KitLog pro

Powered By Kitlog Pro v2.0

Jeff's RV14A Builder's Log
Work Logs Found: 10
Category Work Time: 29 Hours
 Date
Hours
Work Log Summary

Details

 02-28-2017
3.50
Installed Beringer wheels and brakes

 02-27-2017
3.50
Attach main gear L&R axels
Details

 02-23-2017
0.01
more main gear leg install pics
       

 02-23-2017
9.50
Install main gear legs
Details
       

 02-22-2017
2.00
Nose gear link assembly install

 02-22-2017
3.00
Install upper gear braces to spar carry-through

 02-22-2017
2.00
Install nose gear wheel fork
       

 02-22-2017
1.50
Attach nose gear leg

 02-21-2017
1.75
Prep gear attach angles

 02-21-2017
2.00
Install engine mount
     










Copyright © 2001-2024 Matronics. All Rights Reserved.