KitLog pro

Powered By Kitlog Pro v2.0

Alton's Web Site
Work Logs Found: 65
Category Work Time: 394 Hours
 Date
Hours
Work Log Summary

Details

 10-16-2009
12.00
OAT and aileron pushrod tube
Details

 10-11-2009
8.00
Wings wiring
Details

 10-10-2009
1.00
Two steps forward, one step back
Details

 10-09-2009
32.00
Wings are on for good, bolted
Details

 08-27-2009
6.00
I drilled the magic hole for the wings.
Details
     

 08-15-2009
2.00
Started looking at the sweep
       

 08-15-2009
2.00
Plugged the wings into the fuselage.
Details
       

 03-21-2009
5.00
Right Wing Skins
Details
       

 02-28-2009
6.00
Riveted bottom skins on left wing
Details

 08-17-2006
8.00
More wingtips
Details

 08-13-2006
4.00
Wingtips
Details

 08-12-2006
16.00
Ailerons, flaps, wingtips
Details
       

 08-07-2006
4.00
Right wing is off the stand
Details
     

 08-06-2006
2.00
Riveted outboard top right skin
       

 08-04-2006
2.00
Riveted the inboard right top skin

 08-04-2006
1.50
Leak tested the right fuel tank
Details

 08-03-2006
12.00
Right fuel tank almost complete
Details
     

 08-02-2006
12.00
Right Fuel Tank
Details
       

 08-01-2006
8.00
Skins again
Details

 07-31-2006
8.00
skins
Details
       

 07-30-2006
6.00
more wing work
Details
       

 07-29-2006
1.50
Right Landing Light
Details
       

 07-29-2006
4.00
Ribs
Details
     

 07-27-2006
12.00
Drill, Debur, dimple, repeat
Details

 07-26-2006
10.00
Busted off on the right wing
Details
       

 07-25-2006
2.00
Pitot tube mast
Details
     

 07-24-2006
1.50
Left wing is on the cradle
Details
       

 07-24-2006
3.00
Fitting left aileron
Details
       

 07-23-2006
7.00
Flap brace, Aileron Gap seal, Wing Cradle
Details
       

 07-22-2006
3.00
Finished Aileron brackets
Details
     

 07-21-2006
1.50
Started working on the Aileron brackets
     

 07-20-2006
3.00
Finished Rivetting the Top left wing skin
Details
       

 07-19-2006
6.00
Began rivetting the top skins, - left wing
Details
       

 07-17-2006
1.00
misc
Details

 07-15-2006
1.50
Mounted the left tank
Details

 07-14-2006
1.50
Left Tank Leak test
Details
       

 07-13-2006
1.50
Left Tank install
Details
       

 07-12-2006
35.00
Left Tank Complete
Details
       

 03-19-2006
3.00
left fuel tank stiffners
Details
       

 03-19-2006
6.00
Final drilled the left tank
Details
       

 03-18-2006
3.00
Tank attach brackets
Details
       

 03-15-2006
5.00
Z-Brackets
Details
       

 03-14-2006
2.00
Riveted the left wing ribs
Details
     

 03-13-2006
2.00
Fabricated the tank joiner plate
     

 03-12-2006
2.00
Left Leading edge
Details
       

 03-11-2006
12.00
jigs and tables
Details
       

 03-10-2006
3.00
Tank Z- Brackets
Details

 03-07-2006
4.00
Wing Skins
Details

 03-06-2006
24.00
Flaps and Ailerons
Details
       

 03-05-2006
8.00
Wing stand
Details
       

 02-18-2006
8.00
aileron stiffners
Details
       

 02-05-2006
8.00
More debur and flute on the ribs
Details

 02-04-2006
8.00
Wing Ribs
Details
     

 01-29-2006
4.00
flaps and ailerons
Details
       

 01-22-2006
4.00
More Aileron Stiffners
Details

 01-22-2006
2.00
Left-Rear Spar.
Details

 01-22-2006
4.00
Aileron Stiffners
Details
       

 01-21-2006
8.00
Rear Spar
Details
       

 01-21-2006
0.00
More Rear Spar Pics
       

 01-20-2006
4.00
Tie-down Plates
Details
       

 01-14-2006
0.00
Wing Stand
Details
     

 01-14-2006
12.00
Tank and inspection plate attachment platenuts
Details
       

 01-13-2006
2.00
Inventory of wing Kit
Details

 01-12-2006
2.00
The Wings have arrived
Details
       

 01-12-2006
1.00
More unpacking pics
       










Copyright © 2001-2024 Matronics. All Rights Reserved.