Date
|
Hours
|
Work Log Summary
|
Details
|
04-28-2022
|
4.00
|
Finished assemblying and riviting backseat backs
|
|
|
|
04-27-2022
|
8.50
|
Working on the backseat backs
|
|
|
|
12-14-2021
|
3.00
|
Make and install directions label
|
|
|
|
11-23-2021
|
7.50
|
|
Details
|
|
|
07-21-2021
|
7.00
|
Got both doors installed with struts
|
|
|
|
07-20-2021
|
8.50
|
Installing doors on fuselage.
|
|
|
|
07-16-2021
|
4.00
|
Set up doors for painting. Some buffing on fusela
|
|
|
|
07-13-2021
|
7.00
|
Insrtalled the front wheel mount and wheel.
|
|
|
|
07-12-2021
|
7.50
|
Got the plane on the main Berringer gear.
|
|
|
|
06-22-2021
|
3.00
|
Continuing paint prep
|
|
|
|
06-21-2021
|
9.00
|
Prepping for painting
|
|
|
|
06-18-2021
|
2.00
|
More sanding around doors and windows
|
|
|
|
06-16-2021
|
2.00
|
Continue filling and sanding around windows
|
|
|
|
06-15-2021
|
2.00
|
Sanding and prepping front windows
|
|
|
|
06-11-2021
|
5.00
|
Sanding and installing on rotissary
|
|
|
|
06-10-2021
|
7.00
|
Installl engine mount. Wireing fuses. Fit doora
|
|
|
|
06-09-2021
|
4.00
|
Wiring door close sensors. Wireing Alternator fuse
|
|
|
|
06-08-2021
|
4.00
|
Installed door lock magnets. Installed door window
|
|
|
|
06-07-2021
|
5.00
|
Got the front and rear door latch holes installed
|
|
|
|
06-07-2021
|
2.00
|
Got the doors runs sanded and buffed out
|
|
|
|
06-04-2021
|
5.00
|
More door sanding, filling, and repainting
|
|
|
|
06-03-2021
|
5.50
|
Prepped and clear coated doors. Sanded on Fusleag
|
|
|
|
06-02-2021
|
7.00
|
Finished prepping doors. Painted inside of doors
|
|
|
|
06-01-2021
|
1.50
|
Prep for door painting
|
|
|
|
05-28-2021
|
7.00
|
Fitted the door transparencies and prepped for pai
|
|
|
|
05-27-2021
|
8.00
|
Completed the door side of latcing
|
|
|
|
05-26-2021
|
9.00
|
Got the R door so it could be set on fuselage
|
|
|
|
05-25-2021
|
7.50
|
Finally got both door's latching mechanism working
|
|
|
|
05-24-2021
|
8.50
|
Finished L door and moved on to R door
|
|
|
|
05-21-2021
|
9.00
|
Another day working on the door latching
|
|
|
|
05-20-2021
|
8.00
|
Continue wortking on door latching system
|
|
|
|
05-19-2021
|
8.00
|
Fitting door hinges and starting on door locking
|
|
|
|
05-18-2021
|
9.00
|
Cut and trimmed the Right door to fit
|
|
|
|
05-17-2021
|
9.00
|
Cut and sanded left door to fit
|
|
|
|
05-14-2021
|
4.00
|
Epoxy'd both doors together and put on fuselage
|
|
|
|
05-12-2021
|
3.00
|
Fit the right door. Epoxied gas strut brace on bot
|
|
|
|
05-11-2021
|
7.00
|
Sanding windscreen and fitting doors
|
|
|
|
05-07-2021
|
6.50
|
Epoxied with bead powder and sanded plexiglass
|
|
|
|
05-06-2021
|
3.00
|
Applied multiple fiberglass strips to windshield
|
|
|
|
05-05-2021
|
5.00
|
Glued and preped the windshield
|
|
|
|
05-04-2021
|
4.00
|
Prepped and installed the frosnt windshield
|
|
|
|
05-03-2021
|
3.00
|
prepped land installed rear windows
|
|
|
|
04-29-2021
|
1.50
|
Fitting the windshield
|
|
|
|
04-28-2021
|
4.00
|
Cutting and fitting the windows and windshield
|
|
|
|
04-23-2021
|
8.00
|
Finished riveting on the front upper cowl.
|
Details
|
|
|
04-22-2021
|
8.00
|
Installed the cowl skybolt tabs.
|
Details
|
|
|
04-21-2021
|
5.00
|
Started installing the bases for the Skybolt faste
|
|
|
|
04-20-2021
|
8.00
|
Finished riveting the top fuselage forward tailcon
|
|
|
|
04-19-2021
|
3.00
|
Started riveting on the top skin behind baggage
|
|
|
|
04-15-2021
|
4.00
|
plated over, bondoed, & sanded forward naca vents
|
|
|
|
04-13-2021
|
4.00
|
Made Naca vents and install bracket for vent fans.
|
|
|
|
04-13-2021
|
2.50
|
Create GPS antennal backing plates
|
|
|
|
04-09-2021
|
4.00
|
Wired up the Overhead ventalation fans
|
|
|
|
04-08-2021
|
8.00
|
Continue worsking on ventalation fan enclosure
|
|
|
|
04-07-2021
|
4.00
|
Making the overhead fan enclosure
|
|
|
|
04-06-2021
|
6.00
|
Make mock up of overhead air distrib. fan ducts
|
|
|
|
06-12-2020
|
7.00
|
Side panels
|
|
|
|
06-11-2020
|
5.00
|
Continue installing side panels
|
|
|
|
06-10-2020
|
6.00
|
Installed the right passenger seat cover panel
|
|
|
|
05-04-2020
|
3.00
|
Install and seal the oil cooler holder on the fire
|
|
|
|
04-24-2020
|
4.00
|
Tested alternative panel labeling options
|
|
|
|
04-23-2020
|
8.00
|
Labeled most of the items on the panel
|
|
|
|
04-22-2020
|
6.00
|
Got panel ready for covering and mostly covered
|
|
|
|
04-21-2020
|
6.00
|
Continue laying out and drilling holes in the pane
|
|
|
|
04-20-2020
|
8.00
|
Layi0ut and cut holes for switches and EFII displa
|
|
|
|
04-17-2020
|
6.00
|
Made and tapped a ground plate. Painted subpanel
|
|
|
|
04-15-2020
|
8.00
|
EIS, backplates, and relay holder
|
Details
|
|
|
04-14-2020
|
2.50
|
Started designing a holder for the EIS box
|
|
|
|
04-13-2020
|
2.50
|
Installed flap position sensor
|
|
|
|
04-10-2020
|
6.00
|
Install flap system
|
|
|
|
04-08-2020
|
8.00
|
Worked on installing controll tubes and stick
|
|
|
|
04-07-2020
|
8.00
|
Baggage door
|
Details
|
|
|
04-03-2020
|
4.00
|
Riveted half lthe baggage door
|
|
|
|
04-02-2020
|
8.00
|
Buss Mgr bracket. Switch layout. Start baggage Dr.
|
|
|
|
03-31-2020
|
4.00
|
Wrapping center dadio stack
|
|
|
|
03-31-2020
|
3.00
|
Modified and wrapped Throttle and Prop brackerts
|
|
|
|
03-30-2020
|
8.00
|
Riveted covering and cut out openings
|
|
|
|
03-28-2020
|
2.50
|
covering the center c onsole radio stack
|
|
|
|
03-27-2020
|
8.00
|
Continue working on makinmg the radio stack
|
|
|
|
03-25-2020
|
8.00
|
Continue working on the radio stack center console
|
|
|
|
03-24-2020
|
8.00
|
Framework of center console radio rack
|
|
|
|
03-18-2020
|
4.00
|
Transponder rack
|
Details
|
|
|
03-17-2020
|
6.00
|
Developing and making transsponder brackets
|
|
|
|
03-16-2020
|
4.00
|
Finished cutting out the G3X panel openings
|
|
|
|
03-15-2020
|
8.00
|
Making land installing structural supports in Pane
|
|
|
|
03-10-2020
|
7.00
|
Worked on stiffening the fold down instrument pane
|
|
|
|
03-09-2020
|
8.00
|
Installed battery contactors plus work on panel
|
Details
|
|
|
02-19-2020
|
4.00
|
Installed fuel lines from tunnel to aircraft skin
|
|
|
|
02-18-2020
|
5.00
|
Installed a new parking brake acuator and pumps
|
|
|
|
02-17-2020
|
4.00
|
Installed battery cables thru firewall
|
|
|
|
02-14-2020
|
2.00
|
Install AHRS bracket
|
|
|
|
02-04-2020
|
9.00
|
Rudder peddles and the remaining brake lines.
|
|
|
|
02-03-2020
|
3.00
|
dudder peddles and brake lines
|
|
|
|
01-31-2020
|
8.00
|
Brake and fuel lines instulation.
|
|
|
|
01-30-2020
|
4.00
|
Continued working on the parking brake and rack
|
|
|
|
01-29-2020
|
8.00
|
See details
|
Details
|
|
|
01-28-2020
|
3.00
|
Started testing electric parking brake actuator
|
|
|
|
01-27-2020
|
9.00
|
Making new fuel lines. Didn't like Fridays attemp
|
|
|
|
01-24-2020
|
8.00
|
Continue working on fuel lines
|
|
|
|
01-23-2020
|
3.00
|
Designing the fuel pumps and filters layout
|
|
|
|
01-22-2020
|
4.00
|
Brake lines and fuel selector
|
Details
|
|
|
01-21-2020
|
6.00
|
Rudder peddles install and start brake lines
|
|
|
|
01-14-2020
|
3.00
|
Finished adjusting and installing the bsaggage bac
|
|
|
|
01-13-2020
|
3.00
|
Finished the other half of the back baggage wall
|
|
|
|
01-10-2020
|
9.00
|
Installing skybolt quarter turn fasteners
|
Details
|
|
|
01-07-2020
|
6.00
|
Continue working on the forward skin and panel
|
|
|
|
01-06-2020
|
9.00
|
Made panel attachments
|
Details
|
|
|
01-02-2020
|
3.50
|
Aligning and riviting baggage and rear seat panels
|
|
|
|
12-26-2019
|
6.00
|
Continued with the rear seat and baggage floors
|
|
|
|
12-23-2019
|
8.00
|
Baggage floor and rear seat cover ready to rivet
|
|
|
|
12-20-2019
|
6.00
|
Continue working on baggage floor, rear seat floor
|
|
|
|
12-19-2019
|
3.00
|
Preping passenger seat bottoms
|
|
|
|
12-13-2019
|
5.50
|
Riveted the passenger floor plans down
|
|
|
|
12-11-2019
|
5.00
|
Prep and start installing passenger floor pan
|
|
|
|
12-06-2019
|
7.50
|
Install smuft tubes and start back seat floor
|
|
|
|
09-24-2019
|
2.00
|
Continue riviting the tail cone to the forward fus
|
|
|
|
09-23-2019
|
2.00
|
Continue riviting the tail cone to the forward fus
|
|
|
|
09-20-2019
|
2.00
|
Riveting the tail cone to thefuselage
|
|
|
|
09-16-2019
|
7.00
|
Connect tail cone to fuselage
|
|
|
|
09-12-2019
|
7.00
|
Installed fire protective blanket
|
|
|
|
09-11-2019
|
8.00
|
Finishing the hinged panel
|
|
|
|
09-10-2019
|
4.00
|
Working on making a hinged fold down panel
|
|
|
|
08-21-2019
|
5.00
|
assermble the upper fuselage assembly
|
|
|
|
08-19-2019
|
4.00
|
Rear air vents
|
Details
|
|
|
08-16-2019
|
2.00
|
Started on upper forward fuselage assembly
|
|
|
|
08-15-2019
|
5.00
|
Installed L and R steps
|
|
|
|
08-14-2019
|
3.00
|
Installed the passenger fresh air vents
|
|
|
|
08-12-2019
|
5.00
|
installed the landing gear brackets
|
|
|
|
08-09-2019
|
8.00
|
Put in copilots floor and started on L gear suppor
|
|
|
|
08-08-2019
|
5.00
|
Finish riveting sides. Install Pilot floorboard
|
|
|
|
08-07-2019
|
6.00
|
Continue riveting side skins
|
|
|
|
08-05-2019
|
8.00
|
Continue riveting forward and mid side skins
|
|
|
|
08-02-2019
|
7.00
|
Installed side skins and started riveting
|
|
|
|
08-01-2019
|
3.00
|
Continue riveting the forwerd longerons
|
|
|
|
07-31-2019
|
3.00
|
start fiveting longerons to the firewall
|
|
|
|
07-16-2019
|
7.50
|
dimpling tghe side skins and finish counterrtsinki
|
|
|
|
07-12-2019
|
6.00
|
More drilling and countersinking
|
|
|
|
07-11-2019
|
6.00
|
Install and match drill the forward side skin
|
|
|
|
07-10-2019
|
6.50
|
Attached mid skins and match drilled
|
|
|
|
06-28-2019
|
9.00
|
Curved the 4 side skins bottoms
|
|
|
|
06-27-2019
|
6.00
|
Shaping the mid and forward Longeroons
|
|
|
|
06-26-2019
|
6.00
|
Riviting Mid and Fwd sections and Longerons
|
Details
|
|
|
06-25-2019
|
1.50
|
Completed drilling for the Right main gear
|
|
|
|
06-21-2019
|
4.50
|
mid seat supports and L main gear support
|
Details
|
|
|
06-20-2019
|
7.50
|
Seat pans and side structure
|
|
|
|
06-19-2019
|
7.00
|
Mated fwd land mid fuselage
|
|
|
|
06-18-2019
|
7.00
|
Continue riviting
|
|
|
|
06-17-2019
|
9.00
|
Riviting forward fuselage
|
Details
|
|
|
06-14-2019
|
8.00
|
Rivit forward bottom skin
|
Details
|
|
|
06-13-2019
|
5.00
|
Firewall cleko'd to forward bottom skin
|
Details
|
|
|
06-12-2019
|
2.00
|
Fwd Fusalage Floor- set parts and start match dril
|
|
|
|
01-02-2019
|
2.00
|
Continue working on the fwd fuselage bulkhead asm
|
|
|
|
01-01-2019
|
1.50
|
Continue working on the fwd fuselage bulkhead asm
|
|
|
|
12-28-2018
|
7.50
|
Fwd Fugelage bulkhead sub assembly
|
|
|
|
12-11-2018
|
3.00
|
Finished riveting the Firewall section 27
|
|
|
|
11-30-2018
|
2.00
|
Rivet in the Nose Gear Tension Fittings
|
|
|
|
11-28-2018
|
3.00
|
Continue riviting onfirewall parts
|
|
|
|
10-22-2018
|
2.00
|
Start firewall aft attachments
|
|
|
|
10-19-2018
|
2.00
|
Finish riveting firewall
|
|
|
|
10-16-2018
|
4.00
|
Riveting firewall
|
|
|
|
10-05-2018
|
3.00
|
Readying parts for firewall
|
|
|
|
08-24-2018
|
2.00
|
lContinue riveting lower aft fuselage
|
|
|
|
08-22-2018
|
5.00
|
Riveting Aft fuselage bottom skins on
|
|
|
|
08-21-2018
|
5.00
|
Finished DCrilling, deburring, and dimpling bottom
|
|
|
|
08-20-2018
|
6.00
|
Aligning and clekoing and match driling bottom ski
|
|
|
|
08-17-2018
|
5.50
|
Riveting the last part of the aft lower fuselage
|
|
|
|
08-16-2018
|
4.00
|
Started riveting aft of midsection
|
|
|
|
08-15-2018
|
4.00
|
More mid fuselage assembly
|
|
|
|
08-14-2018
|
8.00
|
Still working on mid fuselage
|
|
|
|
08-13-2018
|
9.00
|
|
|
|
|
08-10-2018
|
8.00
|
Completed the mid fuselage bulkheads
|
|
|
|
08-09-2018
|
5.00
|
Working on the Mid section aft spar
|
|
|
|
08-08-2018
|
6.00
|
Finished the forward mid fuselage bulkhead.
|
|
|
|
08-07-2018
|
7.00
|
Added gear legs and began riviting spar
|
|
|
|
08-06-2018
|
6.00
|
Assemble the Mid Fuselage Spar
|
|
|
|
08-02-2018
|
5.00
|
Finished inventorying
|
|
|
|
08-01-2018
|
6.00
|
Inventorying parts
|
|
|
|
07-19-2018
|
2.00
|
Begin unpacking and inventorying
|
|
|
|
01-04-2018
|
1.50
|
Longeron for rear fuselage
|
|
|
|
12-22-2017
|
9.00
|
Begin making the ribs for the rear fuselage
|
|
|