KitLog pro

Powered By Kitlog Pro v2.0

Joe & Steve's RV9A Project
Work Logs Found: 28
Category Work Time: 150 Hours
 Date
Hours
Work Log Summary

Details

 04-07-2018
2.50
install prop and set pitch
Details
     

 03-09-2018
1.50
install alternator, starter and ground cables
Details
     

 03-08-2018
1.00
oil & adapter
Details
     

 03-06-2018
3.50
FWF cleanup
Details
       

 03-05-2018
5.50
finish exhaust
Details
       

 03-03-2018
7.00
exhaust and GPS puck
Details
       

 03-02-2018
4.50
heater and plug wiires
Details
       

 03-01-2018
8.00
final rig FWF plumbing
Details
       

 02-28-2018
9.25
FWF plumbing
Details
       

 02-27-2018
5.00
FI controls cont.
Details
       

 02-26-2018
8.75
throttle and mixture bracket
Details
       

 02-24-2018
3.00
intake and FI
Details
       

 02-22-2018
4.50
FAB cont.
Details
     

 02-20-2018
4.00
filtered air box and throttle bracket
Details
       

 02-19-2018
6.00
FI and FAB
Details
       

 02-12-2018
1.75
finish up baffles and plenum
Details
     

 02-10-2018
7.25
baffles, plenum and panel
       

 02-07-2018
7.00
baffles cont.
Details
       

 02-03-2018
7.50
baffles cont. cont.
Details
       

 02-02-2018
6.75
baffles and preheat
Details
       

 02-01-2018
6.00
baffles cont.
Details
     

 01-30-2018
5.50
baffles cont.
Details
       

 01-29-2018
7.50
baffles cont.
Details
       

 01-24-2018
2.00
oil cooler
Details
       

 01-23-2018
8.50
baffles cont.
Details
       

 01-20-2018
6.50
cooling tin and plenum
Details
       

 01-19-2018
3.00
oil cooler mount
Details
     

 12-01-2017
6.50
hang engine
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.