Powered By Kitlog Pro v2.0
Dr. Pete's Xenos Build
Sonex XenosB
Instrument Panel
Work Logs Found:
49
Category Work Time:
76 Hours
Date
Hours
Work Log Summary
Details
01-12-2020
1.25
Prep panels for paint
Details
11-17-2019
1.50
Wire runs
Details
11-09-2019
3.00
Integrate MGL V16 radio
Details
10-20-2019
1.00
Mount radio and AHRS
Details
10-13-2019
2.00
ELT mount in panel
Details
09-12-2019
0.50
Update XPanel 5000 design
Details
09-07-2019
0.80
Install insolated grounding blocks
Details
08-02-2019
0.75
Wiring for EFIS power
Details
07-27-2019
1.50
Cut and shape cover panels
Details
06-06-2019
1.75
Cut double D holes
Details
05-26-2019
0.75
Drill holes for switches
Details
05-25-2019
0.75
Switch layout
Details
05-13-2019
1.50
Instrument air
Details
04-20-2019
2.00
Nutplates for radio remote mount
Details
04-19-2019
1.50
Punch out radio remote
Details
04-17-2019
1.00
Locate airspeed mounting holes
Details
04-16-2019
1.75
Punch out hole for airspeed indicator
Details
04-14-2019
1.30
Wiring ID and power conditioner test
Details
04-13-2019
0.80
Sort through avionics wiring
Details
04-11-2019
1.10
Install trim control
Details
04-10-2019
1.25
Install nutplates for EFIS mount
Details
04-06-2019
1.00
Mount power conditioner
Details
04-04-2019
1.50
Setup and layout
Details
03-31-2019
1.00
Panel layout
Details
08-19-2018
0.25
Additional Panel Design
Details
06-08-2018
2.50
Fit Fuse Panel
Details
06-03-2018
1.00
Subpanel Support
Details
05-13-2018
0.40
Cut Replacement Left side
Details
05-08-2018
0.50
Subpanel Braces
Details
05-08-2018
3.00
Countersink and Airspeed Cutout
Details
05-07-2018
3.50
Panel Attachment
Details
04-29-2018
0.50
Cut Port side Panel
Details
04-28-2018
2.00
Layout and Install Subpanel Nutplates
Details
01-12-2018
12.00
Accumulated Design Time
Details
12-16-2017
0.60
Test Fit Instrument Panel
Details
12-06-2017
0.50
Drill subpanel attach angle
Details
12-03-2017
0.50
Sub-panel Angle Braket
Details
11-23-2017
1.50
Rivet and Space Subpanel
Details
11-19-2017
3.50
Control sub-panel
Details
11-18-2017
1.00
Kitbashing Van's Mapbox
Details
11-17-2017
1.50
Bend Mapox tabs
Details
11-15-2017
1.50
Modify Mapbox
Details
11-12-2017
1.25
Wiring to tail
Details
10-29-2017
1.00
Assemble/plan map box
Details
10-22-2017
0.30
Connect Instrument Air Tubing to Ports
Details
10-21-2017
1.25
Install Instrument Air tubing
Details
10-20-2017
1.50
Panel Layout Modifications
Details
10-09-2017
1.00
Panel layout modifications
Details
10-08-2017
2.50
Instrument Sub Panel Layouts
Details
SITE NAVIGATION
Contact Builder
Sonex XenosB Home
Category
# Logs
# Hours
All
610
1277
Avionics
17
43
Cockpit
25
43
Communications
6
8
Controls
52
86
Cowling
27
34
Empennage
96
198
Engine
75
149
Finish
6
9
Firewall Forward
54
89
Fuel System
12
12
Fuselage
13
10
Hangar
60
261
Instrument Panel
49
76
Landing Gear
42
48
Legal-FAA
5
6
Miscellaneous
4
20
Prop
5
2
Research
15
62
Shop Supplies
2
4
Tools
13
63
Wings
32
54
Copyright © 2001-2024 Matronics. All Rights Reserved.