top skins
Details
       

 01-06-2019
3.50
Drilled spar line to final size and installed root
Details
       

 01-05-2019
5.00
Clecoed top skins and #30 drilled spar line
Details
     

 12-29-2018
4.50
Riveted bottom wing skins & install upper strut br
Details
       

 12-29-2018
1.50
Made & installed strain relief for return fuel lin
Details
     

 12-24-2018
3.50
Installed L brackets on top skin and deburred
Details

 12-09-2018
3.00
Deburred & cortec bottom wing skins
Details
     

 12-08-2018
5.00
Drilled upper strut fitting and deburred skins & s
Details
     

 12-02-2018
4.00
Finished drilling along main spar
Details
       

 12-01-2018
2.50
Began drilling along bottom main spar
Details
     

 11-17-2018
3.00
Deburred and clecoed remaining bottom skins
Details
     

 11-11-2018
2.50
Drilled, deburred, and riveted L brackets
Details
       

 11-10-2018
5.00
Clecoed bottom skins and cut L brackets
Details
     

 11-04-2018
1.50
Riveted rear spar to ribs
       

 11-03-2018
4.00
Riveted ribs to main spar
Details
       

 10-27-2018
5.00
Started on left wing skeleton
Details
       

 10-21-2018
2.00
Wrapped and stored right wing
Details
       

 10-13-2018
1.50
Prepared and installed the other fual access plate
Details
       

 10-06-2018
2.00
Installed nutplates on fuel access panel
Details
       

 10-06-2018
3.00
Finished drilling & clecoing wing tip
     

 09-29-2018
4.00
Mounted right wing tip nav light
Details
       

 09-29-2018
2.00
Created strain relief and fitted front wing tip
Details
       

 09-08-2018
5.00
Installed inboard trailing edge
Details
     

 07-07-2018
2.00
Trimed wing tip pieces
     

 06-09-2018
2.00
Removed rivets from top skin so I can install fuel
Details
     

 06-02-2018
1.50
Riveted bottom trailing edge
Details

 05-28-2018
5.00
Riveted top skins
Details
       

 05-27-2018
3.50
Cleco'd top skins in place
Details

 05-19-2018
2.00
Riveted L brackets to top skins

 05-06-2018
4.00
Riveted flaperon brackets to wing
Details
       

 04-28-2018
4.50
Drill & deburr leading edge rib holes
Details

 04-26-2018
1.00
Deburr top wing skins and spar

 04-23-2018
1.50
Deburr top wing skins and spar

 04-22-2018
3.00
Deburr top wing skins and spar

 04-21-2018
5.00
Remove and deburr top wing skins

 04-08-2018
4.50
Began drilling root top wing skins
Details
     

 04-07-2018
3.50
Finished drilling top wing skins
Details
     

 04-06-2018
1.00
Drilled #30 holes top wing skins on spar

 03-31-2018
5.00
Started drilling top wing skins
Details
     

 03-30-2018
1.50
Finished riveting bottom wing skins
       

 03-25-2018
6.00
Riveting bottom wing skins
Details

 03-24-2018
7.00
Debur, Cortech, reassemble bottom wing skins
Details
       

 03-18-2018
1.50
Debur wing skins and apply Cortec

 03-17-2018
3.00
Debur wing skins and apply Cortec

 03-05-2018
1.00
Drill bottom skins on spar to #20

 03-03-2018
2.50
Drill bottom skins on spar to #30
Details
       

 02-24-2018
2.00
Get wing spar level

 02-17-2018
9.00
Installed bottom skins and brackets
Details
       

 02-16-2018
4.50
Celco'd bottom skin. Cut L brackets.
Details
       

 02-11-2018
5.50
Applied Cortec and riveted wing skeleton
       

 02-10-2018
4.50
Installed spar tip. Drilled ribs for flaperons
       

 02-08-2018
1.00
Drill and debur root rib

 02-06-2018
2.00
Finished deburring & installing rear channel angle
     

 02-05-2018
1.00
Debur rear channel angles

 02-04-2018
4.00
Deburred more wing parts. Cleco'd the rear channel
     

 02-03-2018
6.00
Installed root rib. Debur rear wing channels.
       

 01-28-2018
3.50
Cleco'd wing ribs to main spar
     

 01-27-2018
7.00
Finished drilling and deburring the wing ribs
     

 01-20-2018
4.00
Drill and debur wing ribs

 01-13-2018
3.00
Drill and debur wing ribs

 01-07-2018
3.00
Drill and debur wing ribs

 01-06-2018
3.00
Drill and debur wing ribs

 01-01-2018
3.00
Locate and clean right wing components
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.