KitLog pro

Powered By Kitlog Pro v2.0

Dr. Pete's Xenos Build
Work Logs Found: 49
Category Work Time: 76 Hours
 Date
Hours
Work Log Summary

Details

 01-12-2020
1.25
Prep panels for paint
Details

 11-17-2019
1.50
Wire runs
Details

 11-09-2019
3.00
Integrate MGL V16 radio
Details

 10-20-2019
1.00
Mount radio and AHRS
Details

 10-13-2019
2.00
ELT mount in panel
Details

 09-12-2019
0.50
Update XPanel 5000 design
Details
     

 09-07-2019
0.80
Install insolated grounding blocks
Details
       

 08-02-2019
0.75
Wiring for EFIS power
Details
       

 07-27-2019
1.50
Cut and shape cover panels
Details
       

 06-06-2019
1.75
Cut double D holes
Details
       

 05-26-2019
0.75
Drill holes for switches
Details
       

 05-25-2019
0.75
Switch layout
Details
       

 05-13-2019
1.50
Instrument air
Details
     

 04-20-2019
2.00
Nutplates for radio remote mount
Details
       

 04-19-2019
1.50
Punch out radio remote
Details
       

 04-17-2019
1.00
Locate airspeed mounting holes
Details
       

 04-16-2019
1.75
Punch out hole for airspeed indicator
Details
       

 04-14-2019
1.30
Wiring ID and power conditioner test
Details
     

 04-13-2019
0.80
Sort through avionics wiring
Details
     

 04-11-2019
1.10
Install trim control
Details
       

 04-10-2019
1.25
Install nutplates for EFIS mount
Details
       

 04-06-2019
1.00
Mount power conditioner
Details
       

 04-04-2019
1.50
Setup and layout
Details
       

 03-31-2019
1.00
Panel layout
Details

 08-19-2018
0.25
Additional Panel Design
Details
     

 06-08-2018
2.50
Fit Fuse Panel
Details
       

 06-03-2018
1.00
Subpanel Support
Details
       

 05-13-2018
0.40
Cut Replacement Left side
Details
     

 05-08-2018
0.50
Subpanel Braces
Details

 05-08-2018
3.00
Countersink and Airspeed Cutout
Details
       

 05-07-2018
3.50
Panel Attachment
Details

 04-29-2018
0.50
Cut Port side Panel
Details

 04-28-2018
2.00
Layout and Install Subpanel Nutplates
Details
       

 01-12-2018
12.00
Accumulated Design Time
Details
       

 12-16-2017
0.60
Test Fit Instrument Panel
Details
     

 12-06-2017
0.50
Drill subpanel attach angle
Details

 12-03-2017
0.50
Sub-panel Angle Braket
Details

 11-23-2017
1.50
Rivet and Space Subpanel
Details

 11-19-2017
3.50
Control sub-panel
Details
       

 11-18-2017
1.00
Kitbashing Van's Mapbox
Details
       

 11-17-2017
1.50
Bend Mapox tabs
Details
       

 11-15-2017
1.50
Modify Mapbox
Details
       

 11-12-2017
1.25
Wiring to tail
Details

 10-29-2017
1.00
Assemble/plan map box
Details

 10-22-2017
0.30
Connect Instrument Air Tubing to Ports
Details

 10-21-2017
1.25
Install Instrument Air tubing
Details
       

 10-20-2017
1.50
Panel Layout Modifications
Details
       

 10-09-2017
1.00
Panel layout modifications
Details

 10-08-2017
2.50
Instrument Sub Panel Layouts
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.