Powered By Kitlog Pro v2.0
Quentin’s Vision EX 229
Vision
Landing Gear
Work Logs Found:
108
Category Work Time:
215 Hours
Date
Hours
Work Log Summary
Details
12-18-2007
2.00
worked on mounting axels to landing gear
Details
12-17-2007
3.50
worked on mounting axels to landing gear
Details
12-12-2007
3.00
drilled and floxed on outer phenolics for axels
Details
12-08-2007
2.50
made and installled rubber cushions and lower pheo
Details
12-05-2007
2.00
Made phenolic spacers for axle attachment wt 21.5
Details
12-01-2007
1.50
sanded
Details
11-30-2007
1.50
sanded and filled
Details
11-29-2007
1.50
filled and sanded
Details
11-28-2007
2.00
filled and sanded
Details
11-27-2007
1.50
filled and sanded
Details
11-26-2007
1.50
Filled and sanded
Details
11-25-2007
3.00
filled and sanded
Details
11-23-2007
1.00
Trimmed LG legs
Details
11-23-2007
2.00
sanded and filled
Details
11-22-2007
1.00
Filled LG with micro for sanding
Details
11-22-2007
3.00
cleaned out brake line conduits and finished floxi
Details
11-21-2007
2.00
alligned and floxed gear phenolics on LG
Details
11-17-2007
3.00
prepped mounting of landing gear
Details
11-14-2007
2.50
made straps for LG hold down
Details
09-26-2007
1.50
trimmrd, fit bushings and installed on tail wheel
Details
12-18-2006
1.00
removed tunnel form and clean up
Details
12-09-2006
2.00
added 2 bid to tunnel
Details
12-08-2006
3.00
added 3 bid to tunnel
Details
11-03-2006
2.00
sanded flaws in first bagging and preped for next
Details
09-22-2006
2.00
cleaned up after bagging failed to hold vacuum
Details
09-20-2006
4.00
2 bid on tunnel
Details
09-18-2006
1.00
cut 7 bid to glass tunnel
Details
09-17-2006
3.00
fitted plug for LG tunnel into fuselage
Details
09-16-2006
1.50
Cut slot in fuselage for LG
Details
09-15-2006
2.00
made plug for main gear channel in fuselage
Details
08-22-2006
1.00
drilled and mounted tail wheel to spring
Details
08-18-2006
2.00
fitted tail wheel assy to tail spring
Details
08-14-2006
2.00
cleaned up and sanded tail spring after final bid
Details
08-13-2006
2.00
added last 5 bid to tail spring
Details
08-12-2006
3.00
sanded on gear
08-10-2006
2.00
sanded on main gear
Details
08-09-2006
2.50
sanding on main gear
Details
08-02-2006
3.00
started sanding toward finishing
Details
07-30-2006
2.00
add final 2 tapered bid
Details
07-29-2006
2.00
sanded and prepped for finally 2 bid taper
Details
07-28-2006
2.00
added 2 tapering bid
Details
07-27-2006
1.00
prepped for 4 bid of taper
Details
07-26-2006
2.00
sanded
Details
07-25-2006
2.00
sanded
Details
07-23-2006
1.00
prepped to bag right side
Details
07-23-2006
2.00
added 4 bid to right side total bid 8
Details
07-22-2006
2.00
added 4 layers bid to left leg
Details
07-09-2006
1.00
sanded on first coat of bid on llanding gear
Details
07-09-2006
3.00
added 4 bid to center section
Details
07-08-2006
2.00
sanded on first coat of bid on llanding gear
Details
07-07-2006
1.00
sanded on first coat of bid on llanding gear
Details
06-08-2006
2.00
sanded on first coat of bid on llanding gear
Details
06-07-2006
1.50
sanded on first coat of bid on llanding gear
Details
06-03-2006
1.50
sanded on first coat of bid on llanding gear
Details
06-02-2006
1.00
clean up bagging of gear
Details
06-01-2006
3.00
bagged 4 bid on right lower 1/3 side of gear
Details
05-23-2006
1.00
prepped material fo 4 bid right side
Details
05-21-2006
2.50
bagged 4 bid on left lower 1/3 side of gear
Details
05-20-2006
1.50
cut glass and material for bagging bid wrap
Details
05-18-2006
1.00
final shape on landing gear
Details
05-17-2006
2.50
shaped foam on LG
Details
05-16-2006
1.00
foamed trailing edge of landing gear
Details
05-15-2006
1.00
foamed leading edge of LG
Details
05-14-2006
2.00
removed foam and flox filled legs
Details
05-12-2006
1.50
sanded some
Details
05-11-2006
2.00
sanded some more
Details
05-10-2006
1.00
more sanding
Details
05-08-2006
3.00
sanded uni edges
05-07-2006
3.00
added last 10 uni to top of main gear
Details
05-05-2006
2.50
added 9 uni to top of main gear
Details
05-04-2006
2.00
prepped main gear for top uni
Details
03-07-2006
2.00
machined bolts for tailwheel assembly
Details
02-26-2006
2.00
powdercoated tailwheel assembly
Details
02-25-2006
2.00
stripped tailwheel and prepped for powdercoat
Details
11-14-2005
2.00
prepped for post-curing of lower side glass
Details
11-05-2005
3.00
4 uni to finish bottom mainspring total 16
Details
10-30-2005
2.00
added 3 uni to bottom of mainspring total 12
Details
10-28-2005
1.00
prep for more glass bagging
Details
10-23-2005
2.00
cleaned up last layers
Details
10-22-2005
2.00
prepped to lay uni on main spring
Details
10-22-2005
2.00
add 4 layers uni to bottom of mainspring total 9
Details
10-15-2005
1.50
finished sanding this layer
Details
10-14-2005
1.00
sanded some more
Details
10-12-2005
2.00
still sanding
Details
10-09-2005
2.00
still sanding
Details
10-08-2005
1.00
sanding first layers
Details
10-06-2005
1.50
Made bushings for tailwheel
Details
10-04-2005
1.50
Made bushings for tailwheel
Details
10-01-2005
2.50
layed 5 layers of uni on the lower side
Details
09-30-2005
2.00
setup bagging
Details
09-29-2005
2.00
tailwheel parts
Details
09-28-2005
4.00
cut uni for the main gear
Details
09-27-2005
2.00
machined on tail wheel assembly
Details
09-23-2005
3.00
bent tailwheel steel
Details
09-22-2005
1.50
cut more tailwheel part
Details
09-19-2005
2.00
cut parts for tail wheel assembly
Details
09-18-2005
2.00
shaped width of gear
Details
09-17-2005
2.00
matched legs in form
Details
09-14-2005
2.00
Shaped thickness taper on foam
Details
09-10-2005
1.50
added last layer of foam
Details
09-09-2005
2.00
attached first and second layers of foam
Details
09-04-2005
2.00
assembled an clamped foam to form
Details
09-03-2005
2.50
built form for the gear
Details
06-10-2005
2.00
wrapped 3 layers of glass on tail spring still nee
Details
06-07-2005
3.00
filled edges & wrapped 3 layers of glass on tail s
Details
06-06-2005
2.00
glassed other side of tail spring
Details
06-05-2005
2.50
glassed first layers of tail spring
Details
06-04-2005
2.00
formed foam for tail spring
Details
SITE NAVIGATION
Vision Home
Category
# Logs
# Hours
All
288
977
Controls
28
58
Fuselage
89
460
Horizontal Stab
2
60
Landing Gear
108
215
Miscellaneous
5
12
Seat
1
40
Spar
9
28
Weldments
31
60
Wings
15
44
Copyright © 2001-2024 Matronics. All Rights Reserved.